HomeMy WebLinkAboutSW8980701_CURRENT PERMIT_20231220 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8 9 s 0l 0 i
DOC TYPE ® CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE 202b 12 20
YYYYMMDD
�srarE v
ROY COOPER
Governor
ELIZABETH S.BISER .� �,
secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
interim Director Envfro=enral Quality
December 20'", 2023
Matt Holdings, LLC
Attn: Timothy J. Matt, Manager
1924 Lunar Lane
Wilmington,NC 28405
Subject: Permit Renewal
Post-Construction Stormwater Management Permit No. SW8980701
Triple T Parts and Equipment
New Hanover County
Dear Mr. Matt:
Effective August 1, 2013 the Post-Construction Stormwater Management Program has been transferred from the
Division of Water Quality("DWQ")to the Division of Energy, Mineral and Land Resources("DEMLR"). All
previous references to DWQ will remain in older permits issued prior to August 1, 2013 until they are modified.
Please note that this permit will now reference DEMLR as the Division responsible for enforcement of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any.development approval
issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes,which
was current and valid at any point between January 1, 2008, and December 31,2010. The law extended the
effective period of any permit that was set to expire during this time frame to three(3)years from its current
expiration date. On August 2, 2010, the Governor signed Session Law 2010-177,which granted an extra year for
a total of four(4)years extension.
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on December 19', 2023. The Division is hereby notifying you that permit SW8980701 has
been renewed, updated, and re-issued on December 20", 2023, as attached. As requested, a copy of the current
operation and maintenance agreement is also enclosed. Please be aware that the renewal and re-issuance of this
stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until August 12`h,2031,which includes all available extensions, and does not
supersede any other agency permit that may be required. The project shall be subject to the conditions and
limitations as specified therein. This permit does not impose new or increased stormwater control requirements; it
clarifies the rules and requirements of this program to provide you with a better understanding of your obligations
under this permit. Failure to comply with these requirements will result in future compliance problems. Please
note that this permit is not transferable except after notice to and approval by the Division.
If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30)days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center,
Raleigh,NC 27699-6714,or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Logan Inman in Wilmington Regional Office, at
(910) 796-7215 or logan.inman@deq.nc.gov.
Sincerely, //�(�
Lrl'Y1� o
S William E. Toby Vinson, Jr., PE, CPM, Interim Director
Division of Energy, Mineral and Land Resources
r«:m D 0 Q�- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405
910.796.7215
State Stormwater Permit No. SW8 980701
Page 2 of 2
Enclosures: Attachment C—Permitting History
copy of the Renewal Application Documents
Copy of the current operation and maintenance agreement
DES/lwi: %Stormwater\Permits&Projects\1 998\980701 HD\2023 12 permit 980701
cc: Wilmington Regional Office Stormwater File
®���� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
W'dmington Regional Office 1 127 Cardinal Drive Extension I Wilmington,North Carolina 28405
910.7916.7215
State Slormwater Management Systems
Permit No. SW8980701
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST-CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Matt Holdings, LLC
Triple T Parts and Equipment
2715 Highway 421, Wilmington, New Hanover County
FOR THE
operation and maintenance of a wet detention pond in compliance with the provisions of 15A
NCAC 2H .1000 effective September 1, 1995 (hereafter referred to as the "stormwaterrules')
and as outlined in the application, approved stormwater management plans, supplement,
calculations, operation and maintenance agreement, recorded documents, specifications, and
other supporting data (the "approved plans and specifications") as attached and/or on file with
and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR"). The project shall be constructed, operated, and maintained in accordance with
these approved plans and specifications. The approved plans and specifications are
incorporated by reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until August 1211, 2031, and shall be
subject to the following specified conditions and limitations. The permit issued shall continue in
force and effect until the permittee files a request with the Division for a permit modification,
transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance
of this permit does not prohibit the Director from reopening and modifying the permit, revoking,
and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and
regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 of this permit. The stormwater control has been designed to
handle the runoff from 252,234 square feet of impervious area.
