Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC241509_Site Plan or Location Map_20240517
18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 GENERAL NOTES: TOW N E PLACE o �� / / / / / \ SILT BAG INLET \\ \ 1.ALL PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR SUITES' P \ BETTER THAN THE EXISTING UNLESS OTHERWISE SPECIFICALLY EXEMPTED BY THESE PLANS. P \ / \ of PROTECTION \\ BY MARRIOTT (DETAIL#]/C-1.04) \\ A X \ 2.THE CONTRACTOR IS CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES \\\ \\ /� \ AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, i / yy \\ \_ PREVIOUS DESIGN DOCUMENTS,AND WHERE POSSIBLE,MEASUREMENTS TAKEN IN THE FIELD. • \ / / / }-1 \ THE INFORMATIONIS NOT E BE RELIED ONESIELDBEING EXACTE OR RA COMPLETE.THE LOCATION OF Fairfield -99 \\\ e - J \+ '-'0 EXISTING UTILITIES MUST BE VERIFIED IN THE FIELD BV THE CONTRACTOR PRIOR TO / L• X � CONSTRUCTION. ► \ / /� / / / �� 5 / S \ /� /J� \\� 3.THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY BY MARRIOTT DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS j i ��/ \\ VGA' \ \\ AND SHALL WAIT FOR INSTRUCTIONS PRIOR TO PROCEEDING. /'vO v \ �� S \\ .J 4.PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR IS RESPONSIBLE TO VERIFY THAT ALL /� uI S \\ 1 V OO _\ \\ REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM ALL REGULATORY N _, / �� �/ /0 ) /i- -��\\ \ AUTHORITIES AND SHALL BE THOROUGHLY FAMILIAR WITH CONDITIONS OF SAID PERMITS AND N \ / i S \\ / y( INSPECTION REQUIREMENTS. - %// //PROP.STORM DRAINAGE(SEE / ' / _ 5.THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS,UTILITIES AND SHEETC-1.07FORSTORM S \\ \\ RIGHT-OF-WAYS,PUBLIC OR PRIVATE,PRIOR TO WORKING IN THESE AREAS. DRAINAGE INFORMATION) �iS \ \\\ B.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL INSIDE OR OUTSIDE THE CONSTRUCTION LIMITS. 44 7.CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMEN AND PUBLIC ARE NI \ PROTECTED FROM INJURY. \\ 8.LANDDESIGN SHALL NOT BE IN CONTROL OR CHARGE OF,AND SHALL NOT BE RESPONSIBLE FOR \\ ACTUAL CONSTRUCTION MEANS,METHODS,TECHNIQUES,PROCEDURES,OR SAFETY • „ \\ \\ PRECAUTIONS IN CONNECTION WITH THE WORK,OR FOR THE ACTS OR OMISSIONS OF CONTRACTORS OR ANY OTHER PERSONS NOT UNDER THE EMPLOYMENT OF LANDDESIGN. M HARDWARE CLOTH 8 GRAVELINLET PROTECTION(TYP.) 4,� EROSION CONTROL NOTES: 44 (DETAIL#6/C-1 • ADJUST CONSTRUCTION AND • SILT FENCE PLACEMENT ONCE 1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NEW CURB AND GUTTER IS SETCURRENT NC.EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL(WEBSITE: d U HTTPS://DEQNC.GOV ► 4 / i / \\ ���/ �/ SS a VI• �i/G \ \ >!� \se �� p - EX.STORM DRAINAGE \\ 2, ALL"STD.'NUMBERS REFERTO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL / \C�/ / ^ . �-i% \\ �. \ \\\ REMAIN(TVP) \\ \ QUALITY,UNLESS OTHERWISE NOTED. i R -- \\ SS \ 1 3. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING i ii / -(SONS E p\,\`' L/'a � / \ \•. \ ETA ADMINISTRATOR. � ��i `NP O� Nip W w�� / /�` / \ \ ��, Q 4. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS AN VIOLATION OF THE \ i� OFJe\,\ �� SS / \ \ \ ` ,a y-; \ �) STATE'S EROSION CONTROL STATUTES AND IS SUBJECT TO A FINE. L d \\ C'''''\�\.E i p ' O ' \\ .\• \\ ♦ M \\ \ 5. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A L \ \ VIOLATION OF THE STATE'S EROSION CONTROL STATUTES AND IS SUBJECT TO A FINE. V' /// ••,o XS \ ' J� \ \\ ` \ fi. STABILIZATION IS THE BEST FORM OF EROSION CONTROL.TEMPORARY SEEDING IS 7 // �� / ` •\, \ \ �p NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY \ II \\ SS / � \\ \\\ �� \ YY I ��) C. WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE yy//• . PLAN. i 9 WW \ S I 7. GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS OF COMPLETION OF GRADING ON \/`>` \\ /SS/ 0,0 / /•' \ �\ • \\ ff O \\ \ \ PERIMETER AREAS AND ON SLOPES GREATER THAN 3:1.GROUND STABILIZATION MUST OCCUR %0.0 \ WITHIN 14 DAYS OF COMPLETION OF GRADING ON ALL OTHER AREAS OF THE PROJECT. _ / • * 8. ANY AREAS DISTURBED WHERE SEDIMENT CONTROL IS NOT FEASIBLE OR EROSION WILL CAUSE \ / / 79�•/ \\\ •\\ \ \ qRy 0,,,� \* z\:._ ) v\ \ CC\ SEDIMENT TO ENTER WATER COURSE(CREEK BANKS,CREEK BED,DISTURBED CHANNELS) SS \ •'.. �'/ � / d \ • '`‘'..ter. �,y \\ MUST BE STABILIZED THE SAME DAY THE AREA IS DISTURBED. / / \ /. •. �9� ; \\ �`r \ �AG@ *.9 \\ /` \\\ 9. ANY OFFSITE BORROW PITS,BURY PITS OR EROSION AND SEDIMENTATION ONTROLL PERMIT. KPILE AREAS MUST HAVE AN APPROVED a / Y \ SILT BAG INLET o SS \ \.I \ \\. \gip 0\ \\ 10. FAILURE TO SCHEDULE AN RIORTE MEETING WITH THE SPATE'S EROSION CONTROL PROTECTION . CO) \ \ p8' )` \\\ �C J\ COORDINATOR 48 HOURS PRIOR TO ANV LAND DISTURBING ACTIVITY IS A VIOLATION OF STATE K (DETAIL#7/C-1.04) • Oilk \\ "j \ `�i)\ STATUTES AND IS SUBJECT TO FINE. K S • `j-y \ `n \ \\ \ 11. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAV BE REQUIRED BV A • \ �,;.+ \ j YJ+ \ \�`• O \ \ REPRESENTATIVE OF THE CITY OF KANNAPOLIS ENGINEERING DEPARTMENT OR NCDEQ. iiii SS/ ���' ® I .e+ \ \ \\\ \ �4,� \ \•'� \ \\ \• 12. ANY LAND DISTURBING ACTIVITY>5 ACRES REQUIRES COMPLIANCE WITH ALL CONDITIONS OF S /. Iy ' \ I \ \ •`• `�\ / \ O \\ , nC \\ THE GENERAL PERMIT TO DISCHARGE STORM WATER UNDER THE NATIONAL POLLUTANT O \ \ \ -- ,,, ,,e \ \\ DISCHARGE ELIMINATION SYSTEM(PERMIT NO.NCG010000). D0 \J Q '' \ •r\ I `i ,T m \ ^/ / \ 13. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1,UNLESS DIRECTED BY THE ENGINEER. �`/ C HARDWARE CLOTH 8 GRAVEL` \ J' \ 00 /� \\\\ 14. SAND OR SCREENING SHOULD BE REQUIRED BENEATH EXCAVATED MATERIAL THAT IS ► •1 (\ INLET PROTECTION(TYP.) \ \ // \\ STOCKPILED ON STREETS OR PAVED SURFACES. / •�`�� �j 56145046820000 (DETAIL#6/C-1.04) \ ii,�• s \ -/ \\ 15. TOTAL DENUDED LIMITS AREA:3.41 ACRES C,� A. G TEMERITY PARCEL F LLC v V A '7� \\ SEAL: k.�9n to DB 13330-63 \• \ \ `riPI \\� CONSTRUCTION SEQUENCE:PHASE2 U111111/// \\I11///(\ .�\ r \ MB 56-19 1 PROP. (S E SHEET DRAINAGE 07 FOR \\ \S� \ / , 1. UPON COMPLETION OF ALL EROSION CONTROL MEASURES,CONTRACTOR TO REFER TO SHEET ♦♦Q��'E rBGU ®�j% \\\ C$� /��- t1.913 ACRES ;,i J 9 fT`� 1 MORE INFORMATION) C-1.07 FOR THE INSTALLATION OF STORM DRAINAGE AND UTILITIES. J =®:-a" - F _ 2. REFER TO SHEET L-4.00 FOR GRADING PLAN. _; :7= J'f / 3. UPON COMPLETION OF STORM DRAINAGE,CONTRACTOR TO REFER TO PHASE 2 OF EROSION =*• Qo°-®t EJ *- :� 043902 r // p.� � \ S s� CONTROL PLAN FOR ALL EROSION CONTROL MEASURES. � $'.S Q - �� U • \ cs)O / cA, I / „1 4. CONTRACTOR TO INSTALL STORM DRAINAGE INSIDE OF SSB#1 BEFORE REMOVAL OF SSB#1. % S. ` %,y9,,I,CEA��¢-,��.\` \ / ♦. \ 5. CONTRACTOR TO REMOVE SKIMMER SEDIMENT BASIN#1 ONCE STORM DRAINAGE AND GRADING `m�.'}/ 1°$�U° i�R I N '.♦•� i \ ,'• \ '`� I -` \ • \ a\ ARE COMPLETED. ii�9 9 ♦ pN.....GC ► \ \.. fi. GENERAL CONTRACTOR SHALL RINGG UBBI EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING PRIOR TO ANO DURING GRUBBING AND GRADING OPERATIONS. / / \ ]. THECONTRACTORSHALLDILIGENTLYANDCONTINUOUSLYMAINTAINALLEROSIONCONTROL _ O5IO7/2OZO 8DEVICES AND ST IN TALL NY ADDITIONAL EROSION CONTROL MEASURES DEEMED NECESSAR�� /�� CONTRACTOR TO INSTALLA V ,e BV THE EROSION CONTROL INSPECTOR CONTRACTOR TO REFER TO DEMOLITION FOR ALL SITE \ \ DEMOLITION\H \ GUTTER,ALL UTILITIES,AND SIDEWALKS ACCORDING TO PLANS.SEE L-1.00 FOR LAYOUT PLAN�� / Q \ \ IS. WHEN PHASE 2 CONSTRUCTION IS COMPLETED AND SITE IS STABILIZED,CONTRACTOR SHALL 9 .'a /�•Ckt `� 0 \ CALL FOR AN ON-SITE INSPECTION BV INSPECTOR. \ / ` \ II. FOR PHASED EROSION CONTROL PLANS,CONTRACTOR SHALL MEET WITH EROSION CONTROL SITE PLAN SUBMITTAL �\ \ \\. y.• lr�.����. �� � �\ INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. L} V \111,' `, ��a� fe \ 12. STABILIZATION IS THE BEST FORM OF EROSION CONTROL.TEMPORARY SEEDING IS NECESSARY Villii.... ,, PROP.WATER METERS AND BACKFLOWS ■ �*.� � P11r�� 9 \ TO ACHIEVE EROSION CONTROL ONO L ARGE DENUDED AREAS AND ESPECIALLY WHEN ► \\ b ' (SEE SHEET C-1.07 FOR MORE I e ���� ( w \ \ \ SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE.REFER TO ATTACHED 0 5/0 7/2 0 2 4 INFORMATION)0°..* �� • JI\C NCDEQ STABILIZATION TIMEFRAME TABLE FOR ALL STABILIZATION REQUIREMENTS.REFER TO 7 / \ �/1y')` /� \ EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS. \\' \ j / I �' \ `� \ 13. ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT.O FAILURES ARE FOUND THEY SHOULD C REPAIRED AS SOON A I POSSIBLE. \ 14. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH NCDEQ AND \\• a ® PROP.SANITARY SEWER MANHOLEitAtiri ` \ \\ CITY OF KANNAPOLIS EROSION CONTROL STANDARDS. p p" PROPCONSTRUCTION ENTRANCE#1(TYP) 11;0 • 15. ALL STREETS SURROUNDING THE PROJECT SHALL REMAIN CLEAN AND CLEAR OF DEBRIS AT ALL - (>` ,- (SEE SHEET C-1.07 FOR SEWER C\ ♦ \\ (MINIMUM 50'LENGTH)(INSTALLED IN PH 1) INFORMATION TIMES.DENUDED LIMITS(TVP) LATITUDE:35.50' • 16. AS THE CONTRACTOR COMPLETES DEMOLITION WORK,THE DISTURBED AREA SHALL BE (3.41 ACRES) \ r '- O LONGITUDE:-8063' • • SILT BAG INLET \\� STABILIZEDWITHIN]DAYSOFCOMPLETIONOFGING ON PERIMETER AREAS AND ON SLOPES _\\ 1 . / PROTECTIONGREATER THAN 3:1.GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS OF COMPLETION OF• N HARDWARE CLOTH&GRAVEL �• (DETAIL -1 ) GRADING AND ON ALL OTHER AREAS OF THE PROJECT DE IL#7/C .04 • o ® (DETAIL#BC 1.04) lit INLET N(TYP.)44, . ♦ EMI TAB ADJUST CONSTRUCTION AND ` 1 SILT FENCE PLACEMENT ONCE \ / \\ ��`� •♦Q• .� t�1111111 ra, / O \V. NEW CURB AND GUTTER IS SET \ \ .�/ 4*) 0 �•INIIIIII ® ,� /+may' / - w ®\ .1 ' �•111111111111, PROP.SANITARY SEWER MANHOLE V1�111:111:1�111114 CIIIII1/ • (SEE SHEET C-1.07 FOR SEWER INFORMATION) F �� 111�11111��1 m/ // 00 EXISTING UTILITY NOTES: F - '\ 11�1:1.�� BUILDING \ / / V PROP.WATER CONNECTION 11 I��r FFE 822.45 / ♦ / / (SEE SHEET C-1.07 FOR CONTRACTOR TO COORDINATE WITH ALL EXISTING UTILITY COMPANIES PRIOR TO \ • J \\ \'.1.Ir l / / / // UTILITY INFORMATION) AND DURING CONSTRUCTION FOR ANY EXISTING UTILITY MAIN OR SERVICE _0.4CROSSINGS/CONFLICTS: PROP.RELOCATED FIRE HYDRANT CONNECTION '\ �'J \loll F �' il PROP.CONCRETE WASHOUT PIT // / //� - v0 (SEE SHEET C-1.07 FOR UTILITY INFORMATION) DOMINION ENERGY LINDSEY SHEALY \ ,//// INSTALLED IN PHASE I(TYP) CONTACT: EMAIL LINDSEV.SHEALV@DOMINIONENERGV.COM • - ► , \• I / / / J�// .•/ PROPOSED RELOCATED DUCT BANK PHONE:]04-351$666 \�l)�\\ Y PROP.STORM DRAINAGE / �. �� / / A� e- (SEE SHEET C-1.07 FOR / • d i (SEE SHEET G1.08 FOR MORE INFORMATION) DUKE ENERGY CONTACT: MILTON THOMPSON \ • d� \\ � MORE INFORMATION) i,/ + PHONEn7• 104-763-206MPSON®DUKE-ENERGV.COM PROP.LOCKING GATE NI. / •\O 56145014040000 (INSTALLED IN PHASE 1) \ \ ) \\»,999j� / BOO KANNAPOLIS OWNER ''0 '• \ % / 041)/ r -- _ `/ • / _ DB:16229-0218 V' i. {// i E /-2.]O ACRES \C ��a3�< 1 ��\\ \ ® / / // iCv� e, * ^� / •_ . \,�O E \ %o<z11\\ \ / Iayr / t0 • PROP.TRANSFORMER •' • / V. \ o \ AND SWITCHGEAR PADS / // O ► 1f` Zq/Z `� \ / , � 2 SITE PLAN SUBMITTAL 05.07.2024 \ Q 9� \• \\ //_ TREE PROTECTION FENCING 1 SITE PLAN SUBMITTAL 03.04.2024 \ '� / / 101 p r';y * s -�, I NUMBER ISSUED FOR DATE \" �\ :/7" pPROP.SILT FENCING \ is \ J0 / / \'DINSTALLED IN PHASE I(TVP) �\• / // / � . / •, BUILT F0RM \ // 9(\ / f/ / OO HARDWARE CLOTHS GRAVELARCHITECTURE Ch93icago,IL 60642 Chestnut I 520 C' \ / ' ' I 1.5%-2.00% I 1.5%-2.00% D \, ---...