Loading...
HomeMy WebLinkAboutSW8110702_HISTORICAL FILE_20110802 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 00-1 02 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 011 D S 0 2 YYYYM M DD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary August 2, 2011 Carl Baker, Deputy Public Works Officer USMCB Camp Lejeune Building 1005 Michael Road MCB Camp Lejeune, NC 28547 Subject: State Stormwater Management Permit No. SW8110702 Gonzalez Boulevard Extension High Density Commercial infiltration Basin Project Onslow County Dear Mr. Baker: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for Gonzalez Boulevard Extension on July 28, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 110702 dated August 2, 2011, for the construction, operation and maintenance of the BMP's and built-upon area associated with the subject project. This permit shall be effective from the date of issuance until August 2,2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements,or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by fling a petition with the Office of Administrative Hearings(OAH). The petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty(30)days of receipt of this permit. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m.,except for official state holidays. The petition may be filed by facsimile(fax)or electronic mail by an attached file(with restrictions)-provided the signed original,one(1)copy and a filing fee(if a filing fee is required by NCGS§150B-23.2)is received in the OAH within seven (7) business days following the faxed or electronic transmission. Unless such demands are made this permit shall be final and binding.You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714, Telephone 919-733-2698. FAX 919-733-3378. If you have any questions,or need additional information concerning this matter, please contact Chris Baker, at(910) 796-7215. Sincerely, YID For Colleen Sullins, Director Division of Water Quality GDS/csb: S:1WQS1Stormwater\Permits& ProjectsQ01 1\1 10702 HD Q011 08 permit 110702 cc: Bryan Dick, P. E.,AECOM Wilmington Regional Office Stormwater File Wilmington Regional Office One 127 Cardinal Drive Extension,Wilmington,North Carolina 28405 NorthCarolina Phone:910-796-72151 FAX:910-350-20041 Customer service:1-877-623-6748 �ry •' arol in Internet:w .ncwaterquality.org KFti[[IL State Stormwater Management Systems Permit No. SW8 110702 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Gonzalez Boulevard Extension Gonzalez Boulevard, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 2 infiltration basins in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 2, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 48,861 square feet of impervious area. 3. The tract will be limited to the amount of built-upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built-upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 110702 6. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 7. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: Infiltration Basin #1 Infiltration Basin #2 a. Drainage Area, acres: 1.0 0.83 Onsite, ftZ: 43,639 35,948 Offsite ftZ N/A None b. Total Impervious Surfaces, ft : 12,913 35,948 Onsite, ftZ: 12,913 35,948 Offsite, ftZ N/A N/A C. Design Storm, inches: 1.5 1.5 d. Basin Depth, feet: 3 2 e. Bottom Elevation, FMSL: 7 11 f. Bottom Surface Area, ft : 900 4,550 9. Bypass Weir Elevation, FMLS: 10 13 h. Permitted Storage Volume, ft : 4,806 10,864 i. Type of Soil: Ba meade Mary n j. Expected Infiltration rate: 2.06 5.37 k. Seasonal High Water Table, FMSL: 5 8.5 I. Time to Draw Down, hours 31 5.3 m. Receiving Stream/River Basin: Co dels Creek/White Oak n. Stream Index Number: 19-23 o. Classification of Water Body: SQNSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 110702 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built-upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 111. GENERAL CONDITIONS 1. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 110702 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the project or of the permittee or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall constitute an approved transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 2nd day of August, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -Kfor Goleea7H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 110702 Gonzalez Boulevard Extension Stormwater Permit No. SW8 110702 Onslow County Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date Page 6 of 7 State Stormwater Management Systems Permit No. SW8 110702 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 7 of 7 [Applicable t - DWQ:USEiONLy Dat Receiv d Fee Paid Permit Number Rules: ❑Coastal SW-79 5 ElCoastal SW-2008 ❑ Ph II-Post Construction elect all that apply) ❑ Non-Coastal SW-HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality 171UI STORMWATER MANAGEMENT PERMIT APPLICATION FORM 2 S 2011 This form may be photocopied for use as an original EY:____ -I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): USMCB Camp Lejeune,Gonzalez Boulevard Extensions 2. Location of Project(street address): Gonzalez Blvd City:USMCB Camp Lejeune County:Onslow Zip:28547 3. Directions to project(from nearest major intersection): In Jacksonville go east on NC24(Leieune Blvd) to Camp Leieune main gate.Turn Left onto Sneads Ferry Rd Approximately 1.4 miles on Right. 4. Latitude:34°39'40.42" N Longitude:77°19'37.45" W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ❑Not Started []Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application,list the stormwater project number,if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control:32.16 ac of Disturbed Area ❑NPDES Industrial Stormwater E404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: FonnSWU-I01 Version07Jun2010 Page I of III. . CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title (specifically the developer,property owner, lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Commanding Officer,Marine Corps Base Camp Leieune Signing Official &Title:Carl Baker, Deputy Public Works Officer b.Contact information for person listed in item la above: Street Address:Bldg 1005 Michael Rd. City:MCB Camp Lejeune State:NC Zip28547 Mailing Address(if applicable): City: State: Zip: Phone (910 ) 451-2213 Fax: (910 ) 451-2927 Email:cart.h.baker@usmc.mil c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information, item 3a) ❑ Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑ Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑ Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official &Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Andrew B.Wilson,EIT,AECOM Signing Official &Title: b.Contact information for person listed in item 3a above: Mailing Address:701 Corporate Center Drive City:Raleigh State:NC Zip:27607 Phone: (919 ) 854-6225 Fax: (919 ) 854-6259 Email:andrewb.wilson@aecom.com 4. Local jurisdiction for building permits: Point of Contact: Phone#: ( ) FonnSWU-101 Version 07Jun2010 Page 2of7 JUL 2 8 2011 3`', IV., PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. The low density areas will utilize grassed swales.Additional Stormwater from construction of the Codgels Creek Pump Station and the Gonzalez Road Bridge will be routed via a combination of grassed swales and pipe from impervious areas to two infiltration basins.The infiltration basins meet DWO requirements for drawdown time and is sized for 2.5 times the required treatment volume.This project is not within 1/2 mile of SA waters or within 575 It of ORW waters. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW-1995 ❑Ph❑ -Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area:149.9 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5)-Total Surface Water Area (6) =Total Project Area+:149.9 acres Total project area shall be calculated to exclude the followin the normal yool of irnpounded structures, the area between the banks of streams and rivers, the area below theormal High Water(N line or Mean High Water (MHW)line, and coastal wetlands landward from the NHW(or MHW)line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area) X 100 =9.67 9. How many drainage areas does the project have?3(For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. - 1. .�I_D JUL 2 8 2011 Form SWU-101 Version 07Jun2010 Page 3 of 7 Basin Information Draina a Area 1 Draina e Area 2 DrainaizeArea3 Draina e Area_ Receiving Stream Name Cogdels Creek Cogdels Creek Cogdels Creek Stream Class * SC; NSW SC; NSW SC; NSW Stream Index Number* 19-23 19-23 19-23 Total Drainage Area (so 6529644 43639 35948 On-site Drainage Area (so 0 43639 35948 Off-site Drainage Area (so 0 0 0 Proposed Impervious Area (so 631701 12913 35948 % Impervious Area** total 9.67 30 100 Impervious'Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area_ On-site Buildings/Lots (so 0 9000 0 On-site Streets (so 462670 3913 35948 On-site Parking (so 0 0 0 p — On-site Sidewalks (so 20596 0 0 j;� Other on-site (so 0 0 0 �i ) Future(so 0 0 0 Off-site (sf) 0 0 0 �� Existing BUA***(so 148435 0 0 Total (sf): 631707 12913 35948 11 CE Stream Class and Index Number can be determined at: http.Vlportal.ncdenr.or web/wq[ps/csu/classiflcations j Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas, sidewalks,gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined?Provide documentation. NA Proieets in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initia 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions& Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M agreement(s)for each BMP. �� 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to http://wv,,w.envhclp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Fonn SWU-101 Version 07Jun2010 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. �� 7. Sealed,signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed,signed, &dated),including: AW a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of 1� impounded structures,the banks of streams and rivers, the MHW or NHW line of tidal v waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers,and the MHW(or NHW) of tidal waters. p i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. W S k. Existing contours,proposed contours,spot elevations,finished floor elevations. rN ` I. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated (included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) N� 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC IVA —AX Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per NCAC 2H.1003(e).The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.US/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Form SWU-101 Version 07Jun2010 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer.Andrew Wilson,FIT Consulting Firm:AECOM Technical Services Inc. Mailing Address:701 Corporate Center Drive-Suite 475 City:Raleigh State:NC Zip:27513 Phone: (919 ) 854-6200 Fax: (919 ) 854-6259 Email:Andrewb.Wilson@AECOM.com IX. PROPERTY OWNER AUTHORIZATION(if Contact Information, item 2 has been filled out,complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to(print or type name of person listed in Contact Information, item la) with(print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent(entity listed in Contact Information, item 1)dissolves their company and/or cancels or defaults on their lease agreement, or pending sale,responsibility for compliance with the DWQ Stormwater permit reverts back to me,the property owner.As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of County of do hereby certify that personally appeared before me this_day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires JUL 2 8 2011 3y: Form SWU-101 Version 07Jun2010 Page 6 of 7 X. , APPLICANT'S CERTIFICATION ], (print or type name of person listed in Contact Information, item la) C4Y KZ'r certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable stor/m/yy�ater rules un *r 15A NCAC 2H .1000,SL 2006-246 (Ph. II -Post Construction)or SL 2008-211. Signature: \ il.� S=�r2�t/K-�-� Date:�"'�(i a Notary Public for the State ofN�1 '1.(ICCA iH County of nS�(oly do hereby certify that�Lf l f�k uP personally appeared i �p before me this�O'�day of olbl( ,and ackn wledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, (n MY COMMISSION EXPIRES My commission expires 3 qa' ' 5 A 2 g 2011 Form SWU-101 Version 07Jun2010 Page 7 of 7 MEMORY TRANSMISSION REPORT TIME :08-02-'ll 15:06 -FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 789 DATE 08.02 15:04 TO : R 919198546259 DOCUMENT PAGES 8 START TIME 08.02 15:04 END TIME 08.02 15:06 PAGES SENT 8 STATUS OR SUCCESSFUL TX NOTICE Ststy of Nortb Cmrolivm flspv etmenr of Envlronmmvt mna Nuturml Resvureee WIImIV Qren RnQlvvrl!}Tar aena.{y Evvas Po�ro us�Govervor FAX COVRR SE'IL•]ET Dre Frcrwtvrt� Gacrvrvry Dare: �/�J'/� No.Pages(axcl. cover): / (9101796-7336 f9101350-2004 Ra: �0.✓_3-/�G_ � a �G (/� Ex BEN s �r. .-•_l —_—.. -�✓-dam //O 70 Z� --- i 2'1 Cur[nnnl��i+a Fx[anpinn, Wiimi�Q[nn,NC 2P9(1.5 a(9111)'r95-'1215 a An Equnl♦JPP^rtnniN A�ttnetiva Action EmPloYat ' i State of North Carof = Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Pep-due, Governor FAX COVER SHEET Dee Freeman, Secretary Date: No. Pages (excl. cover): To: L S o From: Jo Calmer Cc: /7 ��'�, ` Phone: (910) 796-7336 Fax: �Zp�9 / /Fax: (910)350)-2004 . Re: C9OaZA � �Z 7� Gf/l/. �X7EJ5 :D �/ ��� .- � �_ ss �� � _ `jam ��✓ ��y �'� 127 Cardinal Drive Extension, Wilmington,NC 28405 e(910)796-7215 o An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :08-02-'11 15:08 - FAX NO.1 : 910-350-2018 NAME :DENR Wilmington FILE NO. 790 DATE 08.02 15:04 TO : 8 919104512927 DOCUMENT PAGES 8 START TIME 08.02 15:06 END TIME 08.02 15:08 PAGES SENT 8 STATUS ON * SUCCESSFUL TX NOTICE Smta of lVortb Cu rolonn OrP�rtmant o!Envlronmant and Nvtur�l Rmourcra W\Im*oytnn Rryloonl Q(T4fa B�.Kr/y Euws Ps//rd e.��Covoreor FAX COVEA SFiE6T Daa F.�ea�nna� .rperetrry Dntr SL�,/�� No.Pages(exo\. covcr): _L,__Co: /J IP/i'ia G_ Co Yo-.i '�9S L_ Pltonr. (9101 796-0336 Y�C/m � "f i�.�S as c/ — //� i ✓ ��1/ i '.✓ ice- -A� -�_ \27 Cartl\na\Llrlvn F:xfanxlnn. W�IminII<on.N!:'2A9n5 m(91(1)7glr'l7\G a An Egvsl JPP^rtuniry phirme[ivo Amnion L1npinye. State of North Care9ina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: S/ No. Pages(excl. cover): To: ���G �A�P From: Jo Casmer Co: �'lai CoYps AS Phone: (910) 796-7336 Fax: Fax: (910)350-2004 Re: 127 Cardinal Drive Extension, Wilmington,NC 28405 0(910)796-7215 o An Equal Opportunity Affirmative Action Employer ' Stormwater Management Plan Prepared For: MCB Camp Lejeune USMCB Camp Lejeune, Gonzalez Boulevard Extensions Date: 07-22-11 CARO, 20 .oFESSipy;fy a SEAL 9� 035724 /�•"i B/V r'N C aya� R RANI IM; 7/��zoll AECOM JUL 2 g 2011 701 Corporate Center Dr., Suite 475 gy_ Raleigh, NC 27607 �- 919-854-6200 Prepared By: Andrew Wilson, EIT Checked By: Bryan M. Dick, PE, PH Project Description This document is to serve as a stormwater management plan for the MCB Camp Lejeune — Gonzalez Blvd Extensions Project. The proposed Gonzalez Blvd. Extension project (hereinafter "Gonzalez Blvd.") is located near the Hadnot Point Cantonment Area of Marine Corps Base Camp Lejeune in Onslow County, North Carolina. The proposed project involves new road construction, including a proposed bridge over Cogdels Creek, and construction of new sections of tank trail. The project limits are currently comprised of wooded areas and a wetland adjacent to Cogdel's Creek. The Gonzalez Blvd. site is not located within one half mile of SA waters. Contact Information AECOM Technical Services Inc. Attn: Bryan M. Dick, PE, PH 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 JUL 2 8 2011 Telephone: 919-854-62 52 Fax: 919-854-6259 Identify Proiect Involvement The proposed project is located in the White Oak River Basin. The project drains to Cogdels Creek (NCDWQ Index Number 19-23), which has an NCDWQ Stream Classification of SC, NSW. The Gonzalez Blvd. project will result in an increase in BUA of approximately 497,293.2 sf, which comprises less than 24% of the total project area, and thus qualifies as Low-Density per the Coastal Rules. According to the Coastal Rules, sites that qualify as low-density must treat stormwater primarily through the use of grassed swales and maintain a 50' vegetated buffer from surface waters. To meet this requirement, the stormwater runoff from the proposed roadway will be collected in vegetated swales along the proposed roadway or allowed to flow diffusely off the road surface. As required by the stormwater regulations, these swales are designed to meet the following criteria: • Side slopes of 3:1 or less • Slope no greater than 5% • Designed to carry the 10-year storm at a non-erosive velocity. For the proposed bridge, a scoping meeting was held with DWQ and attended by both AECOM and MCBCL personnel, at which DWQ asked that the bridge be treated as a "pocket" of high density within the otherwise low-density permit, and that the stormwater runoff from the bridge be controlled prior to being discharged into the wetlands. Based on this requirement, the drainage system of the bridge has been designed such that stormwater will be conveyed into two proposed infiltration basins, one on the northeastern end of the bridge and one on the southeastern end. Stormwater Design Parameters The infiltration basins are based on the following parameters or objectives: • Provide 85% TSS removal • Protect the value of the receiving water resource • Bottom of basin is a minimum of 2' above elevation of the Seasonal High Water Table (SHWT) • Soil must have a minimum infiltration rate of 0.52 in/hr. • Basins were sized to store 2.5 times the required treatment volume and infiltrate that volume within 5 days using an infiltration rate of one-half the infiltration rate in the soils report, in order to waive both the offline bypass and vegetated filter strip requirements. Discussion of Treatment Measures The proposed treatment is to utilize 2 separate infiltration basins to meet the TSS and Peak Flow requirements set forth by DWQ. The soils of the project site are appropriate soils for infiltration and the season high water table at each basin will allow construction of these basins, with at least a 2' clearance for each basin. Each basin is designed to store 2.5 times the required treatment volume and infiltrate within 5 days using one-half the infiltration rate found from the LSS, so neither offline bypass' nor vegetated filter strips are required. Phase II requirements are met by using a grassed swale to collect sheet flow from the impervious areas and by the infiltration and storage volume provided in each basin. Conclusion This Stormwater Management Plan represents an environmentally sensitive and effective plan for utilizing the proposed stormwater treatments to accommodate the increased runoff of the proposed site development. 1� C �VIH:D JUL 2 S 2011 BY: MCH1000R.L5T ****** HYCHL ****** (Version 6.1) ****** Date 03-14-2011 Commands Read From File: C:\HYCHL\MCH1000R.CHL JOB MCHUGH BLVD. DITCH STA. 10+00 TO STA. 14+00 RT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) j CHL 0.0122 4.91 VSH 3 4 ** V-SHAPE RIGHT Z1 = 3.0 AND LEFT Z2 = 4.0 i END �...... ***************END OF COMMAND FILE************ --`"" MCHUGH BLVD. DITCH STA. 10+00 TO STA. 14+00 RT. JUL 2 8 2p11 INPUT REVIEW �''---�� ------------ DESIGN PARAMETERS: DESIGN DISCHARGE (ftA3/s): 4.91 CHANNEL SHAPE: VSHAPED CHANNEL SLOPE (ft/ft): .012 RESULTS SHEAR STRESS(psf) Len of Super ---DESIGN-- --------------- Protect Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .41 .00 0. UNSTAB .37 .3 .54 .014 JUTE NET .45 .52 .00 0. UNSTAB .86 3.2 .69 .026 FIBERGLASS SINGLE .60 .52 .00 0. STABLE 1.16 7.6 .68 .026 FIBERGLASS DOUBLE .85 .53 .00 0. STABLE 1.60 19.1 .70 .028 STRAW WITH NET 1.45 .65 .00 0. STABLE 2.25 58.1 .85 .046 CURLED WOOD MAT 1.55 .65 .00 0. STABLE 2.37 66.5 .86 .048 SYNTHETIC MAT 2.00 .56 .00 0. STABLE 3.57 194.5 .74 .032 P6Rt4.N6N'' i *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE A 3.70 1.77 .00 0. STABLE 2.09 225.1 2.33 .568 VEGETATIVE B 2.10 1.18 .00 0. STABLE 1.78 56.1 1.55 .230 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE C 1.00 .90 .00 0. STABLE 1.11 7.3 1.-19_.113J *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE D .60 .80 .00 0. UNSTAB .75 1.6 1.05 .082 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 .74 .00 0. UNSTAB .47 .2 .97 .067 RIGID CONCRETE ******* .42 .00 0. STABLE ****** .0 . 55 .014 GROUTED RIPRAP ******* .55 .00 0. STABLE ****** .0 .72 .030 Page 1 MCH1600L.L5T ****** HYCHL ****** (Version 6.1) ****** Date 03-14-2011 I Commands Read From File: C:\HYCHL\MCH1600L.CHL JOB MCHUGH BLVD. DITCH STA. 16+00 TO STA. 19+50 LT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0262 1.95 VSH 2 6 ** V-SHAPE RIGHT Z1 = 2.0 AND LEFT Z2 = 6.0 END EJJ _ _ "***************END OF COMMAND FILE************ "-`"-"MCHUGH BLVD. DITCH STA. 16+00 TO STA. 19+50 LT. 2 g Zp�� 1 ------------ INPUT-REVIEW I �� DESIGN PARAMETERS: DESIGN DISCHARGE (ftA3/s): 1.95 CHANNEL SHAPE: VSHAPED CHANNEL SLOPE (ft/ft): .026 RESULTS SHEAR STRESS(psf) Len of Super ---DESIGN-- ------------- -- Protect Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (CfS) (ft) n ---- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .52 .00 0. UNSTAB .29 .1 .32 .014 JUTE NET .45 .69 .00 0. UNSTAB .65 .5 .42 .030 FIBERGLASS SINGLE .60 .68 .00 0. UNSTAB .88 1.3 .42 .029 FIBERGLASS DOUBLE .85 .71 .00 0. STABLE 1.21 3.4 .43 .032 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE STRAW WITH NET 1.45 90 .00 0. STABLE 1.61 9.5 .55 .062 EtlRtrEo-iie^eB MUkT 2.00 .75 00 cre Rl F 1_7Z.__11.2. .55 .062 SYNTHETIC MAT 2.00 .75 .00 0. STABLE 2.65 36.9 .4 I PERMANENT (FLEXIBLE) t VEGETATIVE A 3.70 2.40 .00 0. STABLE 1.54 21.8 1.47 .840 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE B 2.10 1.88 .00 0. STABLE 1.12 5.6 1.15_416 VEGETATIVE C 1.00 1.27 .00 0. UNSTAB .79 .5 .77 153 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE D .60 1.07 .00 0. UNSTAB .56 .1 .66 .101 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 1.00 .00 0. UNSTAB .35 .0 .61 .081 RIGID CONCRETE ******* .53 .00 0. STABLE ****** .0 .32 .015 GROUTED RIPRAP ******* .77 .00 0. STABLE ****** .0 .47 .040 Page 1 MCH1600R.L5T ****** HYCHL **z*** (Version 6.1) ****** Date 03-14-2011 Commands Read From File: C:\HYCHL\mcHl600R.CHL I JOB MCHUGH BLVD. DITCH STA. 16+00 TO STA. 19+50 RT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0104 3.40 VSH 4 3 ** V-SHAPE RIGHT Z1 = 4.0 AND LEFT Z2 = 3.0 END ***************END OF COMMAND FILE************ I MCHUGH BLVD. DITCH STA. 16+00 TO STA. 19+50 RT. ------------ INPUT REVIEW FL �-- ----- i.dDESIGN PARAMETERS:DESIGN DISCHARGE (ftA3/s): 3.408 2011 CHANNEL SHAPE: VSHAPEDCHANNEL SLOPE (ft/ft): .010 RESULTS SHEAR STRESS(psf) Len of Super ---DESIGN-- � ------------ -- ProteCt Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---------------- ------- ------- ------ ----- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .31 .00 0. UNSTAB .48 .4 .48 .014 JUTE NET .45 .40 .00 0. STABLE 1.11 4.7 .62 .027 FIBERGLASS SINGLE .60 .40 .00 0. STABLE 1.50 11.0 .62 .026 FIBERGLASS DOUBLE .85 .41 .00 0. STABLE 2.07 27.9 .63 .028 STRAW WITH NET 1.45 .50 .00 0. STABLE 2.88 85.6 .78 .049 CURLED WOOD MAT 1.55 .51 .00 0. STABLE 3.05 97.6 .78 .050 SYNTHETIC MAT 2.00 .43 .00 0. STABLE 4.60 280.9 .67 .033 PEWWiEHT EFEEx;66r5) *trz WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE i WITH MOST RECENT VALUE VEGETATIVE A 3.70 1.49 .00 0. STABLE 2.48 349.2 2.30 .878 VEGETATIVE B 2.10 .98 .00 0. STABLE 2.14 86.8 1.51 .288 VEGETATIVE C 1.00 .73 .00 0. STABLE 1.37 11.6 41:.13 131' *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE D .60 .64 .00 0. UNSTAB .93 2.7 .99 .092 VEGETATIVE E .35 .59 .00 0. UNSTAB .59 .4 .91 .074 RIGID CONCRETE ******* .32 .00 0. STABLE *****z .0 .50 .015 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE GROUTED RIPRAP ******* .42 .00 0. STABLE ****** .0 .65 .031 ztr* WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE Page 1 GON1600L.L5T ****** HYCHL ****** (Version 6.1) ****** Date 03-14-2011 Commands Read From File: C:\HYCHL\GON1600L.CHL JOB GONZALEZ BLVD. DITCH STA. 16+00 TO STA. 20+00 LT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0202 1.23 VSH 3 4 ** V-SHAPE RIGHT Z1 = 3.0 AND LEFT Z2 = 4.0 END ***************END OF COMMAND FILE************ GONZALEZ BLVD. DITCH STA. 16+00 TO STA. 20+00 LT. INPUT REVIEWJUL 2 8 2011 DESIGN PARAMETERS: '� I DESIGN DISCHARGE (ftA3/s) : 1.23 CHANNEL SHAPE: VSHAPED CHANNEL SLOPE (ft/ft): .020 RESULTS SHEAR STRESS(psf) Len of Super ---DESIGN-- --------------- Protect Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---------------- ------- ------- ------ ----- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .37 .00 0. UNSTAB .40 .1 .30 .014 JUTE NET .45 .50 .00 0. UNSTAB .90 .9 .40 .031 FIBERGLASS SINGLE .60 .49 .00 0. STABLE 1.22 2.2 .39 .030 FIBERGLASS DOUBLE .85 .51 .00 0. STABLE 1.67 5.7 .40 .033 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE STRAW WITH NET 1.45 .66 .00 0. STABLE 2.21 16.4 .52 .065 i *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE i WITH MOST RECENT VALUE CURLED WOOD MAT 1.55 .66 .00 0. STABLE 2.36 19.1 .52 .065 SYNTHETIC MAT 2.00 .55 .00 0. STABLE 3.66 59.9 .43 .040 PERMANENT (FLEXIBLE) j VEGETATIVE A 3.70 1.72 .00 0. STABLE 2.15 49.0 1.37 .851 i *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE B 2.10 1.25 .00 0. STABLE 1.69 12.4 .99_.387 VEGETATIVE C 1.00 .97 .00 0. STABLE 1.03 1.4 .77 .185 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE D .60 .83 .00 0. UNSTAB .72 .2 .66 . 120 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 .74 .00 0. UNSTAB .47 .0 .59 . 090 RIGID Page 1 GON1800A.L5T ****** HYCHL ****** (Version 6.1) ****** Date 02-21-2011 Commands Read From File: C:\HYCHL\GON1800A.CHL JOB GONZALEZ BLVD. DITCH STA, 18+00 TO STA. 26+00 RT. BETW. RD. & PATH UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0157 4.28 VSH 4 4 ** V-SHAPE RIGHT Z1 = 4.0 AND LEFT Z2 = 4.0 END ***************END OF COMMAND FILE************ GONZALEZ BLVD. DITCH STA. 18+00 TO STA. 26+00 RT. BETW. RD. & PATH 1'�' ------ ------------ INPUT REVIEW JUL 2 8 2011 ------------ DESIGN PARAMETERS: DESIGN DISCHARGE (ftA3/s): 4.28 ------_ CHANNEL SHAPE: VSHAPED CHANNEL SLOPE (ft/ft): .016 RESULTS SHEAR STRESS(psf) Len of Super ---DESIGN-- ------------- -- Protect Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---------------- ------- ------- ------ ----- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .45 .00 0. UNSTAB .33 .2 .46 .014 1 JUTE NET .45 .59 .00 0. UNSTAB .77 2.0 .60 .027 FIBERGLASS SINGLE .60 .58 .00 0. STABLE 1.04 4.7 .59 .026 FIBERGLASS DOUBLE .85 .60 .00 0. STABLE 1.43 12.1 .61 .029 STRAW WITH NET 1.45 .73 .00 0. STABLE 1.98 35.9 .75 .049 j CURLED WOOD MAT 1.55 .74 .00 0. STABLE 2.10 41.4 .75 .051 SYNTHETIC MAT 2.00 .63 .00 0. STABLE 3.17 124.8 .64 .033 RSR�N1hISIJT CFO gXTQ1 r I *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE I VEGETATIVE A 3.70 1.97 .00 0. STABLE 1.88 126.3 2.01 .761 VEGETATIVE B 2.10 1.35 .00 0. STABLE 1.56 31.7 1.38 .252 VEGETATIVE C 1.00 1.02 .00 0. UNSTAB .98 4.0 C1:.04=119) *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE ' WITH MOST RECENT VALUE VEGETATIVE D .60 .90 .00 0. UNSTAB .67 .8 .92 .085 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 .83 .00 0. UNSTAB .42 .1 .85 .069 RIGID CONCRETE ******* .47 .00 0. STABLE ****** .0 .48 .015 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE GROUTED RIPRAP ******* .62 .00 0. STABLE ****** .0 .63 .032 Page 1 GON4450B.L5T ****** HYCHL ****** (version 6.1) ****** Date 02-21-2011 Commands Read From File: C:\HYCHL\GON44506.CHL JOB GONZALEZ BLVD. DITCH STA. 37+00 TO STA. 44+50 RT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0030 2.74 VSH 4 4 ** V-SHAPE RIGHT Z1 = 4.0 AND LEFT Z2 = 4.0 END ***************END OF COMMAND FILE************ GONZALEZ BLVD. DITCH STA. 37+00 TO STA. 44+50 RT. ''�= INPUT REVIEWJUL 2 8 2011 DESIGN PARAMETERS: DESIGN DISCHARGE (ftA3/s): 2.74 CHANNEL SHAPE: VSHAPED I CHANNEL SLOPE (ft/ft): .003 RESULTS SHEAR STRESS(p5f) Len of Super ---DESIGN-- ------------- -- Protect Elev Stab. Max Q Depth Mann Lining Type Permiss Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---------------- ------- ------- ------ ----- ------ ------ ------- ------ TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .10 .00 0. STABLE 1.50 8.3 .53 .014 JUTE NET .45 .13 .00 0. STABLE 3.53 98.5 .68 .026 FIBERGLASS SINGLE .60 .13 .00 0. STABLE 4.76 221.6 .67 .026 FIBERGLASS DOUBLE .85 .13 .00 0. STABLE 6.56 550.4 .69 .028 I STRAW WITH NET 1.45 .16 .00 0. STABLE 9.21 1797.9 .84 .046 CURLED WOOD MAT 1.55 .16 .00 0. STABLE 9.73 2006.6 .85 .048 SYNTHETIC MAT 2.00 .14 .00 0. STABLE 14.63 5306.3 .73 .032 I -PERM06r*-'rr66e186Q -- VEGETATIVE A 3.70 .49 .00 0. STABLE 7.62 9112.0 2.59 .931 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE ' VEGETATIVE B 2.10 .41 .00 0. STABLE 5.17 2239.1 2.17 .5,32 VEGETATIVE C 1.00 .26 .00 0. STABLE 3.83 322.9139 178� *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE D .60 .22 .00 0. STABLE 2.69 82.4 1.19 .119 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 .20 .00 0. STABLE 1.73 17.7 1.08 .091 RIGID CONCRETE ******* .10 .00 0. STABLE ****** .0 .54 .014 GROUTED RIPRAP ******* .13 .00 0. STABLE ****** .0 .71 .030 STONE MASONRY ******* .14 .00 0. STABLE ****** .0 .73 .032 SOIL CEMENT ******* .12 .00 0. STABLE ****** .0 .64 .022 ASPHALT ******* .11 .00 0. STABLE ****** .0 .58 .017 Page 1 GON4450A.L5T k kRRRR HYCHL ****** (Version 6.1) ****** Date 02-21-2011 Commands Read From File: C:\HYCHL\GON4450A.CHL JOB GONZALEZ BLVD. DITCH STA. 44+50 TO STA. 48+00 RT. UNI 0 ** UNITS PARAMETER = 0 (ENGLISH) CHL 0.0058 0.85 VSH 4 4 ** V-SHAPE RIGHT Z1 = 4.0 AND LEFT Z2 = 4.0 END ***************END.OF COMMAND FILE************ j GONZALEZ BLVD. DITCH STA. 44+50 TO STA. 48+00 RT. ------------ INPUT REVIEW FJU ------------ DESIGN PARAMETERS: 8 2011 IDESIGN DISCHARGE (ftA3/s): .85 CHANNEL SHAPE: VSHAPED JCHANNEL SLOPE (ft/ft) : .006 _��_ i RESULTS SHEAR STRESS(pSf) Len of Super ---DESIGN-- ! --------------- Protect Elev Stab. Max Q Depth Mann Lining Type PermisS Bottom (ft) (ft) Remark Factor (cfs) (ft) n ---------------- ------- ------- ------ ----- ------ ------ ------- ------ ---- TEMPORARY (FLEXIBLE) WOVEN PAPER NET .15 .11 .00 0. STABLE 1.34 1.9 .31 .014 JUTE NET .45 .15 .00 0. STABLE 3.03 21.6 .41 .031 FIBERGLASS SINGLE .60 .15 .00 0. STABLE 4.09 49.5 .41 .030 FIBERGLASS DOUBLE .85 .15 .00 0. STABLE 5.60 123.9 .42 .032 I *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE STRAW WITH NET 1.45 .19 .00 0. STABLE 7.47 394.3 .54 .062 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE CURLED WOOD MAT 1.55 .19 .00 0. STABLE 7.95 443.9 .54 .063 SYNTHETIC MAT 2.00 .16 .00 0. STABLE 12.31 1218.4 .45 .039 I PERMANENT (FLEXIBLE) VEGETATIVE A 3.70 .53 .00 0. STABLE 7.00 1835.4 1.46 .903 VEGETATIVE B 2.10 .51 .00 0. STABLE 4.12 452.8 1.41 .818 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE C 1.00 .35 .00 0. STABLE 2.89 63.5 .96_:294J VEGETATIVE D .60 .28 .00 0. STABLE 2.12 15.7 .78 .172 *** WARNING: DEPTH DID NOT CONVERGE. PROGRAM WILL CONTINUE WITH MOST RECENT VALUE VEGETATIVE E .35 .25 .00 0. STABLE 1.39 3.1 .70 .123 RIGID CONCRETE ******* .11 .00 0. STABLE ****** .0 .31 .015 GROUTED RIPRAP ******* .16 .00 0. STABLE ****** .0 .45 .040 Page 1 60162641 Gonzalez Road-Infiltration Basin 1 D2inge Area(Sf) 43639 Designed By: ABW Imp Area(sQ1 12913 Date: V3012011 (A)Drainage Area(Ac) 1.001814 (I.)Imp Fraction 0.30 (Rc)Rainfall Depth Per State SWP(in) 1.5 Step 1: Determine Runoff Volume Simple Method a' RV =.05+.9(/A) =Rv(post)=.05t.9'.4 = 0.32 Rv(pre)=.05-.9.0 0.05 n V=3630xR,xRvxA Post V=3630'37'0.66 t4237 V(post)= 1725 cf Min.Treatment Vol(Post-Pre- t]26 cf Treatment Vol in Ac-in 0,48 awn Step 2: Determine Surface Ama�Min, 2.V Min.Treatment Vol= 4314 cf (K)InLltration Rate(iNhq 2.063 (T)Intended Days to Infiltrate(days) 5 a. A V =A=34541(2'(3.94-2)) Min SA of Basin= Bd of = 2 * (K * T) Step 3.Determine Dimensions Basin Volume 55 Depth to Exist gmunt to SRWT(ft) 500 Ex'Istng Ground Elevation 903 Bypass Weir Elevation NA Design Sto2ge Elevation 10.00 Flow Splitter- Inlet Elevation NA Bottom Elevation 7.00 Flow Splinter Bypass Flow Outlet Elev NA Flow Splitter-Outlet to Basin Elev. NA Top of Berm Elevamh 10.00 Storage Depth 3.00 Surface Area Reguired(Avg of Top and Bottom SA) 1438 Target Area 1438 sl Top Width Q Sbmge Elev 39 Tap Length Q Storage Elev 56,9 Area Top of Storage= 23U sf Bottom Width 21 Bottom Length 38.9 Area Bottom of Storage= 900 st Actual Width Used at Storage Elev 48 Actual Length Used at Storage Elev 48 Avg Surface Area = 1602 if Actual Width Used at Bottom Elev 30 Actual Length Used at Bottom Elev 30 Volume of Basin(Depth-SA)= U06 cf 4.Calculation of Volumetric Flow Rate of InOtration and Drawdown 0 from inOle.tion: -0 is actually to Darcian Flow Rate Area(sf) (K)one 0(infiltratlon)= 0.04 cls Q=A (K) Conversion=efs 900 2.063 Example Calculation of Q:Since Area=4556sf (K)=3.94inlhr 3.94in If Ihr 4556sf 0.42cJs hr 12(n 3600s Drawdown Time for Treatment Volume Dmwdown Time for Design Vol Ewm le Caludalim: 0.42es V=3458c Volume cf o Ronre Da s P Q— f f 48a6 1 0.04 31.1 1.29 V 3458ft' Is Ihr —=T .'. =2.Ihrs=.089days Q 1 0.42f' 3600s JUL 2 8 2011 60162841 Gonzalez Road•Infiltration Basin 2 Dainge Area(So 35948 Designed By: ABW Imp Area(at) 35948 Dale: 4/4/2011 (A)Drainage Area(Act 0.829253 0I Imp Fraction 1.00 (RalRainfall Depth Per State SWPdn) 1.5 Step 1: Determine Runoff Volume Simple Method a. =,05},9([A) =Rv(pcs)=.05-.9.4 = 0,95 Rv(pro)=05t.9-0 = 0,05 l V=3630xRoxR,,xA Post V=363037'066'.4237 V(post)= 4269 of Min.Treatment Vol post-Prep 4269 d Treatment Vol in Ac-in 1.18 atom Step 2: Determine Surface Area.Min. 11 2.5-Min.Treatment Vol= 106]2 cf K Infiltration Rate(ml 5.373 (I intended Days to Infiltrate Ida sl 5 a. V =A A=3454/(2'(3.942)) Min SA of Basin= 79 sf = 2 * (K * T) Step 3.Determine Dimensions Basin Volume Depth to Exist grount to SHWT(0) 4.00 Existing Ground Elevation 13.00 Bypass Weir Elevation NA Desgn Storage Elevation 13.00 Flow Splitter- Inlet Elevation NA Bottom Elevation 11.00 Flow Splitter-Bypass Flow Outlet Elev NA Flaw Splitter-Outlet to Basin Elev. NA Top of Be.Elevation 13.00 Storage Depth 2.00 Surface Area Required(Avg of Top and Bottom SA) 5336 Target Area 5336 5f Top Width @ Storage Elev 76 Top Length @ Storage Elev 82.2 Area Top of Storage= 1314 of Bottom Width 64 Bottom Length 70.2 Area Bottom of Storage= 45"of Actual Width Used at Storage Elev 17 Actual Length Used at Storage Elev 82 Avg Surface Area = 5432 e1 Actual Width Used at Bottom Elev 65 Actual Length Used at Bottom Elev 70 Volume of Basin(De th'SAI= 108"of 4.Calculation of Volumetric Flow Rate of Initiation and Drawdown Q from infiltration: 'O is actually the Darcian Flaw Rate Area(s0 (K)in/hr Q(infiltration)= 0.57 eta Q=A (K) Conversion=cfs 4550 5,373 Crumple Calculation of Q:Sur@ce Area=4556sf (K)=3.94in/hr 3.94in Ift Ihr 4556 sr =0.42cfs hr [ in 3600s Drowdown Time for Treatment Volume Drawdown Time for Design Vol Exam le Calailaticn: 0.42cs V=3458c Volumed G Houre oa a P Q- f ✓ 10864 1 0.57 15.3 O.z2 V_l, 3458/1 is lhr —21hrs=.089dgvs Q 1 0.42 ft' 3600s JUL 2 8 2011 V. SEASONAL HIGH WATER TABLE DETERMINATION AND INFILTRATION TESTING Camp Lejeune 13 Testing Onslow County, North Carolina TCG Job#7478 Prepared For: Daniel K. Schaefer, P.E. Froehling & Robertson, Inc. 310 Hubert Street Raleigh, NC 27603 Prepared By: The, Catenal G oup The Catena Group, Inc. 410-B Millstone Drive Hillsborough, NC 27278 Tel (919) 732-1300 Fax (919) 732-1303 April 4, 2011 J G D >p a• a 9 G �Aki�A hn C. Roberts 1292 ' —r i JUL 2 8 2011 _, INTRODUCTION Froehling & Robertson, Inc. (F&R) is investigating the construction of infiltration basins for construction projects located on Camp Lejeunc in Jacksonville, Onslow County, North Carolina. Stormwater infiltration basins are being considered to collect and infiltrate runoff from adjacent impervious surfaces. As part of the application process, a soils investigation detailing soil type, depth to seasonal high water table, and saturated hydraulic conductivity is required. The Catena Group, Inc(TCG) has been retained to perform the soils investigation. INVESTIGATION METHODOLOGY Prior to the field investigation, the Onslow County Soil Survey was referenced to get an overview of the possible soil series located within the study area. There are three mapped soils; Baymeade fine sand, Baymeade-Urban land complex, and Marvyn fine sand(Table 1). A copy of the Natural Resource Conservation Service (MRCS) soil map is appended. Table t - Soil Series, Map Unit S mbol, and Taxonomic Classification Map Unit Soil Series Taxonomic Class Symbol BaB Baymeade fine sand loamy, siliceous, semiactive, thermic arenic ha ludults BmB Baymeade-Urban land loamy, siliceous, semiactive, thermic Complex arenic ha ludults MaC Marvyn loamy fine sand fine, loamy, kaolinitic, thermic typic kanhapludults The field investigation was performed on March 30 and April 1, 2011. Soil borings were advanced with a hand-tumed auger at the predetermined locations shown on the attached map. Observations of the landscape (slope, drainage patterns, past use, etc.) as well as soil properties (depth, texture, structure, seasonal wetness, restrictive horizons, etc.) were recorded. Soil color was determined with a Munsell Soil Color Chart. The rate of water entry into a soil is referred to as the infiltration rate. The infiltration rate into a soil decreases with time mainly due to an increase in the soil water content and a decrease in the hydraulic gradient. As infiltration continues, the rate of water entry into the soil reaches a constant value (steady state condition), which is considered to be the same as the saturated hydraulic conductivity (KSAT) of the soil. The KSAT was measured in the field and used to characterize the infiltration rate for the proposed infiltration basin. KSAT measurements were performed at the proposed infiltration basin using a constant-head permeameter(Amoozemeter). An Amoozemeter was used in the place of a double ring infiltrometer because of the need to conduct the test below current grade. EJUL 2011 Lejeune 13 Testing April 4, 2011 TCG Job#7478 1 RESULTS Soil Type The majority of soil areas tested was in a natural state and was fairly consistent across the site in relation to texture and structure. Table 2 presents each boring with a soil series determination. Determination of soil series was made through a comparison of soil boring descriptions to the NRCS Official Series Description (OSD). A significant amount of fill material, ranging from 25 to 58 inches, was observed at locations 10— 12. Full soil profile descriptions are appended. The observed profile sequence generally matched one of the three mapped NRCS soil series, as noted in Table 2. Table 2 -Soil Series Determination and Depth to SHWT AECOM# TCG Boring# Soil Series Determination SHWT Determination inches below surface 1 133 Marvyn loamy fine sand 52 2 B 1 Baymeade-Urban land Complex 50 3 132 Baymeade-Urban land Complex 23 4 134 Baymeade fine sand 46 5 135 Baymeade fine sand 60 6 B6 Baymeade fine sand 44 7 B7 Baymeade fine sand 87 8 138 Baymeade fine sand 68 9 139 Baymeade fine sand 84 10 1310 Baymeade fine sand 16 11 1311 Baymeade fine sand >84 12 1312 Baymeade fine sand 64 13 1313 Baymeade fine sand 56 14 1314 Baymeade-Urban land Complex 34 Depth to Seasonal High Water Table The preliminary design has the bottom of the BMP approximately 48" (4 feet) below grade. As such, the borings were advanced to a depth of 7" or to the depth of the seasonal high water table (SHWT), whichever is deeper. The depth to the SHWT was noted at each boring based on redoximorphic features, the presence of saturated soil, evidence of organic staining and best professional judgment. Infiltration Rate One saturated hydraulic conductivity test was performed at each predetermined point and the results of each test are