Page 1 of 5
State Stormwater Management Systems
Permit No. SW8980701
3. The tract will be limited to the amount of built-upon area indicated in section 1.6 of this
permit, and per approved plans. The built-upon area for the future development is limited
to 0 square feet.
4. All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
5. The runoff from all built-upon area within the permitted drainage area(s) of this project
must be directed into the permitted stormwater control system.
6. The fallowing design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a. Drainage Area, acres: 7.42
Onsite, ftz: 323,215
Offsite, ftz: 0
b. Total Impervious Surfaces, ftz: 252,234
C. Design Storm, inches: 1
d. Pond Design Depth, feet: 7
e. TSS removal efficiency: 90%
f. Permanent Pool Elevation, FMSL: 10
g. Permanent Pool Surface Area, ft2: 11,700
h. Permitted Storage Volume, ft3: 27,331
1. Temporary Storage Elevation, FMSL: 12
j. Controlling Orifice: 2.25"0 pipe
k. Permitted Forebay Volume, ft3: 4,877
1. Receiving Stream/River Basin: NE Cape Fear River/ Cape Fear
M. Stream Index Number: 18-74-61
n. Classification of Water Body: "SC Sw"
IL SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built-upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re-vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8980701
5. Decorative spray fountains will not be allowed in the stormwater treatment system, as
the permanent pool volume is less than 30,000 cubic feet.
6. The facilities shall be constructed, operated, and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, the permittee shall cause a certification from
an appropriate designer for the system installed to be submitted, certifying that the
permitted facility has been installed in accordance with this permit, the approved plans
and specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A modification
may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
9. Access to the stormwater facilities for inspection and maintenance shall be maintained
via appropriate recorded easements at all times.
10. No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited to,
those listed below. For changes to the project or SCM that impact the certifications, a
new or updated certification(s), as applicable, will be required and a copy must be
submitted to the appropriate DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size
including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement
on-site stormwater systems. These additional or replacement measures shall receive a
permit from the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days
prior to the expiration date of this permit. The renewal request must include the
appropriate application, documentation and the processing fee as outlined in Title 15A
NCAC 02H.1045(3).
Page 3 of 5
State Stormwater Management Systems
Permit No. SW8980701
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT
INFORMATION. The permittee shall submit a completed Permit Information Update
Application Form to the Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to
and approval by the Director. Neither the sale of the project and/or property, in whole or
in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate
application, documentation and the processing fee as outlined in 15A NCAC
02H.1045(2). This request must be submitted within 90 days of the permit holder
meeting one or more of the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
V. The assignment of declarant rights to another individual or entity,
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on-site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and
conditions of this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved
plans, application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee
at all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
c. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the
stormwater rules is subject to enforcement procedures as set forth in NCGS 143
Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division
an annual certification completed by either the permittee or their designee confirming
the projects conformance with permit conditions
Page 4 of 5
State Stormwater Management Systems
Permit No. SW8980701
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the
permitted site does not meet one or more of the minimum requirements of the permit.
Within the time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum requirements. The
permittee shall provide copies of modified plans and certification in writing to the
Director that the changes have been made.
f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals
to do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated, and reissued this the 20th day of December 2023.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
a / f(..X-�
f William E. Toby Vinson, Jr., PE, CPM, Interim Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit No. SW8 980701
Page 5 of 5
Attachment C-Permitting History
Triple T Parts and Equipment
Permit No.SW8 980701
Approval Date Permit Action BIMSVersion Description of the Changes
High Density Commercial Stormwater Project-construction,operation and maintenance of a detention
Original pond in compliance with the provisions of 15A NCAC 2H .1000.The stormwater control has been
9/15/1998 Approval 1.0 designed to handle the runoff from 253,494 square feet of impervious area.This pond is designed to be
operated with a vegetated filter.
High Density Storrnwater Project-construction,operation and maintenance of a wet detention pond in
8/12/1999 compliance with the provisions of 15A NCAC 2H.1000.The stormwater control has been designed to
handle the runoff from 252,234 square feet of impervious area.
