Loading...
HomeMy WebLinkAboutNCC241446_Site Plan or Location Map_20240513 i I ) / I 421 o a _ N I / �., o CONSTRUCTION SCHEDULE \� I ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY Us4/ I.obtain all necessary peanitr and plan appr .Emsn°n and Sediment Conle'o.ISI'po permit and n CeniBcavemge NCGS 113A-54.1°IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR G°4 ? (COC)mast be oN s,s0 bef any land aisMirng activities owns Acopy ofermit me bacon: and aM1die:of the COMPLETED AS AN EXCEL SPREADSHEET. �a[� plan mast be kept on site,preferably in a pebox,and accessible dating ins AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED N G k'/r �E O 2.nsmllgravelctro<litancefire,thefrfrcedltfence \ I I EROSION AND 7rygz7lir Iftl owereand wanes. \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A e g 4 e 3.Fimsn<leadng and grabbing any necessary on melo[s as may are started. \ ` I NCAC 04B.0131 STATES THAT°...DOCUMENTATION SHALL BE ACCOMPLISHED BY OLD US 4214.Begin lot grading and RCevation activities \ I I INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE I.Begnmc°minae with boase construction activities. / \ \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, 0.9 SR 1291 I• 421 b.Finish Al rough grading mid house Constrn.All areas not disturbed fa eeds m lave temporarymanento ti ��egmnndc°v°r installed. I DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, �• a7.Install driveways,walks and patios. //� PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION G S� S.Begin fine grading eflot areas / \ CONTROL PLAN.° .4, SR-1391 9.Final g»sing malchin8 and stabilizing of l mast cases raja will involve on of sod on the lac Thce will \ 5 qremain in Pl»cuntil mein(is sodded or grasis stabiliud and takes hold. / "� \ \ \ \ \ \.+�o n 10.Theconvacmr shall conductself-inepwti°nse erosionandsedimemation cres and complete the fo F "yQ combined self-inspection form found on the DEMLR website m hrys//www.seq.nc.gov/abont/divisionsleneng3•-mineral-and-land-resonmes/atormwamr/stormwamr-pr°graMnpdes-consnucdon-program. \ \ \ \ ` \ SODDING w� °� p ¢ Twelve months of complete inspection forma shall be kept on site and available for inspection at all times.It is recommended CSZ h copy be kept in a permits box.Ref:G.S.I I3A-54.1 through G.S.II3A-57 Sections 15A NCAC 04A0101 though 15A / \ \ \ \ �O 3 CAC WE 0504 General Permit NCO 010000 NPDES for Construction Activities. I) a 'StiOA w� my NCAC far erosion and sedimentation control measures are to be performed A least once every seven calendar days and pp within 24 hours°revery rain event of grater man l inch.Any needed repairs shall be made immediately m maintain measures as / / / \ \ \ \ \ �� FEEFEEEtt IG LAY sou A A STAGGERED L designed.All ESC measures Alan be maintained as specified in the consnucti°e details on this plan.A rain gauge shall be installed A SHARPENED P the project site far man m g. // 1 \ \ \ ���� 121nsp and final acceptanceletters.When the p a complete,the permittees shall contact DEMLR m close out the EdeSC / I\ SITE WP R°0 PlanAxrDEMLRinomsmepm ceofthe ec[cloce vai ectionrcp rep xe allvn osuoTaiMnxams ,,U PYa "degnc.Bov/NCGOI"m submit an electronic N°dce of terminatiuon(e-NO'T).A 8120 annual general permit fee will be charged $32, ° y N g °p0�b9 MP S y1"9 until the e-NOT has been filled out. / / \ INCORRECT - yF'Sry YT �f� Lg 6w.v' b f';d'b \ \ \ 1 \ \ gig�rMnnlaxev CORRECTLY. \ . Q A s° cog \\\ ,�`2T � H16 c�P�,K'L� b Fa \ \ / 3�2 \ • \ �.V�MV•.,.,,II �,����„I ° i A ROLuSh ROLL S.!MEDIATE, all. . 