HomeMy WebLinkAboutSW8980719_CURRENT PERMIT_20240315 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8ggD Zly DOC TYPE 2- CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 63 IS YYYYMMDD ✓ 1 Pybnrvy'. ROY COOPER 5 Governor ELIZABETH S.BISER u Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA lnteran Dueclor Environmental Quality March 1511, 2024 Attn: Douglas Heffernan, Owner 1205 Wind Soft Ct. Leland,NC 28451 Subject: Permit Renewal Post-Construction Stormwater Management Permit No. SW8980719 Hampstead Printing and Spring Branch Junction Pender County Dear Mr. Heffernan: Effective August 1, 2013, the Post-Construction Stormwater Management Program has been transferred from the Division of Water Quality("DWQ")to the Division of Energy,Mineral and Land Resources("DEMLR"). All previous references to DWQ will remain in older permits issued prior to August 1,,2013, until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit. On August 5,2009,the Governor signed Session Law 2009406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes,which was current and valid at any point between January 1, 2008, and December 31, 2010.The law extended the effective period of any permit that was set to expire during this time frame to three (3)years from its current expiration date. On August 2,2010,the Governor signed Session Law 2010-177,which granted an extra year for a total of four(4)years extension. The Division of Energy,Mineral and Land Resources received a complete 8-year.Permit Renewal Application for the subject permit on March 6'", 2024. The Division is hereby notifying you that permit SW8980719 has been renewed, updated, and re-issued on March 15", 2024, as attached. As requested,a copy of the current operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this stormwater permit does not imply that the site is currently in compliance. This permit shall be effective until April 20m,2031, which includes all available extensions, and does not supersede any other agency permit that may be required. The project shall be subject to the conditions and limitations as specified therein. This permit does not impose new or increased stormwater control"requirements; it clarifies the rules and requirements of this program to provide you with a better understanding of your obligations under this permit. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receiptof this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Logan Inman in the Wilmington Regional Office, at(910)796-7215 or logan.inman@deq.nc.gov. Sincerely, � 5�;William E. Toby Vinson, Jr., PE,CPM, Interim Director Division of Energy, Mineral and Land Resources D W&AoftM NorthCaroltna Department of Environmental Quality I Division of Energy.Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive:Extension I Wilmington,North Carolina 28405 910.7%.7215 2 State Stormwater Permit No. SW8 980701 Page 2 of 2 Enclosures: Attachment C—Permitting History copy of the Renewal Application Docutnents Copy of the current operation and maintenance agreement DES/Iwi: \\\Stormwater\Permits&Projects\1998\980719 HD\2024 03 permit 980719 cc: Wilmington Regional Office Stormwater File r AM ,� North Carolina Department of ErnironmentalQuality I Division of Energy.MneFal and Land Resources Wilmington Regional Office l 127 Cardinal Drive Extension I w@nington.North Carolina 28405 wamcruKuru, 910.7967215 Post-Construction Stormwater Management Permit No. SW8 980719 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Doug Heffernan, Owner Hampstead Printing and Spring Branch Junction 16881 Hwy 17, Hampstead, Fender County FOR THE construction, operation, and maintenance of a detention pond in compliance with the provisions of 15A NCAC 2H A000 (hereafter referred to as the "stormwater rules') and as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until April 20t�, 2031, and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit. The stormwater control has been designed to handle the runoff from 67,262 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated on page 2 of this permit, and per approved plans. Page 1 of 5 Post-Construction Stormwater Management Permit No. SW8 980719 1999 2009 Permitted Permitted Impervious Impervious (ftz) (ft2) Phase 1 Buildings 10,100 10,100 Asphalt 25,077 25,077 Concrete 1,591 1,591 Future 30,494 7,147 Phase 1 Total: 67,262 43,915 Phase 2 Buildings 0 8,300 Asphalt 0 14,217 Concrete 0 830 Phase 2 Total: 0 23,347 Project Total: 67,262 67,262 DEPARTMENT OF ENVIRONMENTAL QUALITY Project Name: Hampstead Printing Permit Number: SW8 980719 Location: Fender County Applicant: Mr. Douglas P. Heffernan, Owner Mailing Address: 1205 Wind Soft Ct. Leland, NC 28451 Original Application Date: November 6, 1998 Water Body Receiving Stormwater Runoff: Old Topsail Creek (CFR 87-12) Classification of Water Body: "SA" If Class SA, chloride sampling results: 158 ppm Pond Depth, feet: 6 Permanent Pool Elevation, FMSL: 38 Total Impervious Surfaces, ftz: 67,262 Offsite Area entering Pond, ftz: None, per Engineer Required Surface Area, ftz: 3,663 Provided Surface Area, ftz: 6,144 Required Storage Volume, ft': 5,589 Provided Storage Volume, ft': 12,613 Temporary Storage Elevation, FMSL: 39.75 Controlling Orifice: 1.5" pipe II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in it's entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface except roads. