HomeMy WebLinkAboutNCC241471_ESC Approval Submitted_20240529 ROY COOPER a"`srArE 4
MYb,�
Governor •.
ELIZABETH S.BISER ; erxtZ0
Secretary st'
M1Vt ',A�p
WILLIAM E.TOBY VINSON,JR.
Interim Director NORTH CAROLINA
Environmental Quality
February 28, 2024
LETTER OF APPROVAL
Duke Energy Carolinas, LLC
Attention: David Dellario, GM CCP Project Management
525 South Tryon Street
Charlotte,North Carolina 28202
RE: Project Name: Marshall Soil Borrow Area 3 E&SC Plan
Acres Approved: 66.0
Project ID: CATAW-2024-0100
County: Catawba, City: Terrell
Address: 8320 NC Hwy 150
River Basin: Catawba
Stream Classification: Other
Submitted By: Chad Brown, PE, WSP USA environment& Infrastructure, Inc.
Date Received by LQS: February 14, 2024
Plan Type: Revised
Dear Mr. Dellario:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan shall expire three (3) years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions
for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party
must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file
at the job site:
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
704-663-1699
Letter of Approval
Duke Energy Carolinas, LLC
February 28, 2024
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notified this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
c.57 2o�cZeo,rea2e7
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
c: Inspection Department
ec: Chad Brown, PE