Loading...
HomeMy WebLinkAbout20151335 Ver 1_Email_20160208Wanucha, Dave From: Wanucha, Dave Sent: Monday, February 08, 201610;46 AM To: Braquet, Stephanie; John,T,Thomas,JR@usace,army,mi Cc: Hedrick, Kevin R Subject: RE; Payne Road Hi Stephanie, I do not need to meet on this proje�t, Please ensure that NPDES requirements are implemented per your usual proto�oL I'll s�hedule a site inspe�tion visit in a From: Braquet, Stephanie Sent: Tuesday, February 02, 2016 9:06 AM To: John,T,Thocnas,JR@usa�e,arcny,cnil; Wanu�ha, Dave <dave,wanu�ha@n�denr,gov> Cc: Hedri�k, Kevin R <krhedri�k@n�dot,gov> Subject: FW: Payne Road I need to s�hedule an environmental pre��onstru�tion meeting for the above�mentioned proje�t in Forsyth County, It was permitted under a NW 14 and �orresponding GC 3886, It is a pipe repla�ement with widening and paving of a gravel road, If you would like to attend, please let me know what dates you have available, If you are unable to attend, please let me know and also let me know if there is anything in particular you would like for me to mention, Thanks and have a great day, ° �r � DIUISION ENUIRONMEN�iALSPECIALIST Division ofi Hi�hwaVs—Division Nine (336� 747-7$�0 From: Nedrick, Kevin R Sent: Tuesday, February 02, 2016 8;59 AM To: Braquet, Stephanie Cc. Logan, Adrian S Subject: RE; Payne Road We would like to get started as soon as weather allows, Please go ahead and s�hedule a meeting with the CORP and DWQ so that we �an install pipe in this permit, Cutting trees on the road and installing the permitted pipe is going to be our first phase of �onstru�tion, Thanks, Adrian and I are available the next few weeks for the most part after this week, Thanks, � From: Braquet, Stephanie Sent: Monday, January 25, 201611;46 AM To: Nedrick, Kevin R Cc. Logan, Adrian S; Rhyne, John P Subject: Payne Road Atta�hed please find the approved 404 �USACE) and 401 �NCDEQ-DWR) percnits for the above-cnentioned road, Please go over your percnit �onditions so you' know what you �an and �annot do on the proje�t based on those �onditions, We will need to s�hedule an environcnental pre-�onstru�tion cneeting on-site with the above agen�ies bef ore any work �an begin, Please let cne know asap when you would like to start so I �an s�hedule this cneeting, Thanks and if you have any questions, please feel free to �onta�t cne, ° �r � DIUISION ENUIRONMEN�iALSPECIALIST Division ofi Hi�hwaVs—Division Nine (336� 747-7$�0 Illki��i�il �oi�i�ospoi��ei°�ao �Co �i°�d �fi�oi��i �Cl�is woi°�doi� Is wublea�C �Co �Cl�o IV C� I':��'ubIIG I��oaoi�ds I.�N� �i°�d i��i�y bo dls�lose� �Co �Cl�li�d p�i��Clos