shown below in Table 3. Since soil is inherently non-homogeneous, field tests can often misrepresent the aerial hydraulic conductivity of a soil. In particular, field tests typically underestimate the saturated hydraulic conductivity of clayey soil and overestimate it in sandy soils. As a result of this misrepresentation, a"moderation factor" is suggested to convert point saturated hydraulic conductivity to aerial saturated hydraulic conductivity for each proposed infiltration basin. Since the soil tested contained a significant amount of sand, a moderation factor of 0.75 was used to correct for the potential of over-estimating the infiltration rate. Lejeune 13 Testing JUL 2 8 2011 I April 4, 2011 TCG Job 47478 _1 2 Table 3-Results of Saturated Hydraulic Conductivity Tests AECOM Test Test Depth Texture Measured 75% of Measured Location in KSAT in/hr KSAT in/hr 1 31.5 loamy sand 7.168 5.376 2 23 loamy sand 2.750 2.063 4 22 sandy loam 2.411 1.808 5 36 sandy loam/sandy 0.141 0.106 clay loam 6 20 loamy sand 1.847 1.386 7 61 loamy sand 24.381 18.286 8 41 loamy sand 2.349 1.761 9 60 sandy loam 3.654 2.741 II 25 loamy sand 0.369 0.276 12 23 loamy sand fill 0.983 0.737 13 21 loamy sand 1.515 1.137 Saturated hydraulic tests were not performed at locations 3 and 14 due to a SHWT within 36 inches of the soil surface. A saturated hydraulic test was not performed at location 10 due to the appearance of a SHWT at 16 inches and the presence of structureless expansive clan and sandy clay textured fill material within 44 inches of the surface. With exception of tests performed at locations 5, 11, and 12, calculated KSAT values were above 1.0 in/hr. Lower KSAT values generated at locations 11 and 12 are attributed to the presence of fill material. Location 5 had the lowest measured rate and is attributed a soil moisture content within the test zone just below field capacity. CONCLUSIONS The findings presented herein represent TCG's professional opinion based on our site and soils evaluation. Our soil evaluation revealed a SHWT that ranged from 16 ->84 inches below the soil surface throughout the study area. Saturated hydraulic conductivities were conducted in the soil material two feet above the SHWT. This report is provided to assist in the application for an infiltration basin by providing the soil information. North Carolina DWQ must issue the final permit. Any concurrence with the findings in this report would be made at that time. JUL 2 8 2011 Lejeune 13 Testing April4, 2011 TCG Job#7478 3 i RECEIVED MAY 2 6 2011 DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis®ncmail,net It there are more than 7areas to be tested, attach a second sheet. SS State Soil Scientist Confirmation Visit date/time: Z J Project Name: USMC Camp Leieune Gonzalez Boulevard Ext. County: Onslow Street Address: Latitude: 34°39'40.42"N Longitude: 77°19'37.45"W Directions from the nearest intersection of two major roads: In Jacksonville go East on NC24 (Leieune Blvd) to Camp Leieune main gate. Turn Left onto Sneads Ferry Rd. Approximately 1.4 miles on Right. >1 acre being disturbed? KYES ONO CAMA Major required?JKYES ONO Consultant Name: Andrew Wilson Phone: 919-854-6225 Consultant Firm Name: AECOM Bore Number 1 2 3 4 5 a Existing Ground Elevation 13 9 b Proposed Bottom Elevation 11 7 c Difference a minus b 2 2 cl Add 2 ft. Min. Bore Depth) 4 5 e Hardpan Depth? NA NA f Approx. Elev. Of SHWT 9 5 Max. lowest bottom elev. 11 7 h Infiltration Rate OK? ' I Confirmation of SHWT " 1,96 For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. 'State Soil Scientist Use ONLY Comments 'Bore Number 1" is represented on the attached map as point 1" and is the "TCG Borinq # 83" in the attached soils report. This is the first borinq that Vincent Lewis and Ron Johnson(AECOM)walked to from the barracks construction site."Bore Number 2" is represented on the attached map as point "2" and is the "TCG Boring # B1" in the attached soils report. This is the second boring that Vincent Lewis and Ron Johnson walked to from the Tank Trail iust South of the proposed bridge location. Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand-delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be ADDENDUM POINT 14 INFILTRATION TESTING Camp Lejeune 13 Testing Onslow County,North Carolina TCG Job# 7478 Prepared For: Daniel K. Schaefer, P.E. Froehling & Robertson, Inc. 310 Hubert Street Raleigh,NC 27603 Prepared By: The � Catena, The Catena Group, Inc. 410-B Millstone Drive Flillsborough, NC 27278 Tel (919) 732-1300 Fax (919) 732-1303 April 12, 2011 Sort JG N G. Rpe�` Gm29^_ 1292 .John C. Roberts INTRODUCTION Freehling & Robertson, Inc. (F&R) is investigating the construction of infiltration basins for construction projects located on Camp Lejeune in Jacksonville, Onslow County, North Carolina. Stonnwater infiltration basins are being considered to collect and infiltrate runoff from adjacent impervious surfaces. As part of the application process, a soils investigation detailing soil type, depth to seasonal high water table, and saturated hydraulic conductivity is required. The Catena . Group, Inc (TCG) has been retained to perform the soils investigation. This report is submitted as an addendum to the initial TCG report dated April 4, 2011. INVESTIGATION METHODOLOGY The rate of water entry into a soil is referred to as the infiltration rate. The infiltration rate into a soil decreases with time mainly due to an increase in the soil water content and a decrease in the hydraulic gradient. As infiltration continues, the rate of water entry into the soil reaches a constant value (steady state condition), which is considered to be the same as the saturated hydraulic conductivity (KSA r) of the soil. The KsAT was measured in the field and used to characterize the infiltration rate for the proposed infiltration basin. KsAr measurements were performed at the proposed infiltration basin using a constant-head permeameter(Amoozemeter). RESULTS Soil Investigation A description of the soil and methodology for the investigation is detailed in the April 4, 2011 Seasonal High Water"fable Determination and Infiltration Testing report. Infiltration Rate The KsAT measurement for AECOM point 14 was performed on April 8, 2011. Table 1 summarizes the results of the KsAT test and the worksheet is attached. 'fable 1 - Results of Saturated Hydraulic Conductivity Tests AECOM "Pest Test Depth Texture Measured 75%, of Measured i Ks�Tin/ r / rLocation `rh 14 1 8 1 loirny sand 5.636 4.227 CONCLUSIONS The findings presented herein represent TCG's professional opinion based on our site and soils evaluation. This report is provided to assist in the application for an infiltration basin by providing the soil information. North Carolina DWQ must issue the final permit. Any concurrence with the findings in this report would be made at that time. HYDRAULIC CONDUCTIVITY STUDY Le'eune Testin Date: 4MI2011 Weather Cord1ll4n: Sunny AECOM Location: 14 Temperature IF): 70 Number: 14 Hodson: A Icm inches Depth(inches): 8.0 SET UP Target Water Level:15.2 60 cm inches Beginning Water Level: 15.2 6.0 Hale Depth(cm): 2 .3 '6. Ending Water Leval: 15.2 6.0 Reference(cm): 1 + 1 .4 k4.5' Head(cm): - 15.2 16.0 _ CHT Tube(s)setting: = 16.5 6.5, Hole diameter(cm):`6.O7 1 Hole radiu a(r):2.5 cm Valve Setting: r- 'xr� coefficient A: 0.001136 1-ON 2-ON. NOTE:Readings based on Ending Water Level Goversim Factor(C.F.): 105.0 Water change in Chamber clock Elapsed Time O K K Reading water level O.F. time(min) (min) (hr) (cm3Ru) (cm/nr) (n/hr) 38 ( 0.0 105.0 '0.0,, 34. .� 4.0 106.0 �2.0 2.00 0.033 12600.0 14.3165 5.6364 90` I 4.0 105.0 4t0 2.00 0.033 12600.0 14.3165 5.6364 '. 26, ! 4.0 105.0 6.0.' 2.00 0.033 12600.0 14.3165 &6364 40 105.0 '8.0. 2.00 0.033 12600,0 142165 5.6364 ! 18 .I 4.0 105.0 .10.0 2.00 0,033 12600.0 14.3165 5.6364 Flnal Ksat 14.316 5,636 SEASONAL HIGH WATER TABLE DETERMINATION AND INFILTRATION TESTING Piney Green Infiltration Basin Testing Onslow County, North Carolina TCG Job# 7480 Prepared For: Daniel K. Schaefer, P.G. Froehling& Robertson, Inc. 310 Hubert Street Raleigh, NC 27603 Prepared By: The COIC � Group 110 The Catena Group, Inc. 410-B Millstone Drive Hillsborough, NC 27278 Tel (919) 732-1300 Fax (919) 732-1303 April 11, 2011 S01i S�+/ JG r� c'R049 F �.nn Iohn C. Roberts ) qz �'�Rt?RIH INTRODUCTION Freehling & Robertson, Inc. (F&R) is investigating the construction of infiltration basins for construction projects located on Camp Lejeune in Jacksonville, Onslow County, North Carolina. Stormwater infiltration basins are being considered to collect and infiltrate runoff from adjacent impervious surfaces. As part of the application process, a soils investigation detailing soil type, depth to seasonal high water table (SHWT), and saturated hydraulic conductivity (KSAT) is required. The Catena Group, hic (TCG) has been retained to perform the soils investigation. INVESTIGATION METHODOLOGY Prior to the field investigation, the Onslow County Soil Survey was referenced to get an overview of the possible soil series located within the study area. The soil series mapped within the study area are the Onslow line loamy sand and Urban land (Table 1). A copy of the Natural Resource Conservation Service (NRCS) soil map is attached(Figure 1). Table I - Soil Series, Map Unit Symbol, and Taxonomic Classification Map Unit Soil Series Taxonomic Class Svtnbol On Onslow fine loamy sand Fine loamy, siliceous, thermic S podic Paleudults Ur Urban land n/a The field investigation was per on April 7 and 8, 2011. Soil borings were advanced with a hand-turned auger at the predetermined locations shown on the attached map. Observations of the landscape (slope, drainage patterns, past use, etc.) as well as soil properties (depth, texture, structure, seasonal wetness, restrictive horizons, etc.) were recorded. Soil color was determined with a Munsell Soil Color Chart. The rate of water entry into a soil is referred to as the infiltration rate. The infiltration rate into a soil decreases with time mainly due to an increase in the soil water content and a decrease in the hydraulic gradient. As infiltration continues, the rate of water entry into the soil reaches a constant value (steady state condition), which is considered to be the same as the KSAT of the soil. The KSAT was measured in the field and used to characterize the infiltration rate for the proposed infiltration basin. KSAT measurements were performed at the proposed infiltration basin using a constant-head permeameter (Amoozemeter). An Amoozemeter was used in the place of a double ring infiltrometer because of the need to conduct the test below current grade. RESULTS Soil Type The majority of soil tested was in a natural state and was fairly consistent across the site in relation to texture and structure. Table 2 presents each boring with a soil series determination. Determination of soil series was made through a comparison of soil boring descriptions to the NRCS Official Series Description (OSD). Full soil profile descriptions are attached. Piney Green Inf. Basin Testing April ll, 2011 TCG Job#7480 1 Table 2 - Soil Series Determination and Depth to SHWT Point# Soil Series Determination SHNJ'T Determination inches below surface 1 Onslow tine loamy sand 28 2 Onslow fine loamy sand <12 3 Onslow fine loamy sand 50 4 Onslow tine loamy sand <12 5 Onslow fine loamy sand 25 6 Onslow fine loamy sand <12 Depth to Seasonal high Water Table The preliminary design has the bottom of the infiltration basin approximately 48" (4 feet) below grade. As such, the borings were advanced to a depth of T or to the depth of the SHWT, whichever is deeper. "file depth to the SHWT was noted at each boring based on redoximorphic features, the presence of saturated soil, evidence of organic staining and best professional judgment. A SHWT depth less than (<) 12 inches from the soil surface was determined for points 2,4, and 6. Although soil characteristics depict the SHWT at or near the surface, existing ditches near these points has likely altered the hydrologic regime. In order to estimate the altered regime, additional soil testing including KsAT testing and modeling would required. Infiltration Rate One KsAT test was performed at each predetermined point where the SFI WT was greater than 12 inches from the surface (Table 3). Since soil is inherently non-homogeneous, field tests can often misrepresent the aerial hydraulic conductivity of a soil. In particular, field tests typically underestimate the KsnT of clayey soil and overestimate it in sandy soils. As a result of this misrepresentation, a "moderation factor" is suggested to convert point saturated hydraulic conductivity to aerial saturated hydraulic conductivity for each proposed infiltration basin. Since the soil tested contained a significant amount of sand, a moderation factor of 0.75 was used to correct for the potential of over-estimating the infiltration rate. Table 3 - Results of Saturated Hydraulic Conductivity Tests Point# 'rest Depth Texture Measured 75%, of Measured in Ks,.,. in/hr Ksnr in/hr 1 6 sandy loam 2.027 1.52 3 14 sandy loam 0.860 0.645 5 8 sandy loam 6.265 4.70 Saturated hydraulic tests were not performed at locations 2, 4,and 6 due to a SHWT within 12 inches of the soil surface. All tests were performed in sandy loam textured soil horizons near the surface and the worksheets are attached. The I{SAT value measured at point 3 was the lowest measurement of the three tests. This is likely due to a "heavier" sandy loam, indicating an increase in clay/silt content, than what was observed in other sandy loam horizons., This increase in fine-sized soil particles likely accounts for the lowest infiltration rate. Values for measurements taken at points t and 5 are within the expected range for sandy loam textured surface soils. It should be noted that KsAT measurements only represent the infiltration rate within the tested soil horizon and cannot be extrapolated throughout the soil profile. Piney Green Inf. Basin Testing April 11, 2011 TCG Job #7480 2 CONCLUSIONS The findings presented herein represent TCG's professional opinion based on our site and soils evaluation. Our soil evaluation revealed a SHWT that ranged from <12 - 50 inches below the soil surface at points 1, 3, and 5. KSAT were conducted in the soil material two feet above the SHWT or shallow when needed. This report is provided to assist in the application for an infiltration basin by providing the soil information. North Carolina DWQ must issue the final permit. Any concurrence with the findings in this report would be made at that time. Piney Green Inf. Basin Testing - April 11, 2011 TCG Job P7480 3 x" px"�x §!e� t i r t ��..4 s d P2-. yy, ,' td ? p f�. ✓� ., f �' tt� }���{e'bnr ,� fy A� If, I f - X tt l a t n\ f#„ ,q"`+ #�°§¢ �cY �iek. r 11 t �pn ,p� sHNL try 1{ >nt t J Yi kktt" ` .9 ,t „�..v.n.-...fe. <, iy'f 1k . rt,k}rlfta{,.i : >J 4: A'4 1+ X� rt ti: Y veyfr`�1 , �Zy4� �F �.`I � a�A '` � r.,,,�t�� t �' ti y`i�+�"' RR�i4,. g �i§'3,• 'yy w d 6� r tiA'4E 5 {IX A ° n arty Aw i , YJ�'t f�C } 3 4Ji{j!w i r�yfry t�" .✓� t 't', i .'" '" '� ',' r *� ✓ r '"t �4 r 4 `Sitt4" � it�tue.yk ,� �ty'� ih�">tn t< 3 � >t2 ttf ri TO �i 4 i y�'.E�1 SS �r� `V'-' Ar§4 'Nfe +e rf}r rM ;yr "''. r ' �„t �',t ,hi Let�` tdt .{'f "1.•p/�•S s n', �` � x a ?",� .�h,Iltv ,,�,y�d'�'��y,� '��nff'�✓fY�6 ,� ' .7,adtn d s . rd f .+.°/" �rP'hi ° 1$t t✓k. ik t F e K }',�i � }� ��� u e.^ Y�ry,. � i✓�� l\`�'j+ a �i't C.C��}yE�} 'vt�jt X�i� � t �k��',*. It- ry y/ '4 / J ^y�i Ciwdl 'r.. �77 {,fiSyy `� yt� nk y'� f, =r,,.x �i '„,�"r��d; �.✓ "" 'r. �4' Ni, ,„. 'J'� hp"' :»' „y ` � .a r �'''#`� 4 f-s S z t 1!.� yF.XJ` •"'` ,`C 9 '-�,'. § " P b" K '*7R( �I' 'diA.n. pi ' ,h � ',,h f u ` � J 1 i /e„r".. ' ' � „q � � r� ��'� Nc,;A�,4 jS��jr�� ,�•$� � 56 #t * '£�4 4G NRCS Soil Series f tea � > _ ay-a BB Bmeade f ( t /'emu- i Oh Sys x_ llFf. On - Onslow7�� g Ass yUr- Urban . f� �. ,� 3� � izf eX st t4 -J,rr Wo- Woodington ��' ! 't ctmi „rt rtia F �S f 4 m '_.O" Soil Boring Soil Boring and Ksat Location SHWT Determination Dote; Figure The nPm zon and Infiltration Testing Catena Piney Green Road soie ,ou zoo Feet Group Onslow County, North Carolina 7480 SOIL/SITE EVALUATION sneer _-f G (ConrinuoGon Sheer) DEPARTMENT OF BNVIIZONMIiNT � 1� PROPERTY ID#c�.N,yf,rlirr AND NATURAL RESOURCES I., DATEOFEVALUATION: %7--/J DIVISION OF ENVIRONMENTAL HEALTH COUNTY:Qn y/ P Q R SOIL MORPHOLOGY OTHER F (.1941) PROFILE FACTORS L .1940 E LANDSCAPE HORI7 ON .1942 POSITION/ .1941 .1.941 SOIL .1943 .19.56 .1944 PROFILE 0 SLOPE% STRUCTURE/ CONSISTENCE/ WETNESS) SOIL SAPRO RES'rR CLASS DEPTI{ ' TEXTURE MINERALOGY COLOR (Iq•1 { DEPTH CLASS IIORI'!. G MAR I ,�T Bt l -zo TJ' 3'S�s)� 2.SY 5�3 Gr lZSY ?/G 1�1j °+ L3 2ic Il �� rak 5ci i fffw � hY h� t�G.3 G, D2.3-Y ble /np laV.R yHsJ1, 12" ,5 , (,q �, mr SI.SiC.. 51 V I'I rsrr+P AFi^+eCN7 �,rl '✓ `jG7Ua A'(1� �1 j�rr pp 1p yr 20-3(, 2, i;. Yh/eta k�U �o' � 1?^+, 5b(c 1/ �,r $;�sP. 2•S �RJ4 j �r /r Z,: k �"S � ;{-2.gY �. wT�it rscz t')U Yz, 1, �-,.SIiC si �:. /qP z 15 '/r G,n COMMF.N'rs: SOIL/SITE EVALUATION sheerIa/ -? (Continualion Sheel) - DBPAR't'Mc'N'10F F.N VIILONMIiN'!' PROPGRTY IDk: ;I 1.,.�eu AND NATURAL RESOURCES DATE OF EVALUATION: DIVISION OP ENVIRONvrENTAI.HEALTil COUNTY:" R SOIL MORPHOLOGY OTHER F (.1941) PROFILE FACTORS 1940 E LANDSCAPE HORI7 .1942 POSITION/ .1941 .I931 SOIL .1943 .1956 .1944 PROFILE ON STROCTLIRFJ CONSISTENCE/ WETNESS/U SLOPE% DFPTt1 SOIL SAPRO RF,S'1'R CLASS (I`) TEXTURE MINERALOGY COLOR DEPTI( CLASS IIORIZ &LTAR l� 1S r Y ���^F �09R jffi �)A ioh. (OW,311 1 5 'v 4 L, d 6 _(/� 13 3a ) e,,, 2,'SY`°lr.� I2 �, ,'_, �J3, e.t '•sY y l Y< 34- 01�J) /v'n gl d"� n5%p Sntu{p�Gaf �i� �jJ, /d r St vri "' I nOY� �i Z -I$ IJ <-. nfe 5/ vd✓ ^s/ P joyP,, 3fy ;Lf 13ss/sp �,;y �s; G C iaf c.p r7r2 sej °�i �5//Y IoYP �°iaJ S D /0`r S/6 c, 1J! 0 t2 b y�r 5t r�� rf�tJ z/l A HYDRAULIC CONDUCTIVITY STUDY Le eune Testing Date: 4r/2011 Weather Condition: Sunny AECCM Loce6on: 1 Temperature(F): 65 Number: 1 Horimn: A lion inches Depth(inches): 6.0 SET UP Target Water Level: 12.7 5.0 an inches Beginning Water Level: 12.7 5.0 Hole Depth(cm): 15.2 f6A Ending Water Level 12.7 5.0 Reference(cm): ♦ 165 )65 Head(crm - 127 50� t �..._...�_� CHT Tube(s)setting: = 191 7.5, Hole diameter(cm) _ Hole radios(r):2.5 cm Valve Setting: { - ��'z' coefficient A: 0.001486 1-0N 2-ON NOTE: Readings based on Ending Water Level Coversiou Factor(C.F.): 105.0 Water change in Chamber clock Elapsed Time O K K Reading water level C.F. time(min) (min) (hp (cm3fir) (cm/nr) (in/hr) 39 0.0 105.0 :0.0 37.8 1 1.2 105.0 .�2.0 2,00 0.033 3700.0 5.6161 2.2111 363 t IA 105.0 4.0 2,00 0.033 3465.0 5.1481 2,0268 35.6 7.1 105.0 ,6.0 2.00 0033 3465.0 5.1481 2.0268 34.5 1.1 105.0 30 2.00 0.033 3465.0 5.14BI 2.0268 Final Ksat 5.148 2.027 HYDRAULIC CONDUCTIVITY STUDY Le'eune Testin Date: 4(7/2011 Weather Condition: Sunny AECOM Location: 3 Temperature(F): 65 (dumber: 3 Horizon: A icm inches Depth(mches): 14.0 SET UP Target Water Level: 17.8 7.0 cm inches Beginning Water Level: 12.7 50 Hole Depth(orm: 35.6 31410 Ending Water Level: 12.7 5.0 Reference(cm): a 12.7 I Head(cm): - 17.B 'i7.0` -( _ CHT Tube(s)setting: =30.5 71t12-0„ J H.I.diameter(cm): Hole radius(N:2.5 cm Valve Setting: � :X, coefficient A: 0,001486 1-ON 2-ON NOTE: Readings based on Ending Water Level Coversion Factor(C.F.): 105.0 Water change in Chamber clock Elapsed Time O K K Reading water level C.F. time(min) (min) (hr) (cmWhr) (cm/hr) (in/h0 42 0.0 105.0 00 415 0,5 105.0 20 2.00 0.033 1575.0 2.3400 0.9213 41 0.5 105.0 40' +`{ 2.00 0.033 1575.0 2.3400 0.9213 405 0.5 - 105.0 60 $ 2.00 0.033 1575.0 2,3400 0.9213 40.1, OA 105.0 -8.0 l 2.00 0.033 1260.0 1,8720 0.7370 Fnal Ksat 2.184 0.860 2 6 2011 DIVISION OF WATER OUALITY .MAY INFILTRATION SYSTEM INVESTIGATION BY Complete and email this form to Vincent.Lewis @ncmail.net. If there are more than 7 areas to be tested, attach a second sheet. SS State Soil Scientist Confirmation Visit date/time: 1 �/ Project Name: USMC Camp Leieune Gonzalez Boulevard Ext. County: Onslow Street Address: Latitude: 34039'40.42"N Longitude: 77019'37.45"W Directions from the nearest intersection of two major roads: In Jacksonville go East on NC24 (Leieune Blvd) to Camp Leieune main gate Turn Left onto Sneads Ferry Rd. Approximately 1.4 miles on Right i>lsacre being disturbed? YES ❑NO ,. CAMA Major-required?X.YES ❑NO Consultant._Name: Andrew Wilson Phone 919.854-6225 Consultant Firm Name: AECOM =Dethh'> er 1 2 3 4 5 round Elevation 13 9 Bottom Elevation 11 7 a minus b 2 2 Min. Bore Depth) 4 5 De th? NA NA f Approx. Elev. Of SHWT 9 5 Max. lowest bottom elev. 11 7 h Infiltration Rate OK? " i Confirmation of SHWT ' ✓O S For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. 'State Soil Scientist Use ONLY Ii Comments "Bore Number 1" is represented on the attached map as point "1" and is the "TCG Boring # B3" in the attached soils report This is the first boring that Vincent Lewis and Ron Johnson(AECOM) walked to from the barracks construction site `Bore Number 2" 3 is represented on the attached map as point "2" and is the "TCG Boring # 131" in the ! attached soils report This is the second boring that Vincent Lewis and Ron Johnson 111 walked to from the Tank Trail lust South of the proposed bridoe location Required Attachments: - — 1. Legible vicinity map. JUL 2 S 2011 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site {Mns_should.. 1 be emailed or hand-delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be i Si 7 For DE Use ONLY R ewer �i AR A. Carolina Department of Environment and '�I Natural Resources Submit. NCDENR Request for Express Permit Review rime: I e: L+S Coafrm: �—r FILL-IN all the information below and CHECK the Permit(s)you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative.site plan(PDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. • Asheville Region-Alison Davidson 828-296-4698;alison.davidson(o)ncmail.net Enter Related SW Permits of repuest • Fayetteville orRaleigh Region-David Lee 919-791.4203;david.lee(oDncmail.net • Mooresville&-Patrick Grogan 704-663.3772 or patrick.grogan(�ncmaili SW • Washington Region-Lyn Hardison 252-946.9215 or Iyn.hardisonGDncmail.net SW Wilmington Region-Janet Russell910-350-2004 orianet.russell(dncmail.net SW SW NOTE:Project application received alter 12 noon will be stamped in the following work day. SW Project Name:GONZALEZ BOULEVARD EXTENSIONS County:ONSLOW Applicant:COMMANDING OFFICER MARINE CORPS BASE Company:CAMP LEGEUNE,NC Address: 1005 MICHAEL ROAD City:CAMP LEGEUNE,State: NC Zip:28547-_ Phone:910-451-5950.Fax:_ ---,Email: Physical Location:MCB CAMP LEJEUNE Project Drains into SEE ATTACHMENT waters—Water classification see attachment(for classification see- hftp:l/h2o.enr.state.nc.us/bims/reports/repolsWB.htmll Project Located in WHITE OAK River Basin.Is project draining to class ORW waters?N,within Y22 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters?N Engineer/Consultant:BRYAN M.DICK PE.PH Company:AECOM 1�LC]LiT V Y'iJL1r Address:701 CORPORATE CENTER DRIVE SUITE 475 City: RALEIGH,State:NC Zip:27607 Phone:919-854-6200,Fax:919-854-6259. Email:bryan-dick@aecom.com JUL 0 1 Z011 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑Scoping Meeting ONLY ❑DWQ,❑DCM,❑ DLR, ❑OTHER: SECTION TWO: CHECK ONLY THE PROGRAM(S)YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑Stream Origin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑Intermittent/Perennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑401 Water Quality Certification ❑Isolated Welland(_linear fl or_acres) ❑Riparian Buffer Authorization ❑Minor Variance ❑Major General Variance ®State Stormwater ❑ General ❑SFR, ❑SFR< 1 ac. ❑Bkhd&Bt Rmp, ❑ Clear&Grub, ❑Utility El Other ®Low Density% ❑Low Density-Curb&Gutter _#Curb Outlet Swales ❑Off-site[SW_ (Provide permit#)] ❑High Density-Detention Pond _#Treatment Systems ®High Density-Infiltration 2#Treatment Systems ❑High Density-Bio-Retention _#Treatment Systems ❑High Density—SW Wetlands _#Treatment Systems ❑High Density-Other _#Treatment Systems /❑MOD:❑Major❑ Minor❑Plan Revision❑ Redev.Exclusion SW (Provide permit#) ❑Coastal Management ❑Excavation&Fill ❑Bridges&Culverts ❑Structures Information ❑Upland Development ❑Marina Development ❑ Urban Waterfront ❑Land Quality ❑Erosion and Sedimentation Control Plan with_acres to be disturbed.(CK# (for DENR use)) SECTION THREE—PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scooing and express meeting request) Wetlands on Site®Yes❑ No „Buffer Impacts:®No❑YES: —acre(s) Wetlands Delineation has been completed:®Yes❑No Isolated wetland on Property❑Yes®No US ACOE Approval of Delineation completed: ❑Yes®No 404 Application in Process w/US ACOE: ❑Yes ❑ No Permit Received from US ACOE❑Yes®No rrrrrr««rrarrrrr««rr rarrrr«««arrrrar«♦«♦rrrrarr r««r****.For DENR use onlyarrrrrr«rar rrr rrrrrrrrrr««rrrar««rrararrrrrrrrrrrr«ar arar««« Fees lit for multiple permiun Check# Total Fee Amount $ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance(❑Mal;❑Min) $ SW(❑HD,❑LD,❑Gen) 1 $ 401, ) $ LQS 1 $ Stream Deter,_ $ NCDENR EXPRESS March 2009 ^ HYDRAULIC CONDUCTIVITY STUDY La'eune Testing Dale: 4172011 Weather Condition: Sunny AECOM Location: 5 Temperature(F): 70 Number: 5 Horizon: A cm inches Deplh(inches): 8.0 S51 UP Tar Water Level: 15.2 . Jam inches Beginninging Water Level: 11 4 4.5 Hale Depth(cm): 20.3 8.0 Ending Water Level:12.7 5.0 Reference(cm): . 15.2 E6.0. i Head(cm): . 15.2 6.0 CHIT Tubes)setting: =20.3 '.S 0 � Hole tliameter(cm):I5:0 � Hole radius(r):2.5 cm Valve Setting: �. �. r�x., coefficient A: 0,001486 1-ON 2-ON NOTE: Readings based or Ending Water Level Coversioo Factor(C.F.): 105.0 Water changein Chamber clock Elapsed Time O K K Reading at.level C.F. time(min) (min) (M) (cmMr) (cnvhr) (inthr) 34 '1 0.0 1D5.0 '0.0 30 4.0 1D5.0 .2.0 2.00 0.033 126000 18.7203 7.3702 26.5 3.5 105.0 4.0 I 2,00 0,033 11025.0 16.3802 6U89 23.1 3.4 105.0 ;6,0 2.00 0.033 10710.0 15.9122 6,2647 1 '19.6 3.5 105.0 '-8.0 - 2.00 0.033 11025.0 163802 6.4489 16.3'. 3.3 105.0 10.0 p 2.00 0,033 10395.0 154442 6,0804 I i Final Ksal 15.912 6.265 Stormwater Management Plan Prepared For: MCB Camp Lejeune USMCB Camp Lejeune, Gonzalez Road Date: 04-05-11 AECOM 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 919-854-6200 Prepared By: Andrew Wilson, EIT Checked By: Bryan M. Dick, PE, PH i'-ZECC FIVF-D JUL 0 1 2011 BY:_- Project Description This document is to serve as a stormwater management plan for the MCB Camp Lejeune — Gonzalez Blvd Road Project. The proposed Gonzalez Blvd. Extension project (hereinafter "Gonzalez Blvd.") is located near the Hadnot Point Cantonment Area of Marine Corps Base Camp Lejeune in Onslow County, North Carolina. The proposed project involves new road construction, including a proposed bridge over Cogdels Creek, and construction of new sections of tank trail. The project limits are currently comprised of wooded areas and a wetland adjacent to Cogdel's Creek. The Gonzalez Blvd. site is not located within one half mile of SA waters. Contact Information AECOM Technical Services Inc. Attn: Bryan M. Dick, PE, PH 701 Corporate Center Dr., Suite 475 Raleigh, NC 27607 Telephone: 919-854-6252 Fax: 919-854-6259 Identify Project Involvement The proposed project is located in the White Oak River Basin. The project drains to Cogdels Creek (NCDWQ Index Number 19-23), which has an NCDWQ Stream Classification of SC, NSW. The Gonzalez Blvd. project will result in an increase in BUA of approximately 497,293.2 sf, which comprises less than 24% of the total project area, and thus qualifies as Low-Density per the Coastal Rules. According to the Coastal Rules, sites that qualify as low-density must treat stormwater primarily through the use of grassed swales and maintain a 50' vegetated buffer from surface waters. To meet this requirement, the stormwater runoff from the proposed roadway will be collected in vegetated swales along the proposed roadway or allowed to flow diffusely off the road surface. As required by the stormwater regulations, these swales are designed to meet the following criteria: • Side slopes of 3:1 or less • Slope no greater than 5% • Designed to carry the 10-year storm at a non-erosive velocity. JUL 0 1 2011 i3Y:�--- For the proposed bridge, a scoping meeting was held with DWQ and attended by both AECOM and MCBCL personnel, at which DWQ asked that the bridge be treated as a "pocket" of high density within the otherwise low-density permit, and that the stormwater runoff from the bridge be controlled prior to being discharged into the wetlands. Based on this requirement, the drainage system of the bridge has been designed such that stormwater will be conveyed into two proposed infiltration basins, one on the northeastern end of the bridge and one on the southeastern end. Stormwater Design Parameters The infiltration basins are based on the following parameters or objectives: • Provide 85% TSS removal • Protect the value of the receiving water resource • Bottom of basin is a minimum of 2' above elevation of the Seasonal High Water Table (SHWT) • Soil must have a minimum infiltration rate of 0.52 in/hr. • Basins were sized to store 2.5 times the required treatment volume and infiltrate that volume within 5 days using an infiltration rate of one-half the infiltration rate in the soils report, in order to waive both the offline bypass and vegetated filter strip requirements. Discussion of Treatment Measures The proposed treatment is to utilize 2 separate infiltration basins to meet the TSS and Peak Flow requirements set forth by DWQ. The soils of the project site are appropriate soils for infiltration and the season high water table at each basin will allow construction of these basins, with at least a 2' clearance for each basin. Each basin is designed to store 2.5 times the required treatment volume and infiltrate within 5 days using one-half the infiltration rate found from the LSS, so neither offline bypass' nor vegetated filter strips are required. Phase II requirements are met by using a grassed swale to collect sheet flow from the impervious areas and by the infiltration and storage volume provided in each basin. Conclusion This Stormwater Management Plan represents an environmentally sensitive and effective plan for utilizing the proposed stormwater treatments to accommodate the increased runoff of the proposed site development. VE JUL 0 1 2011 Ja 's to`nylll IPPN° I ; n 70 1 ` �%9SfR ROAD i ti '-F Piney Gr -- •r`—� _�• } ram•_`.' -�-ti�,���� . . �� Ooef �,p�L l / �f J �I O C \ VARD' JC 'e Bay Ga eentl BREWSTERBOULE 1 Camp Lejeune Main Gate .D�Pj 17 .I ,i T'• l 24 I 7 \ 1 1 BIRCH/ � �L-�- ��/-.. ..