Loading...
HomeMy WebLinkAboutWQCS00054_Report_20240515Mr. John Hennessy North Carolina Department of Water Resources Water Quality Permitting Section/NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Wednesday, May 1, 2024 RE: EMC SOC WQ S20-001 May 2024 Quarterly Progress Report Mr. Hennessy, A UNIONCOUNTY WAT E R DECEIVED MAY 15 2024 DEQ/DWR -antral Office Union County Water receieved the fully excuted SOC for the Grassy Branch WRF on June 21, 2022. As a requirement of this SOC the County is to submit quarterly progress reports. This letter is intended to serve as the quarterly progress report. Below is a summary of items that took place during the May 2024 report period. For Collections system permit WQCS00054 • Ongoing inflow and infiltration (I&I) rehabilitation in the Grassy Branch basin. o All I&I concerns identified in the June 2022 Grassy Branch Collections System Assessment Report have been addressed. For NPDES Permit NCO085812 Submit Contract documents for regulatory approval for Grassy Branch WWTP upgrade project. o Authorization to Construct was approved on February 19, 2024. o Project to be advertised forbid upon approval of NCDEQ-DWI since project is utilizing ARPA funding. Bid opening is tentatively scheduled for late June 2024 so that the construction NTP can be issued prior to September 30, 2024. If you have any further questions please feel free to contact me. Sincerely, Christopher Clark, PE Water & Wastewater Division Director CC: Hyong Yi, Public Works Administrator Josh Brooks, Water & Wastewater Assistant Division Director John Shutak, Engineering Division Director Greg Morgan, Utility Field Services Superintendent Jonathan Jordan, WRF Superintendent Union County Water 4600 Goldmine Rd Monroe, NC 28112 T 704.289.1434 unioncountync.gov/water