HomeMy WebLinkAboutNCC230505_NOT Closeout Documents_20240508 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 2090 US Highway 70, Swannanoa,NC 28778 (828)296-4500
County: Buncombe Project: South Parking Area-Phase 2-South River basin: French Broad
Person financially responsible:Greater Asheville Regional Airport Authority-Lew Project#: BUNCO-2023-009
Bleiweis,Executive Director
Address: 61 Terminal Drive,Suite 1,Fletcher,NC 28732
1. Project Location: 61 Terminal Drive,Asheville
Pictures: Yes-Digital
2. Weather and soil conditions: wet,rain Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: May 02,2024
9. Corrective action needed:
10. Comments: Project is complete. Site is stable.
Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required. Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Shawna Riddle Others present:
Date of inspection: April 09,2024 Time arriving on site: 11:45 AM Time leaving site: 12:00 PM
cc: