Loading...
HomeMy WebLinkAboutNCC231084_NOT Signed Certification_20240506 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOT(Rescission)form. Then,mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy,Mineral&Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor 1612 Mail Service Center Raleigh,NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)[40 CFR 122.22) General Permit Certificate of Coverage (COC) No.: 'cQQ i31 0 A Name of Project: (MOI 'lk 6' 0SSI(j - phase one. - lO S Z( 121 17:112R Per NC General Statute 143-215.6E(i),any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article...shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law,I certify that: I,as an authorized representative,hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true,complete,and accurate. Io Legally Responsible Organizational Entity(must match eNOT): J fl S t ��(�� Q S�a iL S tY ►nvt�S `i IC *Legally Responsible Person(must match eNOT): 0 Y t Cl Yl 'A)Cl t *Title of Legally Responsible Person: pV f S (AMA- Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: U.0.1A16. V)4144. *Signature: Date: SW 7 aet *IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer,or vice president, or a manager that is authorized in accordance with Part IV,Section B,Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.