Loading...
HomeMy WebLinkAboutSW8131213_COMPLIANCE_20150603 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 �31213 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE © COMPLIANCE EVALUATION INSPECTION DOC DATE 20 %rD b\�o 03 YYYYMMDD , ;� r NC®ENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Pat McCrory,Governor Donald R. van der Vaart Secretary June 3, 2015 Janet Rose Swart, Manager Rose Family Properties, LLC 203 Country Club Road Jacksonville, NC 28546 Subject: Notice of Inspection - Non Compliant Rose Commercial Center Permit No. SW8 131213 Onslow County Dear Ms. Swart: On May 29, 2015, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected Rose Commercial Center in Onslow County to determine the status of compliance with the State Stormwater Management Permit Number SW8 131213 issued on February 24, 2014. DEMLR file review and site inspection revealed that the site is not compliant with the terms and conditions of this permit. Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter, which summarizes the findings of the recent inspection. As indicated in the attached inspection report, the following deficiencies must be resolved: Submit a copy of the recorded deed restrictions. Please inform this Office in writing before July 1, 2015,.of the specific actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information, or to respond to this letter by the due date, may initiate enforcement action including the assessment of civil penalties of up to $25,000 per day. If a written plan of --action-is-not-submitted to this-office by July-1,-2015-then DEMLR staff will.re-inspect.the_site.. . . - .. . and issue a Notice of Violation if the listed deficiencies have not been addressed. If the project has changed its name, ownership, or mailing address, it is your responsibility to submit a completed and signed Name/Ownership Change form to DEMLR at least 30 calendar days prior to making the changes. Please include the name, mailing address and phone number of the person or entity that is now responsible for this permit on the Name/Ownership Change form. If you have any questions, please contact me at the Wilmington Regional Office, telephone number (910)-796-7372 or via email karl.hammers@ncdenr.gov. Sincerely, '. -1 Karl Hammers Environmental Specialist 127 Cardinal Dr. Ext.Wilmington, NC 28405•Telephone 910-796-7215/FAX: 910-350-2004 512 North Salisbury Street, Raleigh, North Carolina 27604•Internet: hfo://portal.ncdenr.org/web4r/land-quality An Equal Opportunity 1 Affirmative Action Employer-50%Recycled 110% Post Consumer Paper Enc: Compliance Inspection Report j GDS\initials: G:\WQ\Shared\Stormwater\Permits&Projects\2013\131213 HM2015 05 CEI_deficient 131213 cc: Georgette Scott, Wilmington Regional Office Stormwater Supervisor WiRO Stormwater File Compliance Inspection Report Permit: SW8131213 Effective: 02/24/14 Expiration: 02/24/22 Project: Rose Commercial Center Owner: Rose Family Properties LLC County: Onslow Adress: NC Hwy 24 Region: Wilmington City/State/Zip: Swansboro NC 28584 Contact Person: Janet Rose Swart Title: Manager Phone: 910-455-4424 Directions to Project: Intersection of Hwy 24 and Seth Thomas Road Type of Project: State Stormwater-HD-Detention Pond Drain Areas: 1 -(Cartwheel Branch) (03-05-01 )(SA;HQW) On-Site Representative(s): Related Permits: Inspection Date: 05/29/2015 Entry Time: 10:53AM Exit Time: 11:12AM Primary Inspector: Karl J Hammers Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ® Not Compliant Question Areas: ® State Stormwater (See attachment summary) page: 1 Permit: SW8131213 Owner-Project: Rose Family Properties LLC Inspection Date: 0 5/2 912 01 5 Inspection Type Compliance Evaluation Reason for visit: Routine Inspection Summary: A copy of the Recorded Deed Restrictions was not observed in the file as is required by Section II 9 of the permit. To bring the site into compliance please submit a copy of the recorded deed restrictions. File Review - Yes No NA NE Is the permit active? 9 ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation S Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ® El ❑ Comment: A copy of the recorded deed restrictions was not seen in the file SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ El ❑ Are the inlets located per the approved plans? ® ❑ ❑ Are the outlet structures located per the approved plans? ® El ❑ ❑ Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ® 0 ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ® ❑ ❑ ❑ Comment: page: 2 205 Ward Rd. #3 Swansboro, N.C. 28584 Tel (910) 325-0006 Fax: (910) 325-0060 ICrystal Coast Trammrid A I To: Linda Lewis From: Jeanie for David Newsom NCDENR—Stormwater Section 127 Cardinal Drive Ext. Wilmington, NC 28405 Re: Rose Commercial Center Date: July 15, 2014 SW8 131213 Attached: One (1) original Designer's Certification for Stormwater System One (1) copy Inspection Report One(1) plan view(8 '/z x 11) of designed pond overlaid with asbuilt point locations Comments: ECEIVE JUL 2 1 20% BY:� Crystal Coast Engineeriling, PA' Inspection Report To: File From: David K Newsom, PE CC: Date: July 14,2014 Re: Rose Commercial Pond Inspection—FINAL Weather: Partly Cloudly, Hot Present: David K. Newsom Excavation work previously confirmed by field as-built survey by John L. Pierce of 6/10114. Slopes adequately stabilized with Sod. Vegetated shelf plantings completed this date and appear adequate. Outlet structure complete and appears satisfactory. Site work still progressing (only rough base course installed as of this date).....No additional BLIA. Recommend another post construction inspection to assure no sediment has entered the forebay area from the ongoing building construction activities. ECEOVER JUL 2 1 20% 1 IONE-STORY METALBLDC F.F.ELEV=3L85 i 8' DRAINAGE EASEMENT / 1 75 --- i 6• CHAINLINK / FENCE ____ __________ S 82'21'10' E 342.89' v 'r 31� •r •r o5 -210________ r f/28.5 - 'r •-� I . r 28.0 1 rn i 22.0 7 r Proposed Pond I I •r .r �tti •r �•.. / �., y IAN Inv.: 27.00 •r r r _ 7% a -p _ 4 7 G nv.: 28.50 v r • � r '�" u. TC-31.27 �o •r 7 t =1,�. q ,• •r 'r m Inv.: 28:Ju =31.42 TC=31.76 TC=3100 �U ..I 0 0 € OOMPgrep TC=31.94 " n.78 TC=31.43 pa P a 4