Loading...
HomeMy WebLinkAbout20151330 Ver 1_Approval Letter_20160128�,. ";.,.Y �o Water Resources ENVIRONMENTAL OUALIT.Y � � � � PAT MCCRORY Gnvernor DONAL:D R. VAN DER VAART Secreln��� S. JAY ZIMMERMP.N Urreclor January 28, 2016 Franklin County NCDWR Project No. 20151330 Bridge 71 on SR 1636 State Project No. .17BP.5.R.58 , APPROVAL of 401 WATER QUALITY CERTIFICATION and TAR-PAMLICO, BUFFER AUTHORIZA�'ION with ADDITIONAL CONDITIONS Mr: J. Hopkins, P.E., Division Engineer NCDOT, Division 5 . 2612 North Duke Street Durham; NC 27704 Dear Mr. Hopkins: . You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing Bridge 71 in Franklin County> Stream Impacts in the.Tar-Pamlico River Basin r-..Site Riprap Stabilization to Perennial. .. Temnorary Fill,in, Perennial Total Stream Imnact � Stream (linear ft Stream (linear, ft) linear ft Total 49 49 (Concurrent) 49 Total Stream Impact for Project: 491inear feet. Wetland Im acts in the Tar-Pamlico River Basin' . Site Excavation ac Mechanized Clearin ac) Tota1 Wetland Im act ac Total 0.01 0.07 0.08 Total Wetland Impact for Project: 0.08 acres. Tar-Pamlico Ri arian Buffer Im acts Site Zone 1 Impact Zone 1 Buffer Mitigation Zone 2Impact � Zone 2 Buffer Mitigation (s ft) Re uired (usin 3:1 ratio (s ft) Re uired usin 1.5:1 ratio Totals 3Z46 N/A 2831 N/A * n/a= Total for Site is less than 1/3 acre;and 150 linear feet of impact, no m.itigation required Total Buffer Impact for Project: 6577 square feet. The project shall be constructed in accordance with.your application received. December 18, 2016. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certifcation Number 3883. This cer�ification coiresponds to the Nationwide Permit3 issued by the Coips of �:ngineers. This approval is also valid for:the Tar-Pamlico Riparian Buffer.Rules (1SA:NCAC 2B..0259). I.n additiori, you should acquire.any; other federal; state or local permits before you proceed with your project including (but not limited fo) Sediment and Erosien Conir�l, Non-Discharge and Water Supply Watershecl regulatiors. This approval wi11 expire with the accompanyirig 404 permi±. State of Nodh Carolina �Environmental Quality � Water Resources 1617 Mail Service Center, Raleigh, Nqrth Carolina 27699-1617 .. Phone:919-807-6300 . This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland flls for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 2B.0259. For this approval to remain valid, you must adhere te the conditions listed in tne attached certification(s) and any additional conditions listed below. Conditions of Certification: 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. [15A NCAC 02H .0506(b)(2)] 2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for Construction and Maintenance Activities. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 4. Bridge piles and bents shall be constructed using driven piles (hammer or vibratory) or drilled shaft construction methods. More specifically, jetting or other methods of pile driving are prohibited without prior written approval from the NCDWR first. [15A NCAC 02H.0506(b)(2)] S. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters. This water sha11 �e captt�red, treated, and disposed of properly. [15A. NCAG 02H .0506(b)(3)] 6. A turbidity curtain will be installed in the stream if driving or drilling activities occur within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. [15A NCAC 02H .0506(b)(3)] 7. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless otherwise approved by this certification. [15A NCAC 2B.0259] 8. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with native woody species before the next growing season following completion of construction. [ 15A NCAC 2B.0259] 9. Pursuant to 15A NCAC 2B.0259, sediment and erosion control devices shall not be placed in Zone 1 of any Tar- Pamlico Buffer without prior approval by the NCDWR. At this time, the NCDWR has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. 10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concr�te shail net he ciischa:ged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200] ] 1. During ti�e cansn-uction of the project, no staging of equipment of any kind is pern�itted in waters of the U.S., or protected rip�rian buffers. [15A NCAC 02H.0506(b)(211 12. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [ 15A NCAC 02H.0506(b)(2)] 13. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC 02H.0506(b)(2)] 14. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submiited for approval. [15A NCAC 02H .0507 (c) and 15A NCAC 02H .OSG6 (b)(2) and (c)(2)j 15. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC 02H.0506(b)(3) and (c)(3)] 16. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [ 15A NCAC 02H.0506(b)(3)] 17. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 18. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. [15A NCAC 02H.0506(b)(3)] 19. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 20. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate reo,uirements of State and Federa] law. If the NCDWR determines that such standards or laws are not being mer (incluclir� thP f�il�re ±o s�:stair. a c1.P�ignate�i or achieved use,) or thzt State or fecleral law is be�ng viola±ed, or tha+.. further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. �15A NCAC 02B.0200] 21. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [ 15A NCAC 02H.0506(b)(2)] 22. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 23. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization � shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and .0502] 24. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer ruies, stormwater management rules, soil erosion and sedimentation control requirements, etc. 25. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 2ti. lTpan completion ai th� project (including aay impacts at associated borrow or waste sites), ine NCDQT uivi�ion Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502( fl] 27. Native ripas•ian vegetation (ie, trees and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits ofthe project by the end ofthe growing season following completion of construction. [15ANCAC 02B.0259(10)] 28. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 29. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.OSOb�b)(3) and (c)(3)j: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 30. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hP�ring. Yoi? may obtain thP petition form from the offir,e of Admini�tr�ti��e hearinas. Y�u m�is*.. file ±he �Pti±ion with the office of Administrative Hearings within sixty (ti0j days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal o�ce hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Rob Ridings at 919-707-8786. Sincerely, ��) . S. Jay Zimmerman, Director Division of Water Resources Electronic copy only distribution: Eric Alsmeyer, US Army Corps of Engineers, Raleigh Fie!d Office Chris Murray, Division 5 Environmental Officer File Copy PAT.MCCRORY ;;'. c;�„�„���,� DONALD R. UAN DBR VAART �^ . s�cr�r�Yti� WaterResources S. JAY. ZIMMERMAN ENVIRONMENTAL OUALITY . � - - ' - l)ii'CC(OY N CDWR Project No.c County: APPlicant: Project Name: Date of Issuance of 401 Water Quality Certifcation: Certificate of Gompletion Upon completion of all work approved within the 401 Water Quality Certificafion or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 4Q1,Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center; Raleigh, NC, 27699-16t7. This form may be ret�arned to N�D�,�JR by the a�plicant, the applicant's authorized agert,. or the proj�ct engineer. It is not riecessary to send certificates from all of these. . , Applicant's Certificatiai I; , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to .be built within substantial compliance and intent of the_ 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signatare: Date: ,4ge;�t's Ccrt�frc�ticn I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: . Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date . State ef NoRh Carolina �Envi: onmental Quality � Water Resources 1617 �dail Service Center, Raieigh, North Carolina 27699-1617 .. Phore: 915-807-5300