HomeMy WebLinkAboutSW8040301_HISTORICAL FILE_20050420 STORMWATER DIVISION CODING SHEET
POST-CONSTRUCTION PERMITS
PERMIT NO. SW8
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE w (9*1"40
YYYYMMDD
�OF W ATF19 Michael F. Easley, Governor
�O G William G. Ross, Jr., Secretary
7 North Carolina Department of Environment and Natural Resources
� 1
Y Alan W. Klimek, P.E. Director
Division of Water Quality
April 20, 2005
Mr. John O. Stevenson, Manager
Shellooth Properties, LLC
781 West Fire Tower Road
Swansboro, NC 28584
Subject: Approved Plan Revision
Stevenson Toyota
Stormwater Project No. SW8 040301
Onslow County
Dear Mr. Stevenson:
On February 17, 2005, the Wilmington Regional Office received a plan revision for Stormwater
Management Permit Number SW8 040301. The revisions include the deletion of the
previously approved bridge crossing connecting the existing project with the new parking lot,
and replacing it with 40' of double 72" aluminum culverts. It has been determined that a formal
permit modification is not required for the proposed changes. We are forwarding you an
approved copy of the revised plans for your files. Please replace the old approved plan
sheet(s) with the new one(s).
Please be aware that all terms and conditions of the permit issued on March 3, 2004,
remain in full force and effect. Please also understand that the approval of this revision to
the approved plans for the subject State Stormwater Permit is done on .a case-by-case
basis. Any other changes to this project must be approved through this Office prior to
construction. The issuance of this plan revision does not preclude the permittee from
complying with all other applicable statutes, rules, regulations or ordinances which may
have jurisdiction over the proposed activity, and obtaining a permit or approval prior to
construction.
If you have any questions concerning this matter, please do not hesitate to call me at (910)
395-3900.
Sincerely,
Linda Lewis
Environmental Engineer
ENB\arl: S:\WQS\STORMWAT\REVISION\040301.apr05
cc: Howard Resnick, P.E. Coastal Site Design
inspector, Onslow County Building Inspections
Linda Lewis
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone(910)395-3900 Customer Services-877-623-6748 One
Tf One
Wilmington Regional Office Wilmington,NC 28405-3845 FAX (919)733-2496 Internet: h2o.enr.state.nc.us C3rOtt➢a
An Equal Opportunity/Affirmative Action Employer—50%Recycledll0%Post Consumer Paper Naturally
•
COASTAL SITE DESIGN
PC Box 4041
Wilmington, NC 28406
Phone/Fax:910 791-4441
TRANSMITTAL
To: Linda Lewis From: Howard Resnik, PE
Company:NCDENR/DWQ Date: February 14, 2005
Re: Stevenson Toyota - SW8 040301 CC: -
❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle
-Comments: Linda, Enclosed please find one copy of the construction drawings for the referenced project.
Let me know if you need anything else
Howard
CE. V
17 i0C?.ti
BY:
Re: Stevenson Toyota Plan Revision SW8 040301
. • _ l
Subject: Re: Stevenson Toyota Plan Revision SW8 040301
From: Linda Lewis <Linda.Lewis@ncmail.net>
Date: Fri, 11 Feb 2005 15:48:42 -0500
To: Howard Resnik <howard@coastalsitedesign.com>
Howard:
Yes, I ' ll accept a copy of the construction drawings with the pump
station and force main shown. I don' t want to make you redraw the
plans, I was just looking for more detail than what Laurie approved.
From the drawing she approved, I can' t tell how runoff is supposed
to get to the pond, and I think it ' s very important that this be
clear.
Linda
Howard Resnik wrote :
Linda,
There is no swale that directs water to the pond .
This project utilizes an
underground storage pipe , stormwater pump station &
force main to get water
to the existing pond . The pipes you are speaking of
are emergency overflow
pipes from the pump station wet well .
The plans I submitted to you are virtually the same
plans approved, with a
different title block . As I mentioned in my cover
letter, the only thing
that has changed is the installation of a culvert
crossing instead of a
bridge .
I will be happy to meet with you to clear up any
concerns you have . Maybe a
set of the construction drawings will clear things
up? ? They have plan and
profile drawings detailing the force main &
underground reservoir, in
addition to a grading plan, details & separate
existing topo sheet . I have
I of 2/11/20054:00 PM
Re: Stevenson Toyota Plan Revision SW8 040301
a bit of a problem with creating a whole new plan for
an approved project ,
when the revised plans match the old plans entirely,
other than the items I
mentioned .
Please let me know how you would like to proceed .
Howard Resnik , PE
Coastal Site Design
PO Box 4041
Wilmington, NC 28406
voice/fax ( 910 ) 791-4441
www . coastalsitedesign . com
- - - - - Original Message - - - - - From : "Linda Lewis "
<Linda . Lewis@ncmail . net>
To : "Howard Resnik" <howard@coastalsitedesign . com>
Sent : Friday, February 11 , 2005 11 : 53 AM
Subject : Stevenson Toyota Plan Revision SW8 040301
Howard :
I know you did the original design while working
for HDS , but I looked
at the plan that Laurie approved in March, 2004 and
I have one real
concern . The inlets that supposedly transport the
runoff from the new
parking area appear to empty into a pipe that
discharges directly into
Mill Creek . The drawing is so overlayed with
information and thick black
lines in this area , that I am unable to say for
sure how this piping is
connected to the swale which directs all runoff
into the pond .
2 of 3 2/11/2005 4:00 PM
Re: Stevenson Toyota Plan Revision SW8 040301
Can you provide a clearer, larger inset of this
area, indicating how the
piping is connected so that it gets into the pond?
Thanks ,
Linda
3 of 3 2/11/2005 4:00 PM
•
COASTAL SITE DESIGN
PO Box 4041
Wilmington, NC 28406
Phone/Fax:910 791-4441
February 4, 2005
Linda Lewis \
Environmental Engineer
N.C. Department of Environment
And Natural Resources
Division of Water Quality
127 Cardinal Drive Extension
Wilmington,NC 28405
Re: Stormwater Management Permit for
Stevenson Toyota-Jacksonville
Onslow County
CSD Project No. 04-0027
Dear Linda,
Enclosed please find two(2) copes of the revised plans for the referenced project. As I mentioned in my email last week,
the bridge crossing has been replaced with a twin 72"culvert crossing. There have been no other changes to the
stormwater management plan.
Please note that Coastal Site Design is now the Engineering Firm on record for this project(no longer Hanover Design
Services, PA). Please forward any correspondence or copied correspondence to the address on this letterhead.
Thank you for your assistance in this matter. Please.call if you require any additional information.
Very truly yours,
Howard Resnik, P.E.
Encl.: As noted above
cc: Barden Lanier, PLS
RECEIVED
FEB 0 4 Z005
sy3
WET DETENTION POND ANALYSIS
FILE NAME: SAWQS\POND\900506.mar04.xls
PROOJECT#: SW8 900506.mar04 REVIEWER: Munn
PROJECT NAME: John O. Stevenson Hyundai Jeep DATE: 04-Mar-04
Receiving Stream: Mill Creek Class: SC NSW
Drainage Basin: White Oak Index No. 10.00
Site Area 11,60 acres
Drainage Area 50529600 square feet Area in Acres 11.60
IMPERVIOUS AREAS Rational C
Total Imp 419396.00 square feet
square feet
square feet
square feet
square feet
square feet
TOTAL 41,9396.00! square feet Rational Cc= 0.03
SURFACE AREA CALCULATION
% IMPERVIOUS 83.00% SA/DA Ratio 1.79%
Des. Depth 7.5 Req. SA 9045 sf
TSS: 85 Prov. SA 11702 '. sf
VOLUME CALCULATION ' place a "1" in the box if Rational is used
Rational ?" FO
Des. Storm 1:00' inches Perm.m. Pool Volume=
Rv= 0.797 Req. Forebay Volume= 0
Bottom 26.4 msl Provided Volume=
Perm. Pool 33'901; msl Percent= #DIV/C! `
Design Pool 37 msl
Storage met @elev 36.22 msl Elevation Area Inc. Vol. Acc. Vol.
Req. Volume 33560: cf 33.90 11702.00
Vol. Prov. at DP 4y868 cf 37.00 17245.00 44867.85 44867.85
ORIFICE CALCULATION
Avg. Head = 1,51 ft Q2 Area = 4.72 sq. inches
Flow Q2, cfs 0.194 cfs Q5 Area = 1.89 sq. inches
Flow Q5, cfs 0.078 cfs Orifice Area 2.41 sq. inches
No. of Orifices 1 Q= 0,099 cfs
Diameter, inches 1 75, weir H x W „ in x in
Drawdown = 3.9 days Surface Area @DP = 17245 sq. ft.
Falling Head Drawdown = 7.3 days
COMMENTS
Surface Area , V lume and Orifice are within Design Guidelines
` the rxc� r jwg 90050( js a p �vjltm /may q. 2Z ava , `J
a p roomed AaMT;1�
-area. 45 ��. � a4es. us leas &Pna.ce,
a. � Ct - ..sw_g=OV0070l ust 3 7 acmes,