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Page 2 of 5 Post-Construction Stormwater Management Permit No. SW8 980719 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30,000 cubic feet. 6. The facilities shall be constructed, operated, and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 8. The permittee is responsible for verifying that the proposed built-upon area does not exceed the allowable built-upon area. 9. The runoff from all built-upon area on the project must be directed into the permitted stormwater control system. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 5 Post-Construction Stormwater Management Permit No. SW8 980719 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS 1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on-site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). 3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one of these changes. 4. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This request must be submitted within 90 days of the permit holder meeting one or more of the following: i. A natural person who is deceased, ii. A partnership, limited liability corporation, corporation, or any other business association that has been dissolved; iii. A person or entity who has been lawfully and finally divested of title to the property on which the permitted activity is occurring or will occur through foreclosure, bankruptcy, or other legal proceeding. iv. A person or entity who has sold the property, in whole or in part, on which the permitted activity is occurring or will occur. V. The assignment of declarant rights to another individual or entity; vi. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2), Page 4 of 5 Post-Construction Stormwater Management Permit No. SW8 980719 b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of this permit until the Division approves the transfer request. a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an annual certification completed by either the permittee or their designee confirming the project's conformance with permit conditions. e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit updated, renewed, and reissued this the 15th day of March 2024. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Will�oby�on, Jr., PE, CPM, Interim Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 980719 Page 5 of 5 Attachment C- Permitting History Hampstead Printing and Spring Branch Junction Permit No.SW8 980719 Approval Permit Action Verson Description of the Changes DateOriginal Construction, operation and maintenance of a detention pond in compliance with the 4/20/1999 Approval 1'0 provisions of 15A NCAC 2H .1000. The stormwater control has been designed to handle the runoff from 67,262 square feet of impervious area. 10/16/2009 2.0 Renewal/Plan Expires 4/20/2019(2023 from 4 yr extension). Reallocated impervious surface Revision areas. 3/15/2024 Renewal 3.0 Expires 4/20/2031 Page 1 of 1 Permit Number: Swepy?D 71�7 (to be provided by DFVQ) Drainage Area Number: Wet Detention Basin Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. /1 The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. N ao This syste check one): v ❑ m does does not incorporate a vegetated filter at the outlet. This system check one): Q7 ❑ does [A does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer apPlication. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: �J-(N �/0 0 7y (to be provided by DIVQ) Drainage Area Number: BMP element: Potentialproblem: How 1 will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation Sediment Removal Pe anen Pool ----------------- Volume Sediment Removal Elevation_ Volume Bottom Elevatio -ft Min. ---------- -- - ----------- ----- Sediment Bottom Elevation_ 1-ft ❑. Storage Sediment FOREBA Y Storage MAIN POND Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: 0 O O (to be provided by D[VQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to -prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying, The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray), the basin surface. Form SW401-Wet Detention Basin I&M-Rev.2 Permit NumberSk/ 0 2/ / (to be provided by DlVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the/system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: /✓lf/7/ Title: Address: )61, 17 Phone: 7 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. `Sal ; a Notary Public for the State of 1 County of tom' do hereby certify that Gov S(ct to personally appeared before me this day of JUL 2 8 2009 and acknowledge the due execution of the forgoing wet detention ba in maintenance requirements. Witness my hand and official seal, oEPIClAl.SEdl. � _3 Namn R�blie.Nar�h Cnrolirm Coun(}of Ponder _ : SHELLEYBE kSt MV Commission Expires SEAL Fj�� JUG- c° � 20p9 My commission expires w l'i3 Form S W 401-Wet Detention Basin I&M-Rev.2 DEMLR USE ONLY Date eceiv Fee Paid Permit Number o (7 STATE STORMWATER: PERMIT INFORMATION UPDATE APPLICATION FORM There is NO FEE for updating project name or permittee information. This form is to only to be used by the current permittee to notify the Division of. 1) changes to the Point of Contact(signing official) for the current permittee (LLC, Corporation, HOA or POA); 2) changes to the mailing address,phone number or email address of the current permittee; 3) changes to the name of the project;and 4) changes to the legal corporate name as documented by a Name Change or Merger riled with the NCSOS. A. NEW PERMIT INFORMATION State Stormwater Permit Number. S UJ 5 9,FO 71 9 Are you updating(check all that apply): If so, please provide the updated information: ❑ Project name r�ioTih' �/yrYe-4 �C ❑Corporation Name' ❑ Permit Contact Name2.3 ❑ Permit Contact Title Mailing Address; ❑ Phone number p L1 ,�2 y ❑ Email address ,0 ` ' Provide documentation such as a Name Cher1ge/Merger filed with the NCSOS. z Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance with 15A NCAC 021-1 .10400). 