Loading...
HomeMy WebLinkAboutNCC231618_NOT Supporting Documents_20240516 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Lenoir Project: LCC Soccer Field Improvements River basin: Neuse Person financially responsible:Lenoir Community College-Deborah S Sutton,Sr. Project#: Lenoi-2023-009 VP Address: PO Box 188,Kinston,NC 28502 I. Project Location: Ne 1-[WY 58,Kinston Pictures: No 2. Weather and soil conditions: Sunny,warm,wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes if no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with (name): No one onsite Title: Inspection report: Sent Report Date given/sent: May 13,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self- inspections are required.Project Is in compliance and released under the SPCA.Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: May 09,2024 Time arriving on site: la pM Time leaving site: 1:15 PM cc: No COC