NC DEMLR - FROF Application Approval with Modifications Needed CRM:0104189
3 messages
SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Thu, May 2, 2024 at 10:00 AM
To: Horizon Church <horizonchurch180@gmail.com>
—,NESTAT£-
ri4r.-411fr'6' 1 i
oft
'.,6, w , ,.4)e,
ctiEs.9�xlt,z,1in
- QUAM;co
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
05-02-2024
Horizon Church
204 Tannery Rd
State Road, NC 28676
RE: Project Name: Horizon Church
Acres Approved: 2.28
Application ID: PA-004635
Permit Number: SURRY-2024-0113
Address: 204 Tannery Rd
City: State Road
County: Surry
River Basin: Yadkin - Pee Dee
Stream Classification: C:Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: Revised Plan
Dear Horizon Church,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed
below. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the
date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate
of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $120 annual permit fee.After the fee is processed, you will receive the
COC
via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity.The eNOl form may be accessed atdeq.nc.gov/NCG01. Please
direct questions about the eNOlform to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the
approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources
and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to
exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and
additional application fee.
In addition, it would be helpful if you notify this office of the proposed starting date for this project.
Modifications Required for Approval:
1. Erosion and sediment control measures are shown outside the proposed disturbed limits. All areas required for
erosion control measures or other land-disturbing activities associated with this project must be included within the
disturbed limits. [15A NCAC 4B .0118]
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and
asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC
DEQ DEMLR prior to the removal of any ESC measures. All additional permits should be obtained, as necessary,
prior to beginning construction. [GS 113A-51, 15A NCAC 48 .0120]
3. Any off-site borrow and waste required for this project must come from a site with an approved erosion control
plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at
a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the
approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional
steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCGO1 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly
NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing
the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested
until after the site has achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary
between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid
contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site
pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Nicole Chiles, PE -Assistant Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachments: Certificate of Approval
FRO Application Report
� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
DQ
_-2
EWinston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem NC,27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state
official.
2 attachments
�1 Application Report-Thursday, May 2,2024 954 AM.pdf
97K
.1 SURRY-2024-0113 Horizon Church.pdf
119K
Jamie Wood <horizonchurch180@gmail.com> Fri, May 3, 2024 at 6:36 PM
To: garrettbill65@aol.com
Sent from my iPhone
Begin forwarded message:
From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Date: May 2, 2024 at 10:00:46 AM EDT
To: Horizon Church <horizonchurch180@gmail.com>
Subject: NC DEMLR-FROF Application Approval with Modifications Needed CRM:0104189
[Quoted text hidden]
2 attachments
Application Report-Thursday, May 2, 2024 954 AM.pdf
-i 97K
SURRY-2024-0113 Horizon Church.pdf
119K
garrettbill65@aol.com <garrettbill65@aol.com> Sun, May 5, 2024 at 12:49 PM
To: Jamie Wood <horizonchurch180@gmail.com>
W 000000000000 H 00000000000[[[[[[[I][[[[I[[[[
[Quoted text hidden]