3 If more than one point of contact or mailing address is being changed,please attach a separate sheet. B. CERTIFICATION OF PERMITTEE I, JJ��il*9 /��`�/ZN/b>/ , the current permittee, hereby notify DEMLR that I am making the changes as listed in Section A abov er attest that this application for an update to the permit information currently on file is accurate and complet the bes of my kr Signature: (yJv Date: �O _ a Notary Public for the State of Nq d--1 CA"to)),44 County of /VGti Yfy,n 0✓c/- do hereby certify thhatr fleu,/w% a t- eri4ctn personally appeared before me this the��day of /�r ^A 20 El 7, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, „pHN111IIrp , a� tt�� (Notary Seal) !E C E I V MAR 0 6 2024 %�O?ARy';�p=� Notary Signature080 BY My commission expires to-2 $ L C7 2 �-'4;4%JVER CO,y� Stormwater Permit Information Update Form Page 1 of 1 May 11,2017 DEMLR USE ONLY Date R ce ed Fee Pa Permit Number z 50 ft:- cJ8 G 7/ NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3). the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398(SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: .w EY R 0 7 9 2. Project name: I/ /)94 S�/��'/�c��v7iil/G i7/Y� f gley t /✓/�IIwalll 1-0 3. Project strlejt address: Ili�i �7r/ _ g /7 City: AmA6/��/7C� County: P,/5 ZIP 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/abouVdivisions/energv- mi n eral-land-resources/energy-m inera I-land-rules/sto rmwate r-prog ra m/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made,please complete either the Permit Update form or the Permit Transfer form available at https://deg.nc.gov/abouVdivisions/energy-mineral-land- resources/energv-mineral-land-rules/stormwater-program/postconstruction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Compa a/Or n' tion: 2woillft 2. Signing Official's Name: In 3. Signing Official's Title: /9G✓NEP 4. Mailing Address: _1;�kOl city: Gf.Gm9001 State: VC� ZIP : 5. Street Address: S17blz City: State: ZIP : _ 6. Phone: ( 9/0 ) y?7/ V�7& Email: �EGERVE MAR 0 6 2024 By: Stormwater Permit Renewal Form Page 1 of 3 May 11,2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters)orDEMLR Central Office(Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORK9. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: L 1. A permit application processing fee of$505.00 payable to NCDEQ. ✓/ 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC)—a manager or company official as those terms are defined in G.S. 57D"North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. (IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. (IF APPLICABLE]When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation,which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration ECEIV MAR 0 6 2024 BY:��_ Stormwater Permit Renewal Application Form Page 2 of 3 May 1 J;2018 �D. PERMITTEE'S CERTIFICATION I, Vi'ICW Ste^bL`D" the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site(or I will obtain a copy and it will be kept on site), that 1 am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, c can compl Signature: Date: NOTARIZATION:, I 1, 1/;nct'f- a Notary Public for the State of / c •v�r1�`"l County of tit�.� uwv l� do hereby certify that Dseg//4P I ✓I JA% personally appeared before me this the (D day of 2011--, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, 00pgU1"FRI"n' . (Notary Seal) ••r.•�N( HEl/ye Notary Signature: � A s My commission expires ER COS 'V41y11 Y114r��•` ECEI W E MAR 0 6 2024 Stormwater Permit Renewal Application Form Page 3 of 3 May 11,2018 � .. . � i .J. � � � ' L� a ,�. �' _ J TE 09028 State Stormwater Management Systems Permit No. SW8 980719 Hampstead Printing Stormwater Project No. SW8 980719 Pender County Engineer's Certification I, Phillip G. Tripp as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, Hampstead Printing (Project) for_Mr. Doug Heffernan (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: SEAL Signature 0���`-NN 1CAR��i,� ............ 'FESsj Registration Number 17374 SEAL s Date OC( =S 17374 Via = ���i,�OREGO?, ;%%%�• r State Stormwater Management Systems Permit No. SW8 980719 Certification Requirements: Page 2 of 2 A-1. The drainage area to the system contains approximately the permitted acreage. �2. The drainage area to the system contains no more than the permitted amount of built-upon area. —9-13. All the built-upon area associated with the project is graded such that the runoff drains to the system. _4. The outlet/bypass structure elevations are per the approved plan. @:;;n 5. The outlet structure is located per the approved plans. I6. Trash rack is provided on the outlet/bypass structure. �7. All slopes are grassed with permanent vegetation. _9118. Vegetated slopes are no steeper than 3:1. �9. The inlets are located per the approved plans and do not cause short- circuiting of the system. A10. The permitted amounts of surface area and/or volume have been provided. �11. Required drawdown devices are correctly sized per the approved plans. D12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. �14. The dimensions of the system, as shown on the approved plans, are provided.