Loading...
HomeMy WebLinkAboutNCG070175_Compliance Evaluation Inspection_20240522 Compliance Inspection Report Permit:NCG070175 Effective: 06/01/23 Expiration: 05/31/28 Owner: Gold Bond Building Products LLC SOC: Effective: Expiration: Facility: Gold Bond Buildng Products-Mount Holly Plar County: Gaston 1725 Drywall Dr Region: Mooresville Mount Holly NC 28120 Contact Person:Rick Smith Title: Phone: 704-398-3900 Directions to Facility: The site is located on Highway 273 to the east of Wester Road. System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 05/22/2024 Entry Time 11:OOAM Exit Time: 01:20PM Primary Inspector:Jerry W Eplin Phone: 704-663-1699 Secondary Inspector(s): Kathryn S Peterson William Baummer Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 4 Permit: NCG070175 Owner-Facility:Gold Bond Building Products LLC Inspection Date: 05/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: A compliance evaluation inspection was conducted at the facility. Adam Lynch and Mike Thompson were present representing the facility. Review of the Stormwater Pollution Prevention Plan (SWPPP)was last documented in November of 2021. Review of the SWPPP is required annually. The SWPPP contains a site map however it was not clear that all storm drains travel to one of the facilitys known outfalls. Facility personnel also could not verify that roof drainage reaches one of the known outfalls. The SWPPP contains a Good Housekeeping section, however houskeeping at the facility should be improved. Powdery material was observed outside of roll up doors and coating much of the roadways internal to the facility. The facility operates a street sweeper to minimize this issue. The SWPPP does not have a Solvent Management Plan section. This is a requirement of the permit. Illicit(non-stormwater)discharge monitoring has not occurred. Illicit discharge monitoring is required annually. Analytical monitoring has not occurred. Analytical monitoring is required at each outfall on a quarterly basis. The facility has not registered to submit discharge monitoring reports via a-DMR. The facility receives dry material (gypsum) by truck and the trucks are required to go through a tire wash prior to exiting the facility. This is listed as one of the stormwater Best Management Practices. NC DEQ received a complaint about trucks dropping material onto the nearby roadways. At the time of this inspection, the tire wash was not operational. Facility personnel indicated that the tire wash is currently being repaired/replaced and that the existing tire wash collapsed. No firm date for when the tire wash would be active again was available. Facility personnel speculated that it would be operational soon. The outfalls were observed during this inspection. Two of the outfalls were slightly difficult to access due to overgrowth of weeds and bushes. Clear access to the outfalls should be maintained. Page 2 of 4 Permit: NCG070175 Owner-Facility:Gold Bond Building Products LLC Inspection Date: 05/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The facility has not prepared a Solvent Management Plan section for the Stormwater Pollution Prevention Plan (SWPPP), as is required by the permit. A site map was included in the SWPPP, however it was not clear that all stormdrains within the facility reach a known outfall. Furthermore, facility personnel could not verify whether roof drain discharge reaches a known outfall. The SWPPP contains a Good Houskeeping section, however housekeeping at the facility should be improved. Powdery material was observed outside of roll up doors an coated much of the internal roadways. The facility operates a street sweeper to minimice this issue. Review of the SWPPP was last documented in November 2021. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring was last documented in February 2024 and had been completed semi-annually prior to that. This is a reminder that the renewed permit now requires quarterly Qualitative Monitoring. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Page 3 of 4 Permit: NCG070175 Owner-Facility:Gold Bond Building Products LLC Inspection Date: 05/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Comment: The facility has not completed Analytical Monitoring. The permit requires quarterly analytical monitoring starting with the first quarter of 2024. Therefore, the first quarter's required sampling event was missed. Facility has not registered to submit discharge monitoring reports with a-DMR. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: The required annual illicit (non-stormwater) discharge evaluations have not been completed. Page 4 of 4