May 15, 2024
LETTER OF APPROVAL
Timbermill Wind, LLC
Attn: Mr. Ken Young, CEO, President
120 Garrett Street, Suite 700
Charlottesville, VA 22902
RE: Project Name: Timbermill Wind Project Acres Approved: 476.0
Project ID: Chowa-2023-002
County: Chowan
City: Edenton
Address: Center Hill Hwy
River Basin: Chowan
Date Received by LQS: May 08, 2024
Submitted By: Timmons Group
Plan Type: Revision
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The Certificate of Approval provided with
the previous plan approval must be posted at the job site. This plan approval shall expire three (3)
years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
J D - North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
[J/►� Jyl Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
NOA.11 C'J OUNA
°'wro"^m m Environmental a.m, 252.946.6481
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Sincerely,
aV rvr
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Mark Goodwin, Timbermill Wind, LLC (e-mail)
Kim Hamby, PE, Timmons Group (e-mail)
WaRO Division of Water Resources (e-mail)
Anthony Scarbraugh, USACE - Washington Field Office (e-mail)
QJ NorthWashington Carolina DRegionalepartmentOffi of1 943 EnvironmeWashingtonntal Quality I DivisionallIW ashington
of Energy.,MineralNorthCarolina and Land
27889 Resources
NOar,CMsm k 4.' J/� ce
Department al Emtmennaplat Openly 252.946.6481
PROJECT INFORMATION SHEET
APPROVAL DATE: May 15, 2024
RESPONSIBLE PARTY: Timbermill Wind, LLC
PROJECT NAME: Timbermill Wind Project
COUNTY: Chowan Chowan Chowan
OFF-SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON-SITE CONTACT:
ON-SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@deq.nc.gov
E Q.,- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Washington Regional Office I943 Washington Square Mall I Washington,North Carolina 27889
raani cu��nn
o.P ft,,^l^� m awio 252.946.6481