High Density Storrawater Project-construction,operation and maintenance of a wet detention pond in
728/2000 Modification compliance with the provisions of 15A NCAC 2H.1000.The stormwater control has been designed to
tExpires
le the runoff from 248,915 square feet of impervious area.
Density Commercial Project-operation and maintenance of a wet detention pond in compliance with
7242009 Renewal 2.0rovisions of 15A NCAC 2H.1000 effective September I, 1995.The storrwater control has been
gned to handle the runoff from 252,234 square feet of impervious area.
1220/2023 Renewal 3.0 8/12/20 11
Page 1 of 1
DEMLR USE ONLY
Date R ceiv d Fee Paid Permit Number
11 SW O -7 0
STATE STORMWATER:
PERMIT INFORMATION UPDATE APPLICATION FORM
There is NO FEE for updating project name or permittee information.
This form is to only to be used by the current permittee to notify the Division of-
1)changes to the Point of Contact(signing official) for the current permittee (LLC, Corporation, HOA or POA);
2)changes to the mailing address, phone number or email address of the current permittee;
3)changes to the name of the project;and
4) changes to the legal corporate name as documented by a Name Change or Merger filed with the NCSOS.
A. NEW PERMIT INFORMATION
State Stormwater Permit Number: SW8980701
Are you updating If so, please provide the updated information:
(check all that apply):
❑ Project name
❑ Corporation Name'
❑ Permit Contact Name2.3
❑ Permit Contact Title
x❑ Mailing AddresS3 1924 Lunar Lane, Wilmington, NC 28405
❑ Phone number
❑ Email address
Provide documentation such as a Name Change/Merger filed with the NCSOS.
2 Provide supporting documentation such as NCSOS filing. The permit contact's position must be in accordance
with 15A NCAC 02H .1040(1).
3 If more than one point of contact or mailing address is being changed, please attach a separate sheet.
B. CERTIFICA/���JON OF PE/RMITTEE
I, JET `�� � the curre tpermittee, hereby notify DEMLR that I am making the changes as listed
in Section A above. I forth st that this lication for a update to the permit information currently on file is accurate
and complete to the be t� my kn wledd
Signature: �\JL� Date:
1, Y a Notary Public for the State of Mu 1- ( IWDf tea,
C
tclar do hereby certify that 52 ��
fore me this the 1_day of K IIS�/QMIXr 20�, and acknowledge the due
o g instrument. Witness my hand and official seal,
ESU
NOV 1 1 No 2023 i
My commission expires ��lo Ij
Stormwater Permit Information Update Form Page 1 of 1 May 11,2017
."�� '}.r...
i 1 , �.
fJ,
' � S
l -
��
11 1 � .. ,.
{ ' � � �,
f i
Y�
DEMLR USE ONLY
Date ceiv Fee Paid Permit Number
l'TFO 10 Ja 2,50-!f— 1 SoJ 8 S' D 70
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holdershall renew theirhigh density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398(SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8980701
2. Project name: Triple T Parts and Equipment
3. Project street address: 2715 Hwy 421N
City: Wilmington County: New Hanavoer
ZIP : 28401
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy-
m i n eral-la n d-resou rces/en a rgy-mi n era I-land-rules/stormwater-prop ra m/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at. https://deg.nc.gov/abouttdivisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Matt Holdings, LLC
2. Signing Official's Name: Jeff Battle
3. Signing Official's Title: VP
4. Mailing Address: 1924 Lunar Lane
City: Wilmington State: NC
ZIP : 28405
5. Street Address: 1924 Lunar Lane
City: Wilmington State: NC
ZIP : 28405
6. Phone: (910) 540-5529 Email: tripletibC@gmail.com
t=
NOV 17 2023
,F
",rya
n,u:
Stormwater Permit Renewal Form Page 1 of 3 May 11,2018'
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/0RV19. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
X 1. A permit application processing fee of$505.00 payable to NCDEQ.
JB 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation—a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC)—a manager or company official as those terms are defined
in G.S. 57D"North Carolina Limited Liability Company Act;"
c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership—the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
JB 4. O&M Agreements, Please select one:
❑ 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
® I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
JB 5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s)confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE]When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
hftps:/Apvww.sosnc.gov/online services/search/bv title/ Business Registration
ECEIVE
NOV 17 2023
Stormwater Permit'Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or 1 will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built-upon area and to submit-he proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. II i ation Ided on this permit renewal application is, to the best of my
knowledge, correct and co e.
Signature: i Date: �/ _1/' "
NOTARIZ N6N:' y�/�
I, I 1 r lW'OhA a Notary Public for the State of
CCd vol County of palyk;i , do hereby certify
that <ar� -B-2-W personally appeared before me
this thhaaaae'�����a��� ar((�'' day of N6VQ.m6, 20 ate, and acknowledge the due
exec�rof the fo7ginstrument. Witness my hand and official seal,
€€�`` NpTARy S,`=
Mr SIRES
- a�
( = t V
% o PUBJ.XC' rc�r
Nota t
NNgrMmnllM�
My commission expires
ECEIVE
NOV 17 2023
BY:
Stormwater Permit Renewal Application Form Page 3 of 3 May 11,2018
\l
Permit No. .SGu g q Eo701 iO W
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a wet detention basin supplement for each basin,
design calculations, plans and specifications showing all basin and outlet structure details, and a signed and
notarized operation and maintenance agreement.
I. PROJECT INFORMATION (please complete the following information):
Project Name: _Triple T Parts & Equipment
Contact Person: Charles Cazier Phone Number: 910 _763-5100
For projects with multiple basins, specify which basin this worksheet applies to:
Basin Bottom Elevation 3.0—
ft. (average elevation of the floor of the basin)
Permanent Pool Elevation 10.0 ft. (elevation of the orifice)
Temporary Pool Elevation 12.0_ft. (elevation of the discharge structure overflow)
Permanent Pool Surface Area 11.700_sq.ft. (water surface area at the orifice elevation)
Drainage Area 6.92 ac. (on-site and off-site drainage to the basin)
Impervious Area 5.80_ac. (on-site and off-site drainage to the basin)
Permanent Pool Volume 47.934_ cu.ft. (combined volume of main basin and forebay)
Temporary Pool Volume 27.331_cu.ft. (volume detained above the permanent pool)
Forebay Volume 4 877_cu.ft.
SA/DA1 used 0.0360 (surface area to drainage area ratio)
Diameter of Orifice 2.25 in.
Design TSS Removal 90 % (85% TSS removal required, see item k below)
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices manual
(N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Form SWU-102 Rev 1/August 1998 Page 1 of 3
Applicants Initials
eat-1 a. The temporary pool controls runoff'from the 1 inch storm event.
G17G b. The basin length to width ratio is greater than 3:1.
CQ-1 c. The basin side slopes above the permanent pool are no steeper than 3:1.
Cc� d. A submerged and vegetated perimeter shelf at less than 6:1 is provided (show detail).
e. Vegetation above the permanent pool elevation is specified.
(Z f. An emergency drain is provided to empty the basin.
-;t-- g. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
CPC It. The temporary pool draws down in 2 to 5 days.
CpG i. A trash rack is provided for both the overflow and orifice.
C_6 C j. The forebay volume is approximately equal to 20% of the total basin volume.
k. Sediment storage is provided in the permanent pool.
t fx 1. A 30-foot vegetative filter is provided at the outlet2 (include erosive flow calculations).
Ct2 in. Recorded drainage easement for each basin including access to nearest right-of-way.
6_01n n. A site specific operation and maintenance (O & M) plan is provided.
/pG o. A vegetation management/mowing schedule is provided in the O & M plan.
p. Semi-annual inspections are specified in the O & M plan.