„9.,......, 1 I SLOPE ACROSS EXISTING SIDEWALK \ \ - - - X /:____ PLANTING STRIP \ ta \ j • /7 / NF -,,, �/ 1 INLET PROTECTION(TVP.)• / iY�O i/ J�y9 (DETAIL#6/G1.04) 2,00' F� VILENG NEERILANDSCAPE a J {, �� `') cp, r•� 'C� / .% \EXISTING CURB AND GUTTER TO BE REMOVED g�0clLand Desi n ► V -2 �GP ��.� ��� �� / 9� �� ....-A NC3 ENGINEERING Graham Street, LICENfSEteC�0658C 202 �� /a' # C _ ✓ •' "� J • ( STRUCTURAL ENGINEER �- I •iPROP STORM DRAINAGE SEE N.T.S. Speight,Marshall&Francis DRAINAGHEET IN07 FORSTORM /!� e \ .f \ �7 / �� / DRAINAGE INFORMATION) VA,23454 757.427.1 Parkway, 201,Virginia Beach, C \ 'c• 7Q �/ �� � t0(o// ��" • C MECHANICAL/ELECTRICAL/PLUMBING ENGINEER a9n 1 B / / / C PROP.CONSTRUCTION FENCING Charlotte Mechanical Engineering,PLLC. \ •' INSTALLED IN PHASE 1(TYP) 1u ��� 7c�P /+\�/ @P \ •� •/••• CITY OF KANNAPOLIS EROSION CONTROL LEGEND NC,28273 h 704.688.9320 Drive,Suite E,Charlotte, m 56145072260000 • \ / * ® 1 0 CONSTRUCTION ENTRANCE L�1 /y POOL CONSULTANT Y P DB:11615-0182 I\ \\\ ` �i G i \ ' ��� +/-7.II ACRES (DETAIL#2/C-1.04) Quality Design Pools ► / , i� • •/ PROP.SILT FENCE CONCRETE WASHOUT PIT ��QQjv v v AmhefSi / • ��-� (DETAIL#1/C-1.04 NH,03031 603.880.4888 i i V41111011; r i/ C INSTALLED IN PHASE 1(TYP.) ) • \ v G • DENUDED LIMITS �wo wo� PROJECT s+ i , /4 PROP.TREE PROTECTION FENCING INSTALLED IN PHASE 1(TYP.) TEMPORARY SILT FENCING D D r , � / (DETAIL Kann p hs Marriott SILT BAG INLET a o B \ / PROTECTION PROP.STORM DRAINAGE(SEE SILT BAG INLET PROTECTION E R (DETAIL#7/C-1.04) \ PROPOSED TEMPORARY ROCK CHECK DAM(TYP.) SHEET C-1.07 FOR STORM (DETAIL#7/C-1.04) CLIENT i•• NVE• - / , DRAINAGE INFORMATION) KB10 LLC / Ot-O\5 \ HARDWARE CLOTH 8 GRAVEL 0 / 0)1,34t VP-� ,�/ PROP.STORM DRAINAGE HINLET PROTECTION(DETAIL#8/C-I.04) 0NESpQ PJ0\'\G /- / (SEE SHEET C-1.07 FOR NLEDT PROTECTWARE OION(TYP.) DRAINAGE AREA ---- ► \ ' /, v\s\PgQ // \ �� MORE INFORMATION) (DETAIL#6/C-1.04) SHEET TITLE __ TEMPORARY SILT DITCH TD-> (DETAIL#3/C-1.04) ry ROCK CHECK DAM(DETAIL#5/C-1.04) �= it / ----_�L'✓:i✓A / �� / / \ ► EROSION CONTROL PHASE II \ '1 // / • / / CONSTRUCTION FENCING o 0 A T \ sq, / /M1 1� / \ --- EXISTING MINOR CONTOUR - 820 = A \\'/I // �\ EXISTING MAJOR CONTOUR 820 6- \ O \\\ �/ // .� �_�� \ PROPOSED MINOR CONTOUR 1"=20' PROJECT NO. // , 0/,y\ // // / PROPOSED MAJOR CONTOUR r]r]_rl A • a /� ® 100 40 LJ Y Y 1 DATE C-1 .03 ���oo y / ��/ %// _ _ _ _ _ _ _ _ _ 05-07-2024 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 a 1 ©2023 BUILT FORM, LLC