51/ IMO ACHIEVE FIRM COMO' AS NEEDED. TER WELL AS SOON AS THE SOO IS r1. SR1009 Pit o �e,c0M' �N�Pit \ \ \ -/ / / OPEN \ \ ' )(ir \G I I was THE sat.NiAAPPEARANCE OFeGOOD SOD nine 'al.-MEMowea FARRAR Sm oottFs w vb 1 / mil VICINITY MAP%R-241ROAD�Se� �a M SPACE / 17 ) I h��� ���I� II�I a .,qo N.T.S. ' i - I 1_ / �����iOI� ��JI _ n MAD DATE: I PAGE: I �/ / I \ \4�OFgs 15 CON.RUCTION / ) CON LIMITG ION)A I ( / se ---'��i n 4MIrv. �stkT FENCE 1 I Fq\Fed IMITS // /-- - // ) iIIIIIIIII IIIIIIII IIIIIIII;1 ) c L18an I I I I t , F I / / //`RI // 19 / ..A.. I I DATE: PAGE: TaPaFatTF / 12 ° I I MusT eE AT cnc ' r / / CONSTRDCTION LI 5 „EwAs�Eos NE �- 13 / .. I Lot Pl�n14 / / A ® •'B" "C "D' "E 'F•F ••G ry' sWIRE FENCE / ) D Plan / / / 20 / r am A iT- ✓! ✓! % % 10 I D° R n d HARDWARE CLOTH FRONT VIEW �Bua CONSTRUCTION/ I / / I 1f JI G % R e e e e b \ \ LIMITS / I/ J / I / / R Hous 1r ll II' -f Hous Hous 4- Hous �'Hous Hous ROOS .:'.`IFILTER OF A57 L CLOTH INTRENCH \ �\ __ / I / II WASHED STONE I / ) ' // \ / 14, • APART MIN. a FLTER FAan INTO sole ME0CSD I -�� urr- -/ • ryI NOTES l -i=_I _ `� •c ;.43' I ON / / aP.T»T y T� - re ° :;.:I Hardware cloth and gravel should overlay the silt fence at least 12 /\ = 21 "Eo��'<1 al Inches. O ( 1 CONSTRUCTION I n \ 'vo+o .•.; 2.Stone outlets should be placed on low elevation areas of silt fence ^ LIMITS T / LEOW Notes: ....::::s:o:.:.si.a:•f I P ac ^ ".. �I�► JQ (Y I If needeQ Tree Protection ending should be instal-Fie:along the buffer zone wetland and based on field conditions. N / �1�a -_ _ �S 1. 23 ' I •rI 1 bountlary and/or arountl protected trees,providing a adios of at least 1.25 feet for each \EY MAINTENANCE: 00 / aF \ i=I \ leek -_`\ %L: N inch of Vunk over. J of 1.Per NCG-01,Inspect outlet at lest once and after each or q 1'.2i �y� I M4V t rainfall event.Complete d re t I -"Q 2.Install Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown on BURY WIRE FENCE AND FLOW DIRECDo e'oF UPPER EDGE t SILT FENCE HARDWARE CLOTH FILTER FABRIC IN TRENCH' greater rains pee: 11 my. , ` / I hematiGtl tlgM .hediment acdsInches T�T� m II'/ � A' I / �g{��'/+' wLE/s LT socks h ffebIrechlot shltlhave tld Slre Ie de wa[erinA� i 'c Ij sae FENCE ouTteT 3.Install required Silt Fe within 10 feel of line to ensure there Is no conflict with ( 7 n // qu re property \NC Envir t teinut.xyey f - Lot Plan 8 = CONST,RUCTIO 1 CONSTRUCTION ENTRANCE septic system.its thep 'blRy f the bolder to ensure thamtallabon of sediment SILT FENCE OUTLET MMcontrol measures doe p theseptic system and repairarea(a) L - , "F' I '' / LI ITS / I I d.At least one Construct on Entrance/Exit to be-nslalletl per lM CONSTRUCTION ! Lot Ian / / 1 5.Waste bins and other areas dedicated for managing building material waste shall be at LIMITS 1; 6 nIM`,.