Loading...
HomeMy WebLinkAboutNCC221324_NOT Closeout Documents_20240528 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Forsyth Project: Winston-Salem CNI Phase 1 River basin: Yadkin-PeeDee Person financially responsible:Housing Authority of Winston-Salem-Kevin Project#: FORSY-2022-016 Cheshire,Executive Director Address: 500 W.Fourth St.,Suite 300,Winston-Salem,NC 1. Project Location: Highland Ave.,Winston-Salem Pictures: No 2. Weather and soil conditions: 70's,Clear,Workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: April 05,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact me at seth.towne@deq.nc.gov. Reported by: Seth Towne Others present: Date of inspection: April 03,2024 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM CC: