HomeMy WebLinkAbout20160110 Ver 1_EEP in-lieu mitigation approval letter_20160204Environmental
Quality
January 26, 2016
Mr. Chris Murray
NCDOT Division 5 Environmental Supervisor
North Carolina Department of Transportation
2612 N. Duke Street
Durham, North Carolina 27704
Dear Mr. Murray�
Subject: Mitigation Acceptance Letter:
PAT MCCRORY
co���d,�r
DONALD R. VAN DER VAART
5�cr��:�r�
Division S Project, SR 2052 (Rogers Road) Widening and Replace Bridge
Number 910132 over Smith Creek, Wake County; WBS No. 17BP.S.R.47
The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services
(NCDEQ DMS) will provide the stream and buffer mitigation for the subject project. Based on the
information supplied by you on January 25, 2016, the unpacts are located in CU 03020201 of the Neuse
River basin in the Central Piedmont (CP) Eco-Region, and are as follows:
Stream and
Wetlands
impacts
River I CU
Basin Location
Neuse � 03020201
Stream
Eco-
Region Cold Cool
CP 0 0
Wetlands
Warm Riparian Non-
, Riparian
11.0
*Some of the stream impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details.
Coastal
Marsh
All buffer mitigation requests and approvals are administrated through the Riparian Restoration
Buffer Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer
mitigation will be provided in the agreed upon method of fund transfer. Upon receipt of the NCDWR's
Buffer Authorization Certification, NCDEQ DMS will transfer funds from the NCDOT 2984 Fund into
the Riparian Restoration Buffer Fund. Upon completion of transfer payment, NCDOT will have
completed its riparian buffer mitigation responsibility for this project. Subsequently, NCDEQ DMS will
conduct a review of current NCDOT ILF Program mitigation projects in the river basin to determine if
available buffer mitigation credits exist. If there are buffer mitigation credits available, then the Riparian
Restoration Buffer Fund will purchase the appropriate amount of buffer mitigation credits &om NCDOT
ILF Program.
Buffer Impacts
Buffer River Basin CU Eco-Region
Zone 1 Zone 2 TOTAL
Impacts Neuse 03020201 CP 854.0 2,260.0 3,114.0
!`/'Nothing Compares �
State of North Carolina � Environmenl.�l Q�ality
iG01 Nlail Serviw Center ! Raleigh, �orth Carolina 27b99-1607
919-707-8E�0
Environmen tal
Quality
Mr. Murray
January 26, 2016
Page Two
Division 5— SR 2052 Improvements / Bridge 910132
PAT MCCRORY
Gov�rn�r
DONALD R. VAN DER VAART
Secrerary
NCDEQ DMS commits to implementing sufficient compensatory stream and buffer mitigation
credits to offset the impacts associated with this project as determined by the regulatory agencies in
accordance with the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts
are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance
letter will be required from NCDEQ DMS.
If you have any questions or need additional information, please contact Ms. Beth Harmon at
919-707-8420.
Sincerely,
c��Y�'
�
Ja es . Stanfill
Cre Management Supervisor
Cc: Mr. Eric Alsmeyer, USACE — Raleigh Regulatory Field Office
Ms. Amy Chapman, NC Division of Water Resources
File: SR 2052 Widening / Bridge 910132 — Division 5
�'�`/'Nothing Compares�.
StaleofNorthCarolina � Environrr�e�talQuality
1601 MailSeiviceCenter � Raleiyfj,NoithCarolina27699-1u01
9 i 4707-L+600