•aa 1 least 50 feet away from storf.m drain pinlets or da'rnage d riches unless k can be shown that / / no other alternative fdsts b th s s shout on cannot to ach eves these are:web: s must be / 1\ AA coma nod bah ns 5lt Fence ,/ I / / \I I Ay I S Inlets downstream of disturbances should be protected;streets should be swept when DATE: PAGE: 4 I '++11 sediment from the construction activity s present sock/siit wawa S- s / I LL 7.Details for Silt Fence Silt Fence Outlets Construction Entrances and other measures are SOW-+� a rotecte an q� I PICAL LOT LAYOUT WITH ROADSIDE DITCHES II,�nm-llClf II, 1 'V m I I I I I provided on addRanalseta ran nto I d Erosonandaed etcontroldetDe is are notdrew es. W tErrEc•�v� _._- stele 'I. = Stokes ti ''1 - .elf ill tat logs parallel I �• I 2. 2" to the desired eh uniformly win compost : s and a minimum of() I I I I I I 1 DATE: PAGE: SECTION SECTIONgraope. beyond theme ofa m lawS edgeef Me betow flat areas should be sat edge afire I klwatmere sshouIa me tamed Blighty alsm�to \ / I I I I I / a. slit roe(s)g g around the end of I i ilial h,II ,,I 4. Oak or other durable hardwood verUcally plural,through Ole °ro,° GROUND STABILIZATION / amaximum interval of 4 feet'ra°mwd at a SITE AREA STABILIZATION I ( �OaEXCEPTIONS • �• of 0 feet if the silt `"'"' " DESCRIPTION TIME FRAME • I I I1DRAG / �, � ,UNTRENCTo°I N2 he gghht of log st g naa Mn a tit PERIMETER DIKES, 7 DAYS NONEsaMETR aroEwsTAL roN SWALES,DITCHES .... / I 1 QJ ...::a "/Own ••"`ILATIM.ram,.M°wmaLO.oc.,.x.,,w,..",.n,,, sock/wattle to hold it in place during nine eve.. &SLOPES i 1 1 I 1 1 1 1 1 1 1 1 1. Inspect silt sak/wattle A least weakly and after HIGH QUALITY 7DAYS NONE /.������������1 b 1•alPos oar xna aOw RATES taccumumentany WATER ZONES I \ I •'.,� .. •1 1 1 1 I I I I it•1 imrUgend's°�; IA � Oman oe.t� 12 3 E r NE HQw> Z, - a Mln. i i •0(g> a(a0o",m)(so gym)(lag:co) aD SLOPES STEEPER 7DAYS IF SLOPES ARE I T I , y` ifil e.neat Wory I o;m.,n s e °s so r« I`«t Ir�o Irk a THAN 3,1 10'OR LESS IN 1, L1tt - y`�` �s I sock "morn(as1 (lea mil izzs raj I t L `I 1 y',r--`>- �'° /t LENGTH AND ARE C \Wail le re col (",tt (au m) er",njdr°u` 7 u. Is. zz. w. ""getl btlgetl NOT STEEPER II $jle g ix g ,, mix mix gmix 4' nsocks/wattles mai dth eeethTHAN 2:1, 14. nR�: <s, o+l oaa [zalia7. maaaurnn»ea»parmana»Onme awe. a DAYS ARE \ Construction: Mentenance, /m/m) /m/m) /m/m) /m/m) /m/m) ALLOWED I 1 i I \ 1.Cleartheentranceandexit area of all vegetation,roots,antl other objectionable 1.Per NCG-01 Inspect at least once a week antl after each 1 Inch or SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION SLOPES 3:1 OR 14 DAYS 7 DAYS FOR malerialantlprppenygraseR. greaterrainfalllmakeanyrequiredrepairsimmediately. I \ I 2.Place the gravel to the spedifle grade and dimensions shown On the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment -- FLATTER SLOPES GREATER smooth it. from leaving the constmetlon site.This may require periodic THAN 50 N ( 1 \ 3.Provide drainage to tarty water to a sediment trap or other suitable outlet. topdressing with 2 inch stone. LENGTH \ I \ 4.Use geotextilefabrio in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or ALL OTHER AREAS 14 DAYS NONE(EXCEPT subject to seepage or high water table. tracked onto public roadways. WITH SLOPES FOR PERIMETERS ifilri N CONSTRUCTION