Loading...
HomeMy WebLinkAboutNCC241620_Site Plan or Location Map_20240528 DoneSign Envelope ID:EDADFEFC-E17E-4516-BA59-1ED2805/2554D DUKE ,,, ---1 .,.,,,,- ENERGY® 7---- -.OZ �S, „, _____ PROGRESS g A, \ U 1. HILL CREST 230KV SUBSTATION y 4805 US 15-501 HWY, CARTHAGE, MOORE COUNTY, NC 28327 TOWN OF CARTHAGE SITE PLAN LOCATION MAP DEP PROJECT NO: E21007301 1G=2,500' LATITUDE: 35.316775 GENERAL NOTES: PROJECT INFORMATION LONGITUDE: -79.411652 FIELD SURVEY PERFORMED BY ESP ASSOCIATES,INC.,SURVEYED SEPTEMBER 7 THROUGH SEPTEMBER 28, 2022,CERTIFIED ON OCTOBER 27,2022.REFERENCE DATUM IS NAD 1983/NSRS 2011(US SURVEY FEET)/ NAVD88. 2. ALL MATERIALS,CONSTRUCTION,WORKMANSHIP SHALL MEET DUKE ENERGY PROGRESS,LLC(DEP) DUKE ENERGY PROGRESS,LLC p^ SPECIFICATIONS,STANDARDS AND DESIGN. LANDOWNER 411 FAYETTEVILLE ST -1, - 3. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE"MANUAL OF ACCIDENT RALEIGH,NC 27601 , PREVENTION IN CONSTRUCTION"ISSUED BY AGC OF AMERICA,INC.,AND THE SAFETY AND HEALTH C9� REGULATIONS FOR CONSTRUCTION ISSUED BY THE U.S.DEPARTMENT OF LABOR. `T 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY EXISTING PAVEMENT OR EXISTING DEWBERRY ENGINEERS INC. UTILITIES THAT ARE DAMAGED DUE TO CONSTRUCTION ACTIVITY. ENGINEER 2610 WYCLIFF ROAD,SUITE 410 5. DO NOT POUR ANY CONCRETE BEFORE FORMS ARE INSPECTED AND APPROVED BY THE PROJECT RALEIGH,NC 27607 ENGINEER.FAILURE TO DO SO MAY CONSTITUTE REMOVAL OF WORK PERFORMED AT CONTRACTOR'S COST PH:919.881.9939 T UNTIL MADE SATISFACTORY BY THE ENGINEER. 6. CONTRACTOR IS REQUIRED TO REDLINE ANY FIELD CHANGES ON DRAWINGS UPON COMPLETION OF ESP ASSOCIATES,INC. Zm CONSTRUCTION.NOTE ANY DEVIATIONS FROM THE ORIGINAL PLANS.PLANS ARE TO REFLECT THE ACTUAL SURVEYOR 7011 ALBERT PICK RD,SUITE E /. LOCATION AND MATERIALS. GREENSBORO,NC 27409 'PA � PH:336.334.7724 ' WESTVIEW RD. EARTHWORK/EROSION: PARCEL ID 20220740 7. SITE DISTURBANCE IS MORE THAN 1 ACRE THEREFORE AN EROSION CONTROL PERMIT WILL BE OBTAINED. ALL ADDITIONAL EROSION CONTROL ITEMS THAT ARE INSTALLED THAT ARE NOT SHOWN ON THE PLANS, DEED BOOK AND PAGE fri PIN: 857700704307 K SHALL BE APPROVED BY THE LOCAL AGENCY OR DEP REPRESENTATIVE BEFORE INSTALLING IN ORDER TO D.B.5945,PG.404 NUMBER to APPROVE FOR PAYMENT.ITEMS NOT APPROVED WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. TOWN OF CARTHAGE CD 8. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH NCGO1 GROUND STABILIZATION JURISDICTION sr SITE ZONING RA-40/HCD ti REQUIREMENTS. K 9. THE LOCATION OF THE TOPSOIL STOCKPILE SHALL BE COORDINATED WITH DEP REPRESENTATIVE. U 10. ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF OFF-SITE IN A STATE PERMITTED LANDFILL. TOTAL ACREAGE OF 25.87 AC y 11. UNLESS NOTED OTHERWISE,ALL TREES NOT MARKED TO BE REMOVED ARE NOT TO BE DISTURBED.THEY PARCEL AREA �Q ARE S BE PROTECTED FROM DAMAGE BY EQUIPMENT DURING CONSTRUCTION. ACREAGE OF LAND TO BE 19.72 AC(859003 SF) i 4, ENVIRONMENTAL: DISTURBED 12. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE.THE SITE LIES WITHIN AN AREA OF EXISTING IMPERVIOUS PROJECT LOCATION AREA(LOT COVERAGE) 0.029 AC(1283 SF) MINIMAL FLOOD HAZARD(ZONE X)AS REFERENCED PER FEMA(PANEL 8577)3710857700J MAP REVISED DATE:OCTOBER 17,2006. EXISTING IMPERVIOUS 0.11% STREETS: AREA%(LOT COVERAGE) 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL MEASURES IN AND/OR PROPOSED IMPERVIOUS 1.81 AC(78843 SF) ADJACENT TO NCDOT RIGHT-OF-WAY.ALL METHODS SHALL CONFORM TO THE MANUAL ON UNIFORM AREA TRAFFIC CONTROL DEVICES(MUTCD)AND NCDOT STANDARDS. PROPOSED IMPERVIOUS 14. WORK WITHIN THE RIGHT-OF-WAY SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. AREA(LOT COVERAGE) 7.00 * UTILITIES: RIVER BASIN CAPE FEAR 15. EXISTING UTILITY LOCATIONS SHOWN,IF ANY,ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD VICINITY MAP PRIOR TO BEGINNING WORK.CONTRACTOR SHALL CONTACT NC ONE CALL CENTER AT 1-800-632-4949(OR SUBWATERSHED UPPER CRANE CREEK 811)FOR LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION.NO SUBSURFACE SCALE:1"=500' UTILITY INVESTIGATION HAS BEEN CONDUCTED AT THIS TIME. 16. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING UNDER,AROUND,AND/OR ADJACENT F *TOWN OF CARTHAGE EXCLUDES THE GRAVEL AREA INSIDE THE FENCED YARD AS BUILT UPON AREA BASED ON TO EXISTING POWER LINES. INFREQUENT SITE VISITS AND LIMITED TRAVEL ON THE AGGREGATE SURFACE PER NCDEQ STORMWATER Sheet List Table 16 GRADING PLAN 1 DESIGN MANUAL A-4 Sheet Number Sheet Title 17 GRADING PLAN 2 18 SUBSTATION PROFILES MIGRATORY BIRD HOTLINE 1 COVER SHEET 19 PLAN&PROFILE-ACCESS ROAD STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY 2 EXISTING CONDITIONS SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION,AND DISTRIBUTIONS, Z 20 PLAN&PROFILE-ACCESS ROAD SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO O 3 DEMOLITION PLAN BIRDS.DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND F 21 PLAN&PROFILE-ACCESS ROAD CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. 4 SITE LAYOUT CAROLINAS:800.573.3853 Cl) 4A OVERALL SITE LAYOUT 22 STORM PROFILES SPILL REPORTING HOTLINE �° 23 LANDSCAPE DETAILS Co 5 STAKING PLAN IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS ,, > 24 EROSION CONTROL DETAILS 1 REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER 6 LANDSCAPING PLAN REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR S (2+) 25 EROSION CONTROL DETAILS 2 SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS -' N 7 LIGHTING PLAN DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL,CONTACT ONE OF ~ 26 EROSION CONTROL DETAILS 3 THE DUKE ENERGY SPILL REPORTING HOTLINES AT: W 8 OVERALL E&SC LOD CAROLINAS:800.527.3853 V 9 E&SC PHASE 1 27 EROSION CONTROL DETAILS 4 0 10 E&SC PHASE 2 28 STORM DRAIN DETAILS = 11 E&SC PHASE 3 29 NCG01 DETAILS 12 E&SC PHASE 4 30 NCG01 DETAILS 13 E&SC TRANSMISSION LINE \ppu6IUgi 14 NPDES STABILIZATION TIMEFRAME PLAN \\� CARP /7jZ 15 OVERALL GRADING PLAN : Essio•.,, l'r . A •• , ® TITLE HILL CREST —. E 9S6a1a = 9 Dewberry sc., DUI 230kV SUBSTATION ION r. . %oe el , Dewberry EngineerslInc. 0 RonO ENERGY. 25/10/2024 /4//11111110\ SUITE 410 RALEIGH,NC 27607 PROGRESS COVER SHEET PHONE: 919.881.9939 0 170801L01 05/09/24 FOR CONSTRUCTION GAO/DPW DAR DAR FAX: 919.881.9923 NCBELS#F-0929 SIZE DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED Dewberry Project No.50130463 www.dewberry.com D 81276 1 OF 30