Loading...
HomeMy WebLinkAboutNCC230668_NOT Closeout Documents_20240510 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Lenoir Project: PNG DIMP CP Section 16 River basin: Neuse Person financially responsible:Piedmont Natural Gas Company,Inc.-Amber Project#: LENOI-2023-008 Lineback,GM Distribution Address: 4720 Piedmont Row Dr,Charlotte,NC 28210 1. Project Location: Cunningham Rd,Kinston Pictures: No 2. Weather and soil conditions: Sunny,warm,dry Initial inspection: no 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one onsite Title: Inspection report: Sent Report Date given/sent: May 10,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self- inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES 10. Comments: General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: May 09,2024 Time arriving on site: 10:50 AM Time leaving site: 11:10 PM CC: