Loading...
HomeMy WebLinkAboutSW8040301_HISTORICAL FILE_20050420 STORMWATER DIVISION CODING SHEET POST-CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE w (9*1"40 YYYYMMDD �OF W ATF19 Michael F. Easley, Governor �O G William G. Ross, Jr., Secretary 7 North Carolina Department of Environment and Natural Resources � 1 Y Alan W. Klimek, P.E. Director Division of Water Quality April 20, 2005 Mr. John O. Stevenson, Manager Shellooth Properties, LLC 781 West Fire Tower Road Swansboro, NC 28584 Subject: Approved Plan Revision Stevenson Toyota Stormwater Project No. SW8 040301 Onslow County Dear Mr. Stevenson: On February 17, 2005, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 040301. The revisions include the deletion of the previously approved bridge crossing connecting the existing project with the new parking lot, and replacing it with 40' of double 72" aluminum culverts. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please replace the old approved plan sheet(s) with the new one(s). Please be aware that all terms and conditions of the permit issued on March 3, 2004, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on .a case-by-case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 395-3900. Sincerely, Linda Lewis Environmental Engineer ENB\arl: S:\WQS\STORMWAT\REVISION\040301.apr05 cc: Howard Resnick, P.E. Coastal Site Design inspector, Onslow County Building Inspections Linda Lewis Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone(910)395-3900 Customer Services-877-623-6748 One Tf One Wilmington Regional Office Wilmington,NC 28405-3845 FAX (919)733-2496 Internet: h2o.enr.state.nc.us C3rOtt➢a An Equal Opportunity/Affirmative Action Employer—50%Recycledll0%Post Consumer Paper Naturally • COASTAL SITE DESIGN PC Box 4041 Wilmington, NC 28406 Phone/Fax:910 791-4441 TRANSMITTAL To: Linda Lewis From: Howard Resnik, PE Company:NCDENR/DWQ Date: February 14, 2005 Re: Stevenson Toyota - SW8 040301 CC: - ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle -Comments: Linda, Enclosed please find one copy of the construction drawings for the referenced project. Let me know if you need anything else Howard CE. V 17 i0C?.ti BY: Re: Stevenson Toyota Plan Revision SW8 040301 . • _ l Subject: Re: Stevenson Toyota Plan Revision SW8 040301 From: Linda Lewis <Linda.Lewis@ncmail.net> Date: Fri, 11 Feb 2005 15:48:42 -0500 To: Howard Resnik <howard@coastalsitedesign.com> Howard: Yes, I ' ll accept a copy of the construction drawings with the pump station and force main shown. I don' t want to make you redraw the plans, I was just looking for more detail than what Laurie approved. From the drawing she approved, I can' t tell how runoff is supposed to get to the pond, and I think it ' s very important that this be clear. Linda Howard Resnik wrote : Linda, There is no swale that directs water to the pond . This project utilizes an underground storage pipe , stormwater pump station & force main to get water to the existing pond . The pipes you are speaking of are emergency overflow pipes from the pump station wet well . The plans I submitted to you are virtually the same plans approved, with a different title block . As I mentioned in my cover letter, the only thing that has changed is the installation of a culvert crossing instead of a bridge . I will be happy to meet with you to clear up any concerns you have . Maybe a set of the construction drawings will clear things up? ? They have plan and profile drawings detailing the force main & underground reservoir, in addition to a grading plan, details & separate existing topo sheet . I have I of 2/11/20054:00 PM Re: Stevenson Toyota Plan Revision SW8 040301 a bit of a problem with creating a whole new plan for an approved project , when the revised plans match the old plans entirely, other than