ENTRANCE/EXIT FLATTER THAN 4:1 AND HQW ZONES) \DATE: Wire Fence Filter Fabrc PAGE:arealPost BMex.smnaemsirengtrebreswlnvnrefenceeMv.Ears atrergt mencwgn°ulserefence Wre Fence Wire Bodckf'oa[rencb \Pactsteel Pgat °r°ug"'y General Erosion Control Notes n- -�mpe 1.Only the are s shown shall be disturbed. ` , PAGE 1 of 2 Plastc air ts Tz Alll dsturbed areas shall be grassed and \ TOTAL DISTURBED ACREAGE: 2.93 ACRES hed as soon as possible and maintained �/ \a;Min. i Pemanent gayer s establshed _ \ OT EROSION CONTROL PLAN \ l LOTS 7, 9, 13, 14 & 18 . tag »n� d - _ - -\ 1 �_\ \ \ I JONES CREEK ConsWcton: Filter Fabric \ \ _� \ \ \ \''' I / I2..Esurethan.hianrobthe`se^men standard a ems; synthetic CROSS SECTION VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTIONI MEADOWS sufficientmay impound volumes of wAer .we) (Higher mn�a 3.Centred the»arely fasten theam tiomxenl la at to ort post of a Met minimum oveineoWhen heneIxttpost, FOR strength to s,efiller bottom of to mash fastened»wrelvmme uentol»adbricon oata.Extend General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on an particular lot do not adverselyaffect anyof the installed erosion control measures.If lot construction dictates,measures will be a.naeare as'nawppnntnlha,plastic mao-men.Fasttn the Wm ed»memoweuP,nanfnbd<onmaapslope 1pro gP Y R� of.fence k:nyea a pairsim ediarey relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. AVID RESIDENTIAL LLC M1o»p0 rtfenes u»E,space posts a maximum of a feet apart Sulpports should be driven 2,should rt.r.,r,c�of alls3,33,3 fence cow,tear,3,3mp3se. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all securelyangthMa m°witharaops gda»noteguireaAremeshsupport.ce.aewr<lr objectionable materials spilled,washed,Dr tracked onto public roadways. UPPER LITTLE RIVER TOWNSHIP HARNETT COUNTY e.Hutto niterrabrie direaly10 posts.wlre orq»0<tip Iles should have a minimam or 50 pound tensile stage vamar«one next as red to or.sael.On the Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure - 7.Ec m y rites wide and e e proposed oneortepostsand a daan.Taxe<arema"mdanearmimrmgtolwmdeaanng that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. SCALE: "-ADC' FEBRUARY 2024 Elea from to ae.reerr°a rat 4i mRernoveSodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Place 12 Inches off atebn°along the bottom and side of the trend". and Ming the area m gedeland stabilslzeln rare contributing 100 0 50 100 200 400 S.Baal.I Ole trench with soil placed over se alter fah.and compact.Thorough compaction°rare badmu is 4 drainage ar»nas been properly Ware., and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. cdt.I to silt fence performa.e.10.°°not anachnnermbncmam s. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MI° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. son Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height Removed ( IN FEET ) ANC-Envirq,men tol.jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 fit. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:2/21/2024 7:18 AM LAST PLOTTED:2/21/2024 7:28 Mu PLOTTED BY.Dennis Gilbert nur000n:G\CURRENT JOBS\A&G RESIDENTIAL LLC\23-285s-08 JONES CREEK MEADOWS-EC\PLANS/ONESCREEKEC-LOT57.9.13.14&18.DWG