Loading...
HomeMy WebLinkAboutNCC223794_MODIFICATION Supporting Documents_20240528 ROY COOPER 41, GovernorF +� % n� 0. ELIZABETH S.BISER Secretary wM,`,4# WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Environmental Quality Interim Director May 12, 2024 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Edward Pigott, Site Vice President McGuire Nuclear Station 13225 McGuire Nuclear Station Road Huntersville,North Carolina 28078 RE: Project Name: McGuire Landfill #1 Closure Project ID: MECKL-2023-009 (Revised) Acres Approved: Revised to 32.1 County: Mecklenburg City: Huntersville Location: Cashion Road River Basin: Catawba Stream Classification: Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: April 30, 2024 Plan Type: Revised Dear Mr. Pigott: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 tow \ 704-235-2100 Letter of Approval with Modifications Duke Energy Carolinas, LLC May 2024 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, DocuSigned by. skid o t , ka ti vitirt, '—A C FA8 B 7 E C 14A463... Michael Maclntyre, PE Assistant Regional Engineer Land Quality Section MM Enclosure: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet c: S&ME Attention: Chris Stahl 2016 Ayrsley Town Blvd., Suite 2-A Charlotte,North Carolina 28273 North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources •;�/� Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-235-2100 Letter of Approval with Modifications Duke Energy Carolinas, LLC May 2024 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: McGuire Landfill#1 Closure Project ID: MECKL-2023-009 (Revised) County: Mecklenburg Reviewed by: Michael Maclntyre, PE 1. The drainage area for the new proposed disturbed area on the eastern side of the stream should have at least one more break into smaller drainage areas. J-hooks and silt fence outlets are recommended along the silt fence on the northern side of this area. 2. The proposed compost area is larger than one acre. No one erosion measure is supposed to capture more than one acre of drainage area. Based on the grades in this area,j-hooks are other diversions should be employed to ensure that the compost filter socks act independently and have their own drainage areas. 3. Additional measures may be required- The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities �k ) North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources ftwi Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 704-235-2100