the items I mentioned . Please let me know how you would like to proceed . Howard Resnik , PE Coastal Site Design PO Box 4041 Wilmington, NC 28406 voice/fax ( 910 ) 791-4441 www . coastalsitedesign . com - - - - - Original Message - - - - - From : "Linda Lewis " <Linda . Lewis@ncmail . net> To : "Howard Resnik" <howard@coastalsitedesign . com> Sent : Friday, February 11 , 2005 11 : 53 AM Subject : Stevenson Toyota Plan Revision SW8 040301 Howard : I know you did the original design while working for HDS , but I looked at the plan that Laurie approved in March, 2004 and I have one real concern . The inlets that supposedly transport the runoff from the new parking area appear to empty into a pipe that discharges directly into Mill Creek . The drawing is so overlayed with information and thick black lines in this area , that I am unable to say for sure how this piping is connected to the swale which directs all runoff into the pond . 2 of 3 2/11/2005 4:00 PM Re: Stevenson Toyota Plan Revision SW8 040301 Can you provide a clearer, larger inset of this area, indicating how the piping is connected so that it gets into the pond? Thanks , Linda 3 of 3 2/11/2005 4:00 PM • COASTAL SITE DESIGN PO Box 4041 Wilmington, NC 28406 Phone/Fax:910 791-4441 February 4, 2005 Linda Lewis \ Environmental Engineer N.C. Department of Environment And Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington,NC 28405 Re: Stormwater Management Permit for Stevenson Toyota-Jacksonville Onslow County CSD Project No. 04-0027 Dear Linda, Enclosed please find two(2) copes of the revised plans for the referenced project. As I mentioned in my email last week, the bridge crossing has been replaced with a twin 72"culvert crossing. There have been no other changes to the stormwater management plan. Please note that Coastal Site Design is now the Engineering Firm on record for this project(no longer Hanover Design Services, PA). Please forward any correspondence or copied correspondence to the address on this letterhead. Thank you for your assistance in this matter. Please.call if you require any additional information. Very truly yours, Howard Resnik, P.E. Encl.: As noted above cc: Barden Lanier, PLS RECEIVED FEB 0 4 Z005 sy3 WET DETENTION POND ANALYSIS FILE NAME: SAWQS\POND\900506.mar04.xls PROOJECT#: SW8 900506.mar04 REVIEWER: Munn PROJECT NAME: John O. Stevenson Hyundai Jeep DATE: 04-Mar-04 Receiving Stream: Mill Creek Class: SC NSW Drainage Basin: White Oak Index No. 10.00 Site Area 11,60 acres Drainage Area 50529600 square feet Area in Acres 11.60 IMPERVIOUS AREAS Rational C Total Imp 419396.00 square feet square feet square feet square feet square feet square feet TOTAL 41,9396.00! square feet Rational Cc= 0.03 SURFACE AREA CALCULATION % IMPERVIOUS 83.00% SA/DA Ratio 1.79% Des. Depth 7.5 Req. SA 9045 sf TSS: 85 Prov. SA 11702 '. sf VOLUME CALCULATION ' place a "1" in the box if Rational is used Rational ?" FO Des. Storm 1:00' inches Perm.m. Pool Volume= Rv= 0.797 Req. Forebay Volume= 0 Bottom 26.4 msl Provided Volume= Perm. Pool 33'901; msl Percent= #DIV/C! ` Design Pool 37 msl Storage met @elev 36.22 msl Elevation Area Inc. Vol. Acc. Vol. Req. Volume 33560: cf 33.90 11702.00 Vol. Prov. at DP 4y868 cf 37.00 17245.00 44867.85 44867.85 ORIFICE CALCULATION Avg. Head = 1,51 ft Q2 Area = 4.72 sq. inches Flow Q2, cfs 0.194 cfs Q5 Area = 1.89 sq. inches Flow Q5, cfs 0.078 cfs Orifice Area 2.41 sq. inches No. of Orifices 1 Q= 0,099 cfs Diameter, inches 1 75, weir H x W „ in x in Drawdown = 3.9 days Surface Area @DP = 17245 sq. ft. Falling Head Drawdown = 7.3 days COMMENTS Surface Area , V lume and Orifice are within Design Guidelines ` the rxc� r jwg 90050( js a p �vjltm /may q. 2Z ava , `J a p roomed AaMT;1� -area. 45 ��. � a4es. us leas &Pna.ce, a. � Ct - ..sw_g=OV0070l ust 3 7 acmes,