\ +`h^___-_''� i J SIREE I \. v SO AA l- jl (--�' Q•`, ._1.,i _.w s �iR�FR, \'\T \\\\i / Camp Leleune MC Basel \`J J\ Pro j ect Location `��� � .1 � /...(ram ��n �Y ,� : i � ` -i i`T-r�'• .��r \_: N�P-1 Y ��OeO i 1`% ! `7;\ `\ •-"f 1, 2„�f' �, d ���,Fj \ a `c f' Camp Lejeune South Gate �. T7 /ll / � �:�-ice^ /\ '�• �`a`f'` /--_J'- / Snead Ferry' ' j/i `I\`, Yk PROJECT SITE (_ — 1- Legend Vicinity Map PAVED 0 0.5 i 2 Miles ---- UNPAVED c USMCB Camp Lejeune, Gonzalez Road IiV ED Camp Lejeune MCB Onslow County, NC � JUL 0 1 ZI ii !by: 2 q 5 �U � � � CIVI PAVING LEG ND � =- E_ �A�o GINcgopNSTRUCT o `'Y �° WtTux"DaJ� '=.I, � Ew,En D.TTNK A: 104 .0� p � _ o� GE•r�CTURPAPIPE CEACLA SITE / DIiAMEEsr�r•PE9 iNor m Two N u O D� ,�EEr .D,r, TAN TANKTRAIL?� BIRCH STRE(,f G EDDD»<.ETZ SrtE� CV UNDWATER � ' i - � Or: li i 0 cnEErvwnr rruu 11 'PLUME `� IAI BLVD UM, (•X•) r- E ONtI RUCTION - c 1 END CONSTRUCTION U w yVp,.. -, TANK TRAIL 2 AECOM A.19i46 94 �'• •TT2•STA.49+46.82 NZALEL� - PG•► cpI I ev�a U o / �SNEADS FERRY ROAD Ei /I(�',S`EflAN0{3"�.,'I ,;,. "_��c 4Aa` � • � i�\� CL,! ' .��.., �L_, Igld B wETuxos �\�r END CONSTRUCTION 0•STA.Sf14hi �� C CERCIASSME (; OpQ�NjZALE2 BLVD - �C IN CpNs 10 1J �� E I y Q �STR � � a •0�•'STA-52+95A0� UGN4BLV ' 7 g G CT( 1`ANKAL � j / ' I� U 6f�IppCEZ BLVD '' LN e or a� pXTi NSION i" f ME E < ,' = GONZALEZ BLVD EXTENSION ^� _ GIi4PNILSLAIES �GP002 A\.1%cF V 1v� LJUL 0 1 2011 13 Y:�-- is Basin 1 Drainage Area Subcat Reach On Link Drainage Diagram for Gonzalez Road Basin t -Pre FHyd'j reped by{enter your company name here}, Printed 4/5/2011 Am 9.10 s/n 03551 02010 HydroCAD Software Solutions LLC Gonzalez Road Basin 1 - Pre Type // 24-hr 1 yr Rainfall=3.70" Prepared by {enter your company name here} Printed 4/5/2011 HydroCAD®9.10 s/n 03561 @ 2010 HydrOCAD Software Solutions LLC Paae 2 Summary for Subcatchment IS: Basin 1 Drainage Area Runoff = 0.01 cfs @ 13.30 hrs, Volume= 0.005 af, Depth= 0.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-30.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 24,000 45 24,000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (fUft) (ft/sec) (cfs) 29.7 300 0.0074 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 4.48" Subcatchment 1S: Basin 1 Drainage Area Hydrograph 0.009 9 Runofl 0.009 0.01 cfs Om8 Type II 24-hr 1 yr 0.007 0.007 Rainfall=3.70" 0.006 Runoff Area=24,000 sf 0.006 ff Volume=0.005 of 0.005 0.005 off Depth=0.12" 0.004 M OM4 gth=300' 0003 Slop 0.0074 '/' 0.002 T 29.7 min 0.002 0.001 C N=45 0.001 0.000 0 . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Time (hours( 1S Basin 1 Dra nage Area 2P Infiltration Basin 1 Subcat Reach on Link Drainage Diagram for Gonzalez Road Basin 1 •Post Prepared by{enter your company name here}, Printed 4/5/2011 HydroCADO 9.10 sln 03561 ©2010 HydroCAD Software Solutions LLC Gonzalez Road Basin 1 - Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by {enter your company name here} Printed 4/5/2011 HydroCAD@ 9.10 s/n 03561 @ 2010 HydroCAD Software Solutions LLC Page 2 Summary for Pond 2P: Infiltration Basin 1 Inflow Area = 0.551 ac, 53.80% Impervious, Inflow Depth = 1.38" for 1 yr event Inflow = 0.96 cfs @ 12.08 hrs, Volume= 0.063 of Outflow = 0.09 cfs @ 13.02 hrs, Volume= 0.063 af, Atten= 91%, Lag= 56.5 min Discarded = 0.09 cfs @ 13.02 hrs, Volume= 0.063 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 7.06' @ 13.02 hrs Surf.Area= 0,030 ac Storage= 0.027 of Plug-Flow detention time= 142.0 min calculated for 0.063 of(100% of inflow) Center-of-Mass det. time= 141.8 min ( 999.8 -858.1 ) Volume Invert Avail.Storage Storage Description #1 6.00' 0.107 of WNW W x 30.00'L x 3.00'H Prismatoid Z=3.0 Device Routing Invert Outlet Devices #1 Discarded 6.00' 2.063 Whir Exfiltration over Surface area Conductivity to Groundwater Elevation = 4.00' Discarded OutFlow Max=0.09 cfs @ 13.02 hrs HW=7.06' (Free Discharge) 1=Exfiltration ( Controls 0.09 cfs) Pond 2P: Infiltration Basin 1 Hydrograph ■Inflow 0.96 cfs ■Discarded Inflow Area=0.551 ac Peak Elev=7.06' Storage=0.027 of u 3 0 LL 0.09 cfs o _ . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hours) Uis Basin 2 Drainage Area Sutx at Reach on Link Drainage Diagram for Gonzalez Road Basin 2-Pre FH pared by{enter your company name here}. Printed 4/5/2011 droCAM 9.10 sin 03561 ®2010 HydroCAD Software Solutions LLC Gonzalez Road Basin 2 - Pre Type // 24-hr f yr Rainfall=3.70" Prepared by {enter your company name here} Printed 4/5/2011 HydroCAD@ 9.10 s/n 03561 @ 2010 HydrOCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: Basin 2 Drainage Area Runoff = 0.27 cfs @ 12.48 hrs, Volume= 0.039 af, Depth> 0.57" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 35,948 61 35,948 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 42.6 300 0.0030 0.12 Sheet Flow, Grass: Short n= 0.150 P2= 4.48" Subcatchment 1S: Basin 2 Drainage Area Hydrograph 0.3 ®Runoff 0.28 0.27 cfs 0.26 Type II 24-hr 1 yr 0.24 Rainfall=3.70" 0.22 Runoff Area=35,948 sf 0.2 Runoff Volume=0.039 of 0.18 0.16 Runoff Depth>0.57" 30 0.14 Flow Length=300' LL 00 2 Slope=0.0030 '/' 0.08 Tc=42.6 min 0.06 C N=61 0.04 0.02 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) i s Basin 2 Dra nage Area 2P Infiltration Basin 2 Subcat Reach on Link Drainage Diagram for Gonzalez Road Basin 2-Post Prepared by{enter your company name here}, Printed 4/5/2011 HydroCAD®9.10 s/n 03561 ®2010 HydroCAD Software Solutions LLC Gonzalez Road Basin 2 - Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by {enter your company name here} Printed 4/5/2011 HydroCAD®9.10 s/n 03561 ©2010 HydroCAD Software Solutions LLC Page 2 Summary for Pond 2P: Infiltration Basin 2 Inflow Area = 0.825 ac,100.00% Impervious, Inflow Depth = 3.47" for 1 yr event Inflow = 3.51 cfs @ 12.03 hrs, Volume= 0.238 of Outflow = 0.77 cfs @ 12.31 hrs, Volume= 0.238 af, Atten= 78%, Lag= 16.6 min Discarded = 0.77 cfs @ 12.31 hrs, Volume= 0.238 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 11.60' @ 12.31 hrs Surf.Area= 0.116 ac Storage= 0.066 of Plug-Flow detention time= 22.4 min calculated for 0.238 of(100% of inflow) Center-of-Mass det. time= 22.4 min ( 777.7- 755.3 ) Volume Invert Avail.Storage Storage Description #1 11.00, 0.248 of 65.00'W x 70.001 x 2.00'H Prismatoid Z=3.0 Device Routing Invert Outlet Devices #1 Discarded 11.00' 5.373 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 8.50' Discarded OutFlow Max=0.77 cfs @ 12.31 hrs HW=11.60' (Free Discharge) 1=Exfiltration ( Controls 0.77 cfs) Pond 2P: Infiltration Basin 2 Hydrograph ■Inflow 3.5 IMMscardedj Inflow Area=0.825 ac Peak Elev=11.60' 3 Storage=0.066 of m z 2 0 LL 1 0.77 cfs 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Time (hours( -14 BaB IN vw BmB 13 BaB Mk 1 BaB On 2 3 Mk Lid BMP Location BaB- Baymeade fine sand BaB BaB 45 BmB - Baymeade-Urban land complex BmB - 7 - KuB- Kureb fine sand _ u Ln -Leon fine sand ® Mac- Marvy loamy sand On ac f Mk-Muckalee loam NfC - Newhan fine sand On-Onslow loamy sand 1 O BaB - To-Torhunta fine sandy loam - Mk Ud-Udorthents Bab Ur- Urban land Ln Wo -Woodington loamy fine sand -12 11 BmB 0 w-water Client. Dale: Figure The LeJeune BMP Locations April 2011 Froehling & Robertson, Inc. scale w Cotena 310 Hubert Street USDA-NRCS Soils Map 0 500 1,000 Feet I I Grou Raleigh, NC 27603 P Job dnslowl County, North Carolina No 7478 1`14 b13 and Ksat13 .• ti• � •�,. � ' �\� sue . �^� 0Z�+ • J 1`. a !� �' BMP 1: .`'. : BMP 2: b3 and Ksat2 g K'T�f bt and Ksat1 �`.•� .� 1r- BMP 3: �.' T�"'�'� •1.+. + "�r� b5 and Ksat5 3 ; -. ` b4 and Ksat4 BMP 6: t_ �• 1'• .f�,ng = ��_ e: -r b6 and Ksat6 b9 and Ksat9 .. p BMP b8 and Ksat6 BMP 7: _ ,1 l? �• � � � 1► b7 antl Ksat7 BMP 10: b10 and Ksat- t Y ta;ii '• i 1, i. E BMP 12. , v BMP 11: F • Ksat and Soil Boring 1 b12 and Ksat121 ^ b11 and Ksat11 e9 O Soil Boring Only Client. Date. Figure The LeJeune BMP Locations April 2011 Froe31 & Robertson, Inc. Scale Catena 0 0 /� 1 Hubert Street sao 1,000 reelL) Group Raleigh, NC 27603 � Onslow County, North Carolina Job I No 7478 s ,i 200 600 0 1,200 Feet � Ja'II 'Onviii/ SPIPPN�R1JX BG 70 1 'S i kV°2ASER ROOAD ticCo �F� Piney Gr ZO la Bay a Lel� etb' BREwSTER BOULEVARD _ i1 y N n Camp Lejeune Main Gate 17 Y L y Z w STREET BIRCH I L G O I IqR. "temp Leleune MC 7LER i Project Location r� b �fP ro 17 c PO ON s� b ', Ott Camp Lejeune South Gate p f r, I I PROJECT SITE Sneads Ferry i M aa �4fVAFo Legend Vicinity Map PAVED 0 0.5 1 2 Miles _ —com USMCB Camp Lejeune, Gonzalez Road UNPAVED ///Q'—"—_ Camp Lejeune MCB Onslow County, NC �A�fP 1 y q • �. aypF- 1 5 r<"✓ e 'S Y .Cb J ns 1t 1, ! -r Legend Wetlands and DWQ Site Layout Existing Roads —DWO Named Streams —PAVED Classification Map Unnamed Tributaries UNPAVED USMCB Camp Lejeune, Gonzalez Road Welland Addition.2a08 m SWUM Area HOW /� �/+O� Camp Lejeune Marine Corps Base I _UPLAND ®ShellNsh Area ORW AZ Onslow County, North Carolina WETLAND 0 500 1,000 2,000 Feet I I I I I I I 1 inch =740.344891 feet 011�1 / 1 ai In Nil I d 1 MEN �� �`► l� 'AIM ,, Il �r`m �r ���� 1 �� � � ter,,- MINK �'•*ti��i,, PAVED USA Topo Maps US Topo Map USIVICB Camp Lejeune, Gonzalez '•.. • On wo ., V ! Bm6� ft / mil.• � _ J ' \\ / � �, / 1 "' INN ' a "1 MaC , ,✓/ I f i"- , � . v, i 1 /�.'—� i /ice�/ \�•�__ i Bm6 \\ k'---------- \ '`e✓s — i it BaB\`� / KuB N IN MaC k Mk MaClr \� BMB I BaBCamp Lejeune Marine Corps Soils Map USMCB Camp Lejeune, Gonzalez Road Base Onslow County, North 150300 600