Loading...
HomeMy WebLinkAboutNCC231835_NOT Closeout Documents_20240517 ILN P okr1i cAROt_1N/ May 16, 2024 To: Rex Vick Jr. RBV 1158, LLC 3434-135 Kildaire Farm Road Cary, NC 27518 SUBJECT: Local Sedimentation and Erosion Control Program Project Closeout 1158 Place Clearing (EC-051523-01) Mr. Vick, The City of Wilson has determined that permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. The project is currently in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at https://edocs.deq,nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions, please contact me at (252) 296-3305. Sincerely, Noah Parsons, CFM, CPSWQ Assistant Director of Public Works Cc: Brandon Galloway, Civil Engineer II Tiffanie Garner, Stormwater Compliance Coordinator Thomas Thorne, Engineering Technician Steve Oliverio, Bartlett Engineering and Surveying WILSON NORTH CAROLINA Local Sedimentation and Erosion Control Program Inspection Form Project Name: / C-S7 zrar1. 4(U IA Project Tracking Number: Inspection Date: 5-(5�).` Acres Approved: Project Location: River Basin: Neuse Design Professional: Is the site in compliance with the approved erosion control plans? Yes ❑ No ❑ N/A (Sec. 32.5-6) Is there any off-site sediment? (Sec. 32.5 7 e) ❑ Yes LI-No ❑ N/A Is sediment deposited on public and/or private streets due to ❑ Yes [9 No ❑ N/A construction runoff from site?(Sec. 32.5-7 f) Is the construction entrance adequate for removing dirt from the IA-Yes ❑ No ❑ N/A construction traffic?(Sec. 32.5-11) Has a revised Erosion Control plan been submitted, if required? ❑ Yes M No ❑ N/A (Sec 32.6 m) Are all permanent or temporary measures being maintained? (Sec.32.5-18 a) [11-Yes ❑ No ❑ N/A Are all measures functional at the time of inspection? CIYes ❑ No ❑ N/A (Sec 32.5-18) Is there adequate groundcover(temporary or permanent)to aid in the prevention of erosion? (Sec. 32.5-13 & 15) l -Yes ❑ No ❑ N/A Are all critical areas protected? [Cl-Yes ❑ No ❑ N/A (Sec.32.5-14) Have all erosion control measures been installed? [ Yes O No ❑ N/A (Sec. 32.5-8) Have the self-inspection forms been filled out completely and ❑ Yes ❑ No IZLNCA indicated all site deficiencies? (Sec. 32.5-8 p) Is an approved set of plans on site? (Sec 32.5-6 m) ❑ Yes ❑ No b-N/A S&EC Inspection Form Revision Date:July 2022 r ILS N NORTH CAROLINA The following issues shall be resolved for the site to come into compliance: Recommend issuance of a Notice of Violation? ❑ Yes CI No Recommend issuance of a Civil Penalty? ❑ Yes 1-1 No Additional Notes: Ortiev00 vL 5Ce vt To the best of my knowledge the information on this form is true and accurate, Name of Inspector: l /API Pr I 4-- ri\J Title: Name of PE or Certified E&SC Inspector in Responsiblle Charge: J /pi A- f 4t6 ' Signature of PE or Certified E&SC Inspector: // >'" Title: � 54 �/ Date: —1 .. _. . S&EC Inspection Form Revision Date:July 2022