HomeMy WebLinkAbout20240718 Ver 1_ePCN Application_20240521i DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20240718 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Wilmington Regional Office - (910) 796-7215 Information for Initial Review la. Name of project: 2023 Airpark Water and Sanitary Sewer Improvements 1a. Who is the Primary Contact?* Joseph McKemey 1b. Primary Contact Email: * jwm2@mcdavid-inc.com Date Submitted 5/21 /2024 Nearest Body of Water Grove Creek Basin Cape Fear Water Classification C;sW Site Coordinates Latitude: 35.00255 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Duplin Is this a NCDMS Project Yes No Longitude: -77.99075 What amount is owed?* $240.00 $323.00 Select Project Reviewer* Jordan Cocanower:Jordan.Cocanower 1c. Primary Contact Phone:* (252)753-2139 $570.00 $767.00 O Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 12 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Duplin, County of 2b. Deed book and page no.: 1893 862 2c. Contact Person: Bryan Miller County Manager 2d.Address Street Address 224 Seminary Street Address Line 2 P.O. Box 910 city State / Province / Region Kenansville NC Postal / Zip Code Country 28349 US 2e. Telephone Number: (910)296-2100 2g. Email Address:* bryan.miller@duplincountync.com 3. Applicant Information (if different from owner) 3a. Name: Joseph McKemey 3b. Business Name: McDavid Associates, Inc. 3c.Address Street Address 3714 N. Main Street Address Line 2 PO Drawer 49 city Farmville Postal / Zip Code 27828 3d. Telephone Number: (252)753-2139 3f. Email Address:" jwm2@mcdavid-inc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality I town: Kenansville, NC 2. Proiect Identification 2a. Property Identification Number: 340501278391 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project: " Grove Creek 3b. Water Resources Classification of nearest receiving water: C;Sw 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300070301 4. Project Description and History 2f. Fax Number: State / Province / Region NC Country US 3e. Fax Number: 2b. Property size: 47.35 State / Province / Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undeveloped woodland and grassland. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 1.12 acre 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:" New roads and streets are being constructed. Water and sanitary sewer lines are being constructed to serve the site for future commercial or industrial development as part of the Duplin County Airpark. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * Duplin County prepared an Airpark Master Development Plan prepared by Parrish & Partners. Final Submittal date, July 2022 - Prepared for Duplin County Economic Development Commission. Master Development Plan included wetlands delineation performed by ECS Southeast, LLP. Construction of sanitary sewer lines involves crossing wetlands area. Wetlands will be crossed perpendicular to wetland area. Gravity sewer construction will be shallow, by open cut. A anti -seep collar will be installed around the pipe, downstream of the wetlands area. Tracked excavator will be used to perform sewer line installation. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No Comments: ECS Southeast, LLP Project Number 49-9467-A. Delineated wetlands are not depicted on maps provided by Wetlands Mapper tool. 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2019-01322 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): W. Brandon Fulton Agency/Consultant Company: Other: ECS Southeast, LLP ECS Project Number 49-9467-A O Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR April 10, 2020 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No other permits known D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts O 2a1 Reason (?) 2b. Impact type* (?) 2c. Type of W. 2d. W. name 2e. Forested* 2f. Type of JurisdicitiI ?) 2g. Impact area * W1 Excavation -Utility ��T Construction Unknown �tandArea 2 ��A Both 0.030 (acres) 2g. Total Temporary Wetland Impact 0.030 2g. Total Wetland Impact 0.030 2g. Total Permanent Wetland Impact 0.000 21. Comments: The wetlands area is 84 feet wide at the point of crossing. The pipe will be installed shallow, therefore minimal excavation is required. Impact area is calculated at 84 long at crossing by 15 feet wide to allow room for work. A anti -seep collar is provided on the downstream side of the wetlands area. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Since the sewer pipe is installed at a shallow depth, impacts will be minimal. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The wetlands area will be crossed at 90 degrees to minimize impacts. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Less than 300 feet of crossing and less than 0.1 acres. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments:' Funding agency does not require an environmental document 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. Development will not be allowed in wetlands areas. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A O 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Airpark Master Development Plan document Section 3.2.5 Threatened and Endangered Species 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? Airpark Master Development Plan document 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Airpark Master Development Plan document 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination?* National Flood Insurance Program, Flood Insurance Rate Map Panel 3404J (Map Number 3720340400J) Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Plan Page 14.pdf 737.56KB Detail Page 32.pdf 659.54KB Exhibit 3.5 DAP_ Final_Report.pdf 701.24KB Appendix E DAP_ Final_Report.pdf 1.13MB Appendix G DAP_ Final_Report.pdf 1.18MB File must be PDF or KMZ Comments Attached documents include: Plan Page 14. Detail Page (Anti -Seep Collar) 32 - Detail H Excerpts from Airpark Master Development Plan Exhibit 3.5 - Delineated Wetlands Appendix E - Wetland Delineation Report (Site 2) Appendix G - Jurisdictional Determination (Site 2) Signature a By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Joseph McKemey Signature �-6 1-Ir� Date 5/21 /2024