GOCG q. A debris check to be performed after every storm event is specified in the O & M plan.
1lJG r. Specific clean-out benchmarks are specified in the O & M plan (elevation or depth).
[j:;C s. A legally responsible party is designated in the O & M plan3 (include name and title).
CLl_ t. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified to be performed prior to use as a wet detention basin.
4-
Footnotes:
1 when using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90%TSS removal.
3 The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a
resident of the subdivision has been named the president.
M. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention system is defined as the wet detention basin, forebay, non-integrated pretreatment
Systems (pretreatment other than forebayss), and the vegetated filter if one is provided.
This system (check one) ❑ does 9 does not incorporate a vegetated filter.
This system (check one) ❑ does [!'does not incorporate non-integrated pretreatment.
Maintenance activities shall be performed as follows:
1. After every significant runoff producing rainfall event and at least monthly:
Fonn SWU-102 Rev 1/August 1998 Page 2 of 3
a. ,Inspect the wet detention system for sediment accumulation, erosion, trash accumulation, grass
cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days.
2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative
Cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth. Removed sediment shall be disposed of in an appropriate
manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a
wet detention basin or stream, etc.)
The original design depth is: 7'
The sediment removal benchmark depth is: 5.25'_
5. Remove cattails and other indigenous wetland plants when they cover 75% of the basin surface. These
plants shall be encouraged top grow along the basin perimeter.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent possible.
7. All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the above
maintenance procedures. I agree to notify DWQ of any problems with the system or changes in the name of the
project, responsible party, or address.
Print name: _Tim Matt
Address: 1924 Lunar Lane
Phone: 256-2194
Title: esi owner
Signature:
Date: lil qcf
/l +
1, mom eA V. Lou�l�I i h a Notary Public Tfor� the,$tate of �/pd� CO-VO I hn--
County of M eW Q,vro do hereby certify that i t i r/1u�1'
personally appeared before me this 14-4 day of ::J(tiKz_ , 19 C11 and acknowledge the
due execution of the forgoing infiltration system maintenance requirements. Witness my hand and official seal,
4d
\"
�
V - l "��\Gp v LOUGyGZ
A-Ai *0TARY a
My commission expires o 10116
= r e y
=_z: ecio
%CJ
QfN
una �
Form SWU-102 Rev 1/August 1998 Page 3 of 3
.q
.Y' , 'p
.�... . t� ..r
A'' -
c�� ��
.y,.
• J /
a): '
&i.5•. is 1
j�� •.�, .. t•'
' ..1 .,,.,t°
.i
TE 00063
State Stormwater Management Systems
Permit No. SW8 980701 Modification
Triple T Parts and Equipment
Stormwater Project No. SW8 980701
New Hanover County
Engineer's Certification
I, Phillip G. Tripp as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/week444i
tine) the construction of the project,
Triple T Parts and Equipment
(Project)
for Matt Holdings, LLC (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
SEAL
Signature %`�21 kc IA-I `` %%IIIIC1IpI��,'
Registration Number 1737
e�............
4 r
O jf SEAL _
Date ? (6 ' 09 t 17374 :i a
���p'�:y�l NEED••.`�\4�
°
'Uk b 9 2009
BY•--
State Stormwater Management Systems
Permit No. SW8 980701 Modification
I
Certification Requirements: Page 2 of 2
�1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built-upon area.
2)3. All the built-upon area associated with.the project is graded such that the
runoff drains to the system.
_6_4. The outlet/bypass Structure elevations are per the approved plan.
5. The outlet structure is located per the approved plans.
6. Trash rack is provided on the outlet/bypass structure.
7' 7. All slopes are grassed with permanent vegetation.
® 8. Vegetated slopes are no steeper than 3:1.
I. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
-0-110. The permitted amounts of surface area and/or volume have been
provided.
11. Required drawdown devices are correctly sized per the approved plans.
_P9L12. All required design depths are provided.
-0-13. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
14. The overall dimensions of the system, as shown on the approved plans,
are provided.