Loading...
HomeMy WebLinkAboutNCC241426_Site Plan or Location Map_20240509 o WESTERFELD ESTATES STORM / ESC O n p. LoW EXEMPT SUBDIVISION BUNCOMBE COUNTY uP) 0 W E SHEET INDEX z _ z a0�" r i o -- C-0 COVER SHEET C o ro 1 SITE NOTES: •`hy 9 9 \ I C-1.0 MASTER PLAN 1. PROJECT ADDRESS:99999 NC HWY 9,BUNCOMBE COUNTY,NC • C-2.0 OVERALL EXISTING CONDITIONS 2. TOTAL AGRAGE:236.3 ACRES 3. ZONING:OPEN USE(OU) _ C-3.0 OVERALL EROSION CONTROL PLAN 4. PROJECT PIN NUMBER(S):0636-46-3354 C-3.1 GRADING AND EROSION CONTROL PLAN 1 THESE DRAWINGS ARE THE 5. EXISTING TOPO INFO SHOWN WAS PROVIDED BY:KEE MAPPING&SURVEY PROPERTY OF ONSITE CIVIL 6. EXISTING BOUNDARY INFO PROVIDED BY:KEE MAPPING&SURVEY - C-3.2 GRADING AND EROSION CONTROL PLAN 2 GROUP,LLC AND SHALL NOT BE 7. FEMA FLOOD PANEL:3710062600K REPRODUCED INWHOLE OR IN PART WITHOUT THE EXPRESS 8. RECEIVING STREAM:LAUREL CREEK(9-8,C;Tr),CLEAR BRANCH(9-7,C;Tr)-BROAD RIVER BASIN I C-3.3 GRADING AND EROSION CONTROL PLAN 3 WRITTEN PERMISSION OF (9-(1),C;Tr) I ONSITE CIVIL GROUP,LLC. 9. SOIL TYPE(S):AcD,ArE,DeA,EdD,EdE,EdF,FrA,TaC,TkD,TpD - _ - C-3.6 GRADING AND EROSION CONTROL PLAN 6 0 I i :BE /'A- •6.3 /0.2 - C-3.7 EROSION CONTROL DETAILS 1 11. LA I UP /L•NG T DE:3 . 2.3/-:2.2.1: _ 12. DISTURBED ACREAGE:7.17ac(2.83ac EXIST,4.34ac ADD) / C-3.8 EROSION CONTROL DETAILS 2 / 13 'O I• 0 TR• 'E I W: :U OM: CO /O / C-3.9 EROSION CONTROL DETAILS 3 %�.,,,.,,044i 0 1,. •' r . ' A `G ' VI I: : •t: I / '' /z C-3.10 EROSION CONTROL DETAILS 4 ��r,� Ip a„,� \ ( / I` / C-3.11 NCG01 GENERAL NOTES �FPFrr froaiucte S4 GENERAL NOTES: Mf CHAE y C 4.0 OVERALL SITE PLAN a4/ai/24 1. CONTRACTOR SHALL PROTECT ADJACENT PROPERTIES,THE GENERAL PUBLIC AND ALL OF THE \ / C-4.1 NC.D.O.T.DRIVEWAY PLAN&PROFILE ACCESS A - OWNER'S FACILITIES AND SHALL BE RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES WHICH OCCUR '. lit �DURING CONSTRUCTIONS. y r C-4.3 NC.D.O.T.DRIVEWAY PLAN&PROFILE ACCESS C REVISIONS 2. LOCATION OF ALL EXISTING UTILITIES,AS SHOWN HEREON,ARE APPROXIMATE ONLY.NO .%"'" \ No. DATE DESCRIPTION GUARANTEE IS MADE OR IMPLIED BY THE LOCATION REFLECTED IN THE PLANS.IT IS THE Broad River l C-4.4 SITE DETAILS 1 1/17/24 BCRESUBMITTAL CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TYPE,SIZE AND LOCATION OF ALL UTILITIES AND - C-5.0 OVERALL STORMWATER PLAN 2 2/19/24 BC RESUBMTTTAL OTHER FEATURES WHICH MAY AFFECT CONSTRUCTION OR THE INTENDED FUNCTION OF THE _3 3/7/24 FINAL SUBMITTAL DESIGN.CONTRACTOR SHALL NOTIFY DESIGNER PRIOR TO CONSTRUCTION IF EXISTING CONDITIONS C-5.1 STORMWATER PLAN 1 DIFFER FROM THAT INDICATED IN THE PLANS. 3. NO STREAM OR WETLAND DISTURBANCE SHALL OCCUR WITHOUT A ARMY CORPS OF ENGINEERS C-5.2 STORMWATER PLAN 2 PERMIT. C-5.5 STORMWATER PLAN 5 2 4. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION PROJECT MAP ts CONTROL MEASURES AND PRACTICES PRIOR TO,OR CONCURRENT WITH,LAND DISTURBING C-5.6 SCM DETAILS 1 8 ACTIVITIES. 