Loading...
HomeMy WebLinkAboutNC0005363_Table 6-9_20160201TABLE 6-9 REMEDIAL ALTERNATIVE COST SUMMARY - PHYTOREMEDIATION W. H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Phytoremediation - 55 Acre Phytoplot Item Quantity Unit Unit Cost Total Cost Source Basis for Cost Direct Capital Costs Preliminary Site Evaluation 1 LS $35,000 $35,000 ELM Quote Ash excavated and removed (Cost not included) Planting Plan Preparation 1 LS $12,000 $12,000 ELM Quote Engineering Design Plans and Specifications 1 LS $87,000.00 $87,000 ELM Quote Bid Documents and Bidding 1 LS $12,000.00 $12,000 ELM Quote Construction 55 AC $18,000.00 $990,000 ELM Quote Includes site preparation, planting stock, hydroseeding, tree installation, soil ammendments, etc. Installation Oversight (Geologist) 28 Day $2,000.00 $56,000 Similar project Indirect Capital Costs Health & Safety 5% % DCC $57,850.00 Similar project Bonds & Insurance 5% % DCC $57,850.00 Similar project Contingency 10% % DCC $115,700 ELM Quote Operation and Maintenance Operation and Maintenance Costs 55 AC $2,000.00 $110,000 ELM Quote Tree thinning, weeding, replanting, leaf collection, pesticide application, mowing Present Worth $1,845,800 Similar project n=30 yrs, i=4.25%, PWF=16.78 Remedy Review 1 6 EA 1 $100,000 $600,000 Similar project Completed every five years Present Worth $308,000 Similar project n=5, 10, 15, 20, 25, 30, i=4.25%, PWF=3.08 Total Direct Capital Costs $1,192,000 Total Indirect Capital Costs $231,400 Total 30 Year O&M Costs (Present Worth) $2,153,800 Effectiveness Monitoring 30 Years (Table 6-7) $3,148,600 TOTAL COST $6,725,80011 Prepared by: TCP Checked by: RLP Notes: LS = Lump Sum, AC = Acre, O&M = Operation and Maintenance, DCC = Direct Captial Cost, PWF = Present Worth Factor , n = Time, I = Interest rate (Provided by Duke Progress, LLC) Present Worth was calcualted using the Uniform Series Present Worth Factor at: http://www.ajdesigner.com/phpdiscountfactors/uniform_series_present_worth_equation.php P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-8 to 6-11.xlsx Page 1 of 1