HomeMy WebLinkAbout20140692 Ver 1_RE Inspection of the bridge project in Wadesboro_20160125
Hood, Donna
From:Alex Sewell <wadesboromanager@windstream.net>
Sent:Monday, January 25, 2016 11:02 AM
To:Hood, Donna
Cc:Howard, Joel M; Thompson, Larry B; 'Hugh James'; 'Jeff Carpenter'; 'Ferguson, Darrell'
Subject:RE: Inspection of the bridge project in Wadesboro
Ms. Hood,
Thank you for the prompt follow-up. The Town has reached out to our CEI Firm who is looking into the matter.
Thank you,
M. Alexander Sewell, Esq.
Town Manager
Town of Wadesboro
Mail: PO Box 697, Wadesboro, NC 2817
Physical: 124 E. Wade Street, Wadesboro, NC 28170
Phone: (704) 694-5171
Fax: (704) 695-1331
www.townofwadesboro.org/
From: Hood, Donna \[mailto:donna.hood@ncdenr.gov\]
Sent: Monday, January 25, 2016 10:59 AM
To: Alex Sewell
Cc: Howard, Joel M; Thompson, Larry B; Hugh James; Jeff Carpenter; Ferguson, Darrell
Subject: RE: Inspection of the bridge project in Wadesboro
Hi Mr. Sewell,
Our expectations are below and correspond to your questions:
1.The contractor was told verbally on the day of the inspection and was aware of the problem. It was their
intention to correct it before leaving that day.
2.I do not know if it has been corrected. The inspection was a few weeks ago and I have not been back to the site.
3.The expectations are that the Town will be informed enough to ask the questions of the contractors and/or
inspectors—‘I was informed by the State that you had a deficiency on site, have you corrected it?’ Nothing more
than that. Should there be some type of egregious violations, the expectations would be greater. This deficiency
1
is not unusual nor is it unexpected considering they severity of rain we have had lately, however; it should have
been immediately corrected and the tendency in all types of construction is to delay repair of sediment and
erosion control measures because they take time away from completing pay items. If the Town knows, then
Town can help close the information loop and ask the questions of those involved.
As the holder of the 401 permit, I wanted to make sure you knew and I expect the repair has probably been made by
now. The written records were well done, and I appreciate that. Also, please know that any egregious deficiency or
violation would be written up on formal letterhead and sent certified mail, an email is just to keep everyone in the loop.
Please let me know if you have any additional questions.
Regards,
Donna Hood
Donna Hood - Donna.Hood@ncdenr.gov
North Carolina Dept. of Environmental Quality
Division of Water Resources
Transportation Permitting Unit
610 E. Center Ave.
Mooresville, NC 28115
Ph: 704.663.1699 Fax: 704.663.6040
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Email correspondence to and from this address is subject to the North Carolina Public Records law
and may be disclosed to third parties unless the content is exempt by statute or other regulation
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
From: Alex Sewell \[mailto:wadesboromanager@windstream.net\]
Sent: Monday, January 25, 2016 9:49 AM
To: Hood, Donna <donna.hood@ncdenr.gov>
Cc: Howard, Joel M <jhoward@ncdot.gov>; Thompson, Larry B <lthompson@ncdot.gov>; Hugh James
<towwaterplant@windstream.net>; Jeff Carpenter <jeff@carpenterflake.com>; Ferguson, Darrell
<DFerguson@louisberger.com>
Subject: RE: Inspection of the bridge project in Wadesboro
Good morning Ms. Hood,
Thank you for letting me know about the results of your 1/8/16 inspection of the E. Wade Bridge Replacement Project.
1.)Has the Contractor and/or Inspection Firm been notified of this deficiency? If so, what was the response?
2.)Has the deficiency been corrected?
3.)What is the State’s expectations of the Town in this situation?
Thank you,
M. Alexander Sewell, Esq.
Town Manager
Town of Wadesboro
Mail: PO Box 697, Wadesboro, NC 2817
Physical: 124 E. Wade Street, Wadesboro, NC 28170
2
Phone: (704) 694-5171
Fax: (704) 695-1331
www.townofwadesboro.org/
From: Hood, Donna \[mailto:donna.hood@ncdenr.gov\]
Sent: Monday, January 25, 2016 7:03 AM
To: wadesboromanager@windstream.net
Cc: Howard, Joel M; Thompson, Larry B
Subject: Inspection of the bridge project in Wadesboro
Mr. Sewell,
th
On January 8, 2016 I performed an inspection as relates to the 401 and construction stormwater permits on the bridge
replacement in Wadesboro. At the time of the inspection the following deficiency was found:
1.As pertains to certification condition 2 (a)—properly maintains all sediment and erosion control measures—
approaching the project from Highway 74, on the right hand side, measures had not been repaired after the last
rain event. Waddles were overwhelmed and the swale carrying stormwater had not be stabilized. Please see
attached pictures.
Site monitoring had been performed and documented as required.
Other permit requirements were being performed as required.
Please let me know if you have any questions.
Regards,
Donna Hood
Donna Hood - Donna.Hood@ncdenr.gov
North Carolina Dept. of Environmental Quality
Division of Water Resources
Transportation Permitting Unit
610 E. Center Ave.
Mooresville, NC 28115
Ph: 704.663.1699 Fax: 704.663.6040