5. ANY EXCESS CUT MATERIAL DEVELOPED IN THE CONSTRUCTION OF THIS SITE SHALL BE DISPOSED C-5.7 SCM DETAILS 2 a m OF IN AN APPROPRIATELY PERMITTED SPOIL SITE.CONTRACTOR TO PROVIDE PROOF OF PERMITS C-5.8 SCM DETAILS 3 `a 00 a PRIOR TO CONSTRUCTION. v)x Z O 0 6. ANY ALTERATION TO THE PLANS MUST BE APPROVED BY THE PROJECT ENGINEER,OR APPROPRIATE C-5.9 SCM DETAILS 4 Z Q H AGENCY PRIOR TO THE COMMENCEMENT OF WORK. 0 Pa N LICENSES NECESSARY TO ACCOMPLISH THE WORK. Q 7. THE CONTRACTOR SHALL OBTAIN,AND PAY FOR,PRIOR TO BEGINNING ANY WORK,ALL PERMITS AND C-5.13 SCM DETAILS 8 , a W M U N w. 8. CONTRACTOR(S)SHALL BE RESPONSIBLE FOR ADEQUATE SUPERVISION TO PREVENT DAMAGE AND C-5.14 •$CM DETAILS 9 O U o MOVEMENT FROM EQUIPMENT WORKING AROUND CONSTRUCTION STAKES.THESES CONSTRUCTION C-5.15 SCM DETAILS 10 Z 5 Z 44 P STAKES SHALL REMAIN IN PLACE AND BE PROTECTED UNTIL OWNER APPROVES THEIR REMOVAL. i ANY STAKES THAT HAVE BEEN DISPLACED AS A RESULT OF CONSTRUCTION ACTIVITY ARE TO BE C-5.15 STORMWATER DETAILS 1-4 C-) 0 d 0 REPLACED BY A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR AT NO COST TO THE x U �" ER. 1 9. TT Eo OWNENGINEER WILL NOT BE CONTINUOUSLY PRESENT IN THE FIELD,IT IS SPECIFICALLY -AUREL PROJECT CONTACTS W C) 0 Z MOUNTAIN SLNDANCI d UNDERSTOOD THAT HE DOES NOT UNDERTAKE OR ASSUME ANY OBLIGATION FOR SUPERVISION OF PRESERVE CONSTRUCTION,SAFETY MEASURES TAKEN DURING THE COURSE OF CONSTRUCTION, OWNER/ E-1 00 U O WESTERFELD RENOVATIONS,LLC rn Z RESPONSIBILITY FOR SCHEDULING THE WORK FOR INSURING COMPLETE COMPLIANCE WITH THE DEVELOPER: p 3 CONTRACT DOCUMENTS AND/OR ALL CODE REQUIREMENTS,RULES AND REGULATION OF ANY 8500 LONGVIEW CLUB DR.WAXHAW,NC R PUBLIC OR PRIVATE AUTHORITY HAVING JURISDICTION OVER THE WHOLE OR ANY PART OF THE ' 28173 2 WORK.IN ADDITION,THE ENGINEER NEITHER UNDERTAKES,ASSUMES,NOR GUARANTEES THE WORK o AND/OR PERFORMANCE OF THE CONTRACTOR. MARK FICKEN 704-363-0100 ci) eii i p r INSPECTION SCHEDULE: CIVIL ENGINEER ONSITE CIVIL GROUP,LLC F U U P O .. 980 BIRMINGHAM RD,SUITE 501-340 W rn pa Z ccO O 1. NO CONSTRUCTION SHALL COMMENCE PRIOR TO A PRECONSTRUCTION MEETING WITH THE OWNER, MILTON,GA 30004 W Z M O o THE CONTRACTOR,THE ENGINEER,AND A REPRESENTATIVE OF THE APPROVING JURISDICTION. A rn Z cv 0 2. ALL SHOP DRAWINGS SHALL BE SUBMITTED AT OR PRIOR TO THE PRECONSTRUCTION MEETING. JARRETT SENKBEIL,PE 404-822-9147 W F m N 3. ENGINEER TO BE CALLED FOR PERIODIC INSPECTIONS. Broad River �W4 4. CALL ENGINEERING PRIOR TO COVERING UNDERGROUND STRUCTURES FOR FINAL INSPECTIONS. H a U OU W 0 i 5. REFER TO MANUFACTURER'S SPECIFICATION MANUAL AND STATE AND LOCAL STANDARDS FOR `c`` SURVEYOR KEE MAPPING&SURVEY Cl) Cl)Z W ADDITIONAL REQUIREMENTS AND STANDARDS. W a, O Z P.O.BOX 2566 88 CENTRAL AVE 3 a\ a ASHEVILLE,NC 28801 oN gEwRE youKEVIN L.JONES,PLS 2,3 coy o CAUTION!!! n 7t1 �, The locations and elevations of existing N underground utilities as shown on this °� e COVER SHEET /- drawing are only APPROXIMATE. No guarantee O 1 W is either expressed or implied as to the - 9 y completenessnaor o exclusively thereof.r responsible VICINITY M A P ' he .5...n 5 contractor shall be exclusively responsible 24 HOUR CONTACT: - C9 �y for determining the exact utility locations DATE: 04/01/24 m 'O(/NA ONES and elevations prior to the start of construction NOTES: MARK FICKEN ONLY THE SHARED ROADWAY SHOWN ON THESE PLANS IS COVERED PROJECT: 23-o18 o BY THIS PERMIT.ANY DEVELOPMENT OF INDIVIDUAL DRIVEWAYS AND 704-363-0100 STRUCTURES WILL REQUIRE A SEPARATE STORMWATER PERMIT OR If STORMWATER PERMIT AMENDMENT. SHEET: C-p 6