Loading...
HomeMy WebLinkAboutSW8150310_HISTORICAL FILE_20220921 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 � DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE A)O�A= YYYYMMDD „..STATro ROYCOOPER aovanor � - ELIZABETH S.BISER Secretary BRIAN WRENN- NORTH CAROLINA Director Environmental Quality August 10,2022 Via email only: bschulda)neifunds.com AEI Fund Management, Inc. (Developer) Attn: Rona Newtson 30 East 7th Street, Suite 1300 Saint Paul,MN 55101 And AEI Net Lease Portfolio IV, DST, a Delaware Statutory Trust(Property Owner) Attn: Rona Newtson 30 East 7” Street, Suite 1300 Saint Paul, MN 55101 Subject: Request for Additional Information Stormwater Project No. SW8 150310 Tractor Supply- Shallotte Brunswick County Dear Ms. Newtson: The Wilmington Regional Office received and accepted a State Stormwater Management Permit Renewal Application for the subject project on July 18, 2022 A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed. To continue the review, please provide the following additional information in a single, hard copy submittal package: 1. 15A NCAC 02H.1040(1)(a) and .1045(3)(b)(ii):: The application was signed by Rona Newtson; however the provided documentation from the NC Secretary of State does not identify Ms. Newtson as a vice president or president of these corporations. In the case of a corporation, the application must be signed by a principal executive officer of at least the level of vice-president Please either: a. Provide official documentation showing that Ms. Bullock is a vice-president or president and authorized to sign for both the corporation and the trust; b. Have one of the identified members of the corporation and the trust sign the application documents; or c. The signature by other agents shall be accepted on the application only if accompanied by a letter of authorization signed by the appropriate authority. Provide a letter of authorization from one of the identified members of this corporation and trust authorizing Ms. Newtson to sign on their behalf. Please remember to confirm that any revised information is presented consistently throughout the application documents. Please also remember to provide a hard copy of any updated documents per 15A NCAC 02H.1045(3). The requested information should be received in this Office by August 25, 2022, or the application will be returned as incomplete. If additional time is needed to submit the requested information,please email your extension request prior to this due date to the email address provided below with a justification and a date of when the requested information will be submitted, which shall be no later than 15 days past the original due date. Please note that onlv two letters requesting additional information is allowed in the State Stormwater Program for a total of 30 days to submit the requested additional information. If the information is not satisfactorily provided after either the second request or 30 days, the project will be returned. If the project is returned and you wish to re-submit later,you will need to resubmit all required items at that time, including the application fee. Please reference the State assigned application number on all correspondence. If you have any questions concerning thins matter,please feel free to call me at(910) 796-7215 or email me at ashleym.smith@ncdcnr.gov. �-. D North CaroWta Deparnnentof Environmental Qua8ty I Division of Enertly.Mineral and Land Resources Womb Eton Regional Office 1127 Cardinal Drive Extension I wilinington.North Ca Una 28405 910.7%.7215 State Stormwater Permit No. SW8 150310 Page 2 of 2 Sincerely, Ashley Smith Renewal Specialist DES/ams: A\\StormwaterAPermits& ProjectsV2015\150310 HD\2022 08 addinfo 150310 cc: Wilmington Regional Office Stormwater File ox QJ� D E North Carolina Department of Ehvbv mental Quality I DWislon of Energy;I.Rnernl and land Resources _ WJndngton Regional Office 1127 Cardhral Drhx Extension I wimington North Carolina ZB405 r� /'� 910.7%.7215 Smith, Ashley M From: Smith, Ashley M Sent: Wednesday, August 10, 2022 4:37 PM To: bschulz@aeifunds.com Subject: State Stormwater Permit#SW8 150310 Attachments: 2022 08 addinfo 150310.docx.pdf All, Attached is a pdf of the request for additional information for the subject project. There are just a few administrative items that need to be addressed. Please let me know if you have any questions or concerns. Thanks! Ashley Smith Renewal Specialist Division of Energy, Mineral and Land Resources, Wilmington Regional Office NC Department of Environmental Quality Phone 910 796 7215 Email ashleym.smith@ncdenr.eov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Burd, Tina J From: Burd, Tina J Sent: Tuesday, July 19, 2022 8.10 AM To: Brian Schulz Subject: SW8 150310 - Tractor Supply - Shallotte The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on July 18, 2022. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Late and may be disclosed to third patties. Website: http://deg.fic.gov/about/divisions/enerw-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-ig, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public:. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes,all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 1 Non-Transfer Application Completeness Review Checklist Project Name: T"C-raQ- SOPPLy - 5JA l-LbT7G Date Delivered to WIRO: 7 )g ZZ Project County/Location: ` Esazo Ss,JLLr_ RIMS Received/Accepted Date: 7 ,/Qj OZZ Date Given to Admin: Permit Action: New New Permit#': RIMS Acknowledged Date' Not located in the ETJ of the following delegated and functioninz programs: NHC:Carolina Beach/Kure Beach/Wilmington/Wrightsville Beach Bruns: Leland/Navassa(?)/Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod R nene ewal Existing Permit#: 5(.)5 ( rJ03 1 C� ❑Applicant&Permittee are the same?' Expiration Date°: ZOZ3 Permit Type: At]2�/LD/LD Overall/HD&LD Combo Genera rmit/Offsite/Exempt + Redevelopment ElOffsite to SW8: Development T e: Commem esidential/Other F1Is Offsite Lot p rp oved in Master Permit?s Subdivided?: Subdivision or mgle Lot Rule(s): �2017 Coastal 0008 Coastal F-11995 Coastal Phase II Universal .F]1988 Coastal Permittee Type&Documents Needed: Property Owner(s) Purchaser ElLessee =]HOA ODeveloper Viable? Viable? =Viable? =Viable? =Viable? Deed purchase ARmt =Lease OElection Minutes Paperwork .Application ' Fee: 505(within 6moJ Check#(sJ: J g 7 / FINo Fee ❑Supplement2(1 new form or for older forms:1 original per SCM) FIO&M' Soils Report(Infil or PP) Calculations(signed/sealed) Deed Restrictions,if subdivided Project Narrative FJUSGS Map(or on file?) Subject to SA?: Y / N Subject to ORW?: Y / N Plans(2 Sets) NOTES: 'Enter RIMS Acknowledged Date on this Sheet 2For New Projects-Enter New Permit#on Supplements&Deed Restriction Templates. 3If permittee is different,STOP.Needs to be transferred first. °If w/in 6 months and they are requesting a mod,STOP. Needs a renewal first. sIf Lot not approved in master permit,STOP. Master permit needs mod. ENTAILED ENGINEER DATE: Comments: REVIEWER NAME: �S Lr=- G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist 20210908 ROY COOPER - Governor ELIZABETH S.BISER Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality July 7, 2022 AEI Fund Management, Inc. (Developer) Attn: Marni Nygard, President 30 East 7' Street, Suite 1300 Saint Paul, MN 55101 And AEI Net Lease Portfolio IV, DST, a Delaware Statutory Trust(Property Owner) Attn: Marni Nygard, President 30 East 7' Street, Suite 1300 Saint Paul, MN 55101 Subject: Stormwater Permit Renewal Request Post-Construction Stormwater Management Permit No. SW 150310 Tractor Supply- Shallotte Brunswick County Dear Ms.Nygard: Post-Construction Stormwater Management Permit SW8150310 for the subject project expires on March 27, 2023. This is a reminder that permit renewal applications are due 180 days prior to their expiration per 15A NCAC 2H.1045(3).North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. More information about the Post-Construction State Stormwater Program can be found on the following website: deg.nc.>?ov/SW Please submit a complete permit renewal fort along with a $505.00 fee and other submittal requirements within 30 days. The permit renewal form can be found under the Post-Construction section of this website or at: littps://deq.nc.Qov/abou Ud iv i sions/energy-m ineral-and-land-resources/storm water/stonn water-program/post- construction-2. A review of the North Carolina Secretary of State corporation's database revealed that this corporation may have a new point of contact. Please submit a completed Permit Information Update Form to correct your contact information which is available on the website provided above under the "New Permits& Permit Modifications" section. If you have any questions regarding this matter, please contact Dylan McPeake(dvlan.mcpeake a,ncdenr.gov)or Ashley Smith(ashlewn.smith(rDncdenr.,,ov)either via email or phone at(910) 796-7215. Sincerely, {� Brian Wrenn, Director Division of Energy, Mineral and Land Resources DES/ams: \\\Stormwater\Permits&Projects\2015\150310 HD\2022 07 req_ren 150310 cc: CT Corporation System,Registered Agent;AEI Fund Management,Inc.; 160 Mine Lake Ct Suite 200;Raleigh,NC 27615 Wilmington Regional Office Stormwater File �omn ®MR O%M North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I wilmington,North Carolina 28405 ^�^d•u+^--^+�� / 910.796.7215 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print an Amended a Annual Report form Business Corporation Legal Name AEI Fund Management, Inc. Information Sosld: 1946394 Status: Current-Active O Date Formed: 2/5/2020 Citizenship: Foreign State of Incorporation: MN Fiscal Month: December Annual Report Due Date: April 15th Currentgnnual Report Status: Registered Agent: CT Corporation System Addresses Reg Office Reg Mailing Mailing 160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 30 East 7th Street, Suite 1300 Raleigh, NC 27615 Raleigh, NC 27615 Saint Paul, MN 55101 Principal Office 30 East 7th Street, Suite 1300 Saint Paul, MN 55101 Officers President Treasurer Chief Operating Officer Marni Nygard Keith Petersen Kevin Steele 30 E 7th Str #1300 30 E 7th Str#1300 30 E 7th Str #1300 St, Paul MN 55101 St Paul MN 55101 St. Paul MN 55101