Loading...
HomeMy WebLinkAboutSW8080128_COMPLIANCE_20100319 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 Oka 12g DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE © COMPLIANCE EVALUATION INSPECTION DOC DATE ZOlO O3 X�j YYYYMMDD Compliance Inspection Report Permit: SW8080128 Effective: 06/26/08 Expiration: 06/26/18 Owner: Petroleum Fuel&Terminal Company Subsidiary of Apex Oil Project: Apex Oil Tank Expansion County: New Hanover 3329 River Rd Region: Wilmington Wilmington NC 28412 Contact Person: Ken Fenton Title: Phone: 314-889-9610 Directions to Project: Site is south of the intersection of Shipyard Blvd.and River Road near the State Port Authority. Type of Project: State Stormwater-HD-Infiltration Drain Areas: 1 -(CAPE FEAR RIVER)(03-06-17 )(SC) 2-(CAPE FEAR RIVER)(03-06-17 )(SC) On-Site Representative(s): Related Permits: Inspection Date: 03/19/2010 Entry Time: 10:15 AM Exit Time: 11:15 AM Primary Inspector: Angela K Hammers Phone:919-796-7215 Secondary Inspector(s): Ext.7317 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: State Stormwater Facility Status: ❑Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Page: 1 Permit: SW8080128 Owner-Project:Petroleum Fuel&Terminal Company Subsidiary of Apex Oil Inspection Date: 03/19/2010 Inspection Type:Compliance Evaluation Reason for Visit:Routine Inspection Summary: Observations of this site: 1.three tanks were in stages of welding and construction without roofs installed 2. all other areas within the site have been filled with sand 3.the infiltration basins are staked off, but not yet constructed/connected. It is recommended that temporary stormwater measures be utilized prior to connection of the infiltration basins to treat any stormwater from the site. It was noted with the site superintendent to contact DWQ prior to connection of the infiltration basins for a site visit. Please call 910-796-7215 with any questions. Thank you. File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? ❑ ■ ❑ ❑ Signed copy of the Operation&Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ■ ❑ Comment: Stormwater system not yet installed. PE required upon completion of construction. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ❑ ❑ ❑ ■ Are the inlets located per the approved plans? ❑ ❑ ❑ ■ Are the outlet structures located per the approved plans? Cl ❑ ❑ ■ Comment: Inf basins staked off, not yet constructed. Temporary measures for stormwater treatment prior to construction/connection of basins are recommended. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ ■ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■ upon request? - Comment: Page: 2