Loading...
HomeMy WebLinkAboutNCC241403_ESC Approval Submitted_20240509 Steve Oliverio From: Chawla, Sharan <sharan.chawla@deq.nc.gov> Sent: Tuesday, April 23, 2024 4:05 PM To: Griswold Construction Group, Inc Cc: Hufnal,Tyler; Steve Oliverio Subject: Shiled Republic LLC (JOHNS-2024-125) - Approval with Modifications CRM:0210093 Attachments: Certificate of Approval - Tuesday, April 23, 2024 351 PM.docx 0t North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director LETTER OF APPROVAL WITH MODIFICATIONS 04-23-2024 Griswold Construction Group, Inc 2108 Wynnscott Farm Lane Zebulon, NC 27597 RE: Project Name:Shield Republic LLC Acres Approved:3.1 Application ID: PA-004169 Permit Number: JOHNS-2024-0125 Address: Bay Valley Road City: Kenly County:Johnston River Basin: Neuse Stream Classification:C:Aquatic Life,Secondary Contact Recreation, Fresh water; NSW: Nutrient Sensitive Waters Plan Type: New Plan/Commercial Dear Sir or Madam, 1 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee.After the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOlform totheStormwater Program staffin the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Modifications Required for Approval: 1. Show location of rain gauge and permits/record box on-site. The box is usually located at the entrance of the project. (GS 113A-57(3), 15A NCAC 04B .0113) 2. Our office is undergoing an effort to digitize our records and dramatically reduce our collection of papers. With this submittal can you please provide PDF copies of all application documents (the newly revised and previous unchanged documents), and for the physical package only include the following: 1. The original, signed and notarized FRO form 2. A half-size,ANSI B (11"x17") set of plans 2 3. A letter of consent if needed or any other supporting document that has an original wet signature/notarization Your cooperation is appreciated. Sincerely, Sharan Chawla (he/him/his) Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources - Land Quality Section Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Office: (919) 791-4305 I Cell: (919) 608-0049 I Email: sharan.chawla@deq.nc.gov E Q 1 I-EY NOi- Tr I CAfnOUNA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3