Loading...
HomeMy WebLinkAboutNC0005363_Table 6-6 Remedial Alternative Evaluation Summary R1_20160201TABLE 6-6 REMEDIAL ALTERNATIVE EVALUATION SUMMARY W.H. WEATHERSPOON POWER PLANT DUKE ENERGY PROGRESS, LLC, LUMBERTON, NC Prepared By: KDB Checked By: MT Assumptions: 1. Source control measures are implemented to accomplish groundwater restoration 2. Costs for groundwater remedy include implementation and 30 years monitoring and maintenance P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-6 Remedial Alternative Evaluation Summary Ri.docx Page 1 of 1 Estimated Alternatives Effectiveness Implementability Environmental Groundwater Stakeholder / Feasibility Sustainability Remediation Acceptance Cost Monitored Yes, groundwater High Sound Natural Yes monitoring wells (lowest carbon $3,100,000 technical Attenuation are common footprint) basis for (MNA) approach Phytoremediation Yes Yes, if ash High $6,700,000 Predicted to removedbe positive Moderate Limited due Groundwater (energy costs to trench Interceptor Limited Limited to manufacture $11,100,000 performance Trench steel and install and long trench) time frame Groundwater Moderate Positive due Recovery Wells Yes Yes (energy costs $6,200,000 to proactive for pumps) nature Prepared By: KDB Checked By: MT Assumptions: 1. Source control measures are implemented to accomplish groundwater restoration 2. Costs for groundwater remedy include implementation and 30 years monitoring and maintenance P:\Duke Energy Progress. 1026\109. Weatherspoon Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Table 6-6 Remedial Alternative Evaluation Summary Ri.docx Page 1 of 1