Division of Water Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned Version# *
20240718 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Wilmington Regional Office - (910) 796-7215
Information for Initial Review
la. Name of project:
2023 Airpark Water and Sanitary Sewer Improvements
1a. Who is the Primary Contact?*
Joseph McKemey
1b. Primary Contact Email: *
jwm2@mcdavid-inc.com
Date Submitted
5/21 /2024
Nearest Body of Water
Grove Creek
Basin
Cape Fear
Water Classification
C;sW
Site Coordinates
Latitude:
35.00255
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Duplin
Is this a NCDMS Project
Yes No
Longitude:
-77.99075
What amount is owed?*
$240.00
$323.00
Select Project Reviewer*
Jordan Cocanower:Jordan.Cocanower
1c. Primary Contact Phone:*
(252)753-2139
$570.00
$767.00
O
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 12 - Utility Lines
NWP Numbers (for multiple NWPS):
12
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification: Yes No
For the record only for Corps Permit: Yes No
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Duplin, County of
2b. Deed book and page no.:
1893 862
2c. Contact Person:
Bryan Miller County Manager
2d.Address
Street Address
224 Seminary Street
Address Line 2
P.O. Box 910
city
State / Province / Region
Kenansville
NC
Postal / Zip Code
Country
28349
US
2e. Telephone Number:
(910)296-2100
2g. Email Address:*
bryan.miller@duplincountync.com
3. Applicant Information (if different from owner)
3a. Name:
Joseph McKemey
3b. Business Name:
McDavid Associates, Inc.
3c.Address
Street Address
3714 N. Main Street
Address Line 2
PO Drawer 49
city
Farmville
Postal / Zip Code
27828
3d. Telephone Number:
(252)753-2139
3f. Email Address:"
jwm2@mcdavid-inc.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality I town:
Kenansville, NC
2. Proiect Identification
2a. Property Identification Number:
340501278391
2c. Project Address
Street Address
Address Line 2
city
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project: "
Grove Creek
3b. Water Resources Classification of nearest receiving water:
C;Sw
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300070301
4. Project Description and History
2f. Fax Number:
State / Province / Region
NC
Country
US
3e. Fax Number:
2b. Property size:
47.35
State / Province / Region
Country
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Undeveloped woodland and grassland.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
1.12 acre
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:"
New roads and streets are being constructed. Water and sanitary sewer lines are being constructed to serve the site for future commercial or industrial development as part of the Duplin
County Airpark.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
Duplin County prepared an Airpark Master Development Plan prepared by Parrish & Partners. Final Submittal date, July 2022 - Prepared for Duplin County Economic Development
Commission. Master Development Plan included wetlands delineation performed by ECS Southeast, LLP.
Construction of sanitary sewer lines involves crossing wetlands area. Wetlands will be crossed perpendicular to wetland area. Gravity sewer construction will be shallow, by open cut. A
anti -seep collar will be installed around the pipe, downstream of the wetlands area. Tracked excavator will be used to perform sewer line installation.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?
Yes No
Comments:
ECS Southeast, LLP Project Number 49-9467-A. Delineated wetlands are not depicted on maps
provided by Wetlands Mapper tool.
5b. If the Corps made a jurisdictional determination, what type of determination was made?
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2019-01322
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): W. Brandon Fulton
Agency/Consultant Company:
Other:
ECS Southeast, LLP
ECS Project Number 49-9467-A
O Unknown
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
April 10, 2020
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No other permits known
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
O
2a1 Reason (?)
2b. Impact type* (?)
2c. Type of W.
2d. W. name
2e. Forested*
2f. Type of JurisdicitiI
?)
2g. Impact
area *
W1
Excavation -Utility ��T
Construction
Unknown �tandArea
2
��A
Both
0.030
(acres)
2g. Total Temporary Wetland Impact
0.030
2g. Total Wetland Impact
0.030
2g. Total Permanent Wetland Impact
0.000
21. Comments:
The wetlands area is 84 feet wide at the point of crossing. The pipe will be installed shallow, therefore minimal excavation is required. Impact area is
calculated at 84 long at crossing by 15 feet wide to allow room for work. A anti -seep collar is provided on the downstream side of the wetlands area.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Since the sewer pipe is installed at a shallow depth, impacts will be minimal.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The wetlands area will be crossed at 90 degrees to minimize impacts.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Less than 300 feet of crossing and less than 0.1 acres.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
Yes No
Comments:'
Funding agency does not require an environmental document
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
Development will not be allowed in wetlands areas.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
O
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Airpark Master Development Plan document Section 3.2.5 Threatened and Endangered Species
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
Airpark Master Development Plan document
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Airpark Master Development Plan document
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
Yes No
8c. What source(s) did you use to make the floodplain determination?*
National Flood Insurance Program, Flood Insurance Rate Map Panel 3404J (Map Number 3720340400J)
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Plan Page 14.pdf
737.56KB
Detail Page 32.pdf
659.54KB
Exhibit 3.5 DAP_ Final_Report.pdf
701.24KB
Appendix E DAP_ Final_Report.pdf
1.13MB
Appendix G DAP_ Final_Report.pdf
1.18MB
File must be PDF or KMZ
Comments
Attached documents include:
Plan Page 14.
Detail Page (Anti -Seep Collar) 32 - Detail H
Excerpts from Airpark Master Development Plan
Exhibit 3.5 - Delineated Wetlands
Appendix E - Wetland Delineation Report (Site 2)
Appendix G - Jurisdictional Determination (Site 2)
Signature
a
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Joseph McKemey
Signature
�-6 1-Ir�
Date
5/21 /2024