Loading...
HomeMy WebLinkAboutNCC241402_Site Plan or Location Map_20240508 ifiel111...1110Wet .1", .k • .-. : 4b.steriPoilirlinArete4eaa, PROJECT INFORMATIONif DUKE rr� r'�'ih��A��+� DUKE ENERGY PROGRESS,LLC rah 110.1, ib��oo i � � R S. NC 0N ST. ��� ��� DEVELOPER FRALEIGH,:919.NC 27601 4�� rA PH:919.560.2090 PIUIJEGR' FAX:919.546.7175 LOCATION EMAIL:NUWAN.WIJESURIYA@DUKE-ENERGY.COM R( y ® � KABA ILCO CORP A LANDOWNER 400 JEFFREYS ROAD,ROCKY MOUNT,NC 27804 PH:252.446.6869 PROGRESS I DEWBERRY ENGINEERS INC. ENGINEER 4805 LAKE BROOK DR,SUITE 200 GLEN ALLEN,VA 23060 PH:804.290.7957 ROCKY MOUNT - V E P C O BATTLE B O RO PROPERTY ADDRESS FENNER RD&JEFFREYS RD,ROCKY MOUNT,NC 27804 NORTH co SOUTH CAROLINA STATE MAP EXISTING USE VACANT-HAYFIELD PROPOSED USE UTILITY EQUIPMENT AND STORAGE YARD LAYDOWN YARD E X H I B I T PARCEL SIZE 27.76 ACRES EXISTING BUILDING 6 SF NASH COUNTY, NORTH CAROLINA PROPOSED BUILDING 0 SF DEED BOOK AND PAGE NUMBER DB 2633,PG 571 PIN 385112779291 SHEET LIST: SITE ZONING 1-2-HEAVY INDUSTRIAL DISTRICT ACREAGE OF LAND TO BE COVER SHEET SHT 1 OF 13 DISTURBED 12.69 AC OVERALL SITE PLAN SHT 2 OF 13 EXISTING CONDITIONS SHT 3 OF 13 PROPOSED TEMPORARY 9.62 AC LATITUDE: 35.9895° SITE PLAN SHT 4 OF 13 IMPERVIOUS AREAEROSION&SEDIMENT CONTROL PLAN-PHASE 1 SHT 5 OF 13 FINAL IMPERVIOUS AREA AFTER LONGITUDE: -77.7896° EROSION&SEDIMENT CONTROL PLAN-PHASE2 SHT 6OF 13 RESTORATION 0 AC EROSION&SEDIMENT CONTROL PLAN-PHASE 3 SHT 7 OF 13 I EROSION&SEDIMENT CONTROL DETAILS 1 SHT 8 OF 13 RIVER BASIN TAR-PAMLICO : - - S. •- - 4 EROSION&SEDIMENT CONTROL DETAILS 2 SHT 9 OF 13 _ es 0. EROSION&SEDIMENT CONTROL DETAILS 3 SHT 10 OF 13 "I T •- _ FENCE DETAILS SHT 11 OF 13 _ /.., '. NCGO1 DETAILS 1 SHT 12 OF 13 r•. _ --�`•T i�- • - NCGO1 DETAILS 2 SHT 13 OF 13 _4• �,/� - •. -b PROJECT AREA a1 . . -- • PROJECT NARRATIVE - - - THE PROPOSED ROCKY MOUNT-VEPCO BATTLEBORO LAYDOWN YARD IS LOCATED IN NASH , COUNTY,NORTH CAROLINA.THE PROJECT CONSISTS OF LAYDOWN YARD CONSTRUCTION it ACTIVITIES.THE ESTIMATED DISTURBED AREA IS 12.69 ACRES. m z z MIGRATORY BIRD HOTLINE 0 • STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. GENERAL NOTES -. i' CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 e.:.ys .. . 1. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE ?' _ _ - CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, - ; .Q _ 0 EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC T 3 • • - ( ', JEFFREYS ROAD Q 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT - - • , J } Z OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO }a i, - a' SPILL REPORTING HOTLINE REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. f 7 . 1 - IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS 0 _ T 2. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR - + •_ _ _ REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER } SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE 1 :-..4ti ' REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR Q ENERGY. '�- - •-�,t, _o SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS JO 3. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY - -- wl\ 4 _ ci DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF 0 PERMITTING PRIOR TO USE. • 01 1 f �, 2- THE DUKE ENERGY SPILL REPORTING HOTLINES AT: O _ _ --tee fs _ CAROLINAS&MIDWEST:800.527.3853 [0 4. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU a' • _ i. v' {.. r7 FLORIDA:866.769.1266 w OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. ' m 5. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR _ • SURFACE WATER WITHOUT CONTAINMENT. _ _ - _ - ( / _ Oa0 6. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. - - i rY - r-b ` d- ',, O i •� 0 •° ,. CONTACTS w VICINITY MAP OWNER: ENGINEER: DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. z SCALE: 1:600 KHADIJAH HASAN ANDREW DAHLMAN j 411 FAYETTEVILLE STREET 4805 LAKE BROOK DRIVE,SUITE 200 0 RALEIGH,NC 27601 GLEN ALLEN,VA 23060 CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR PH:(336)340-4312 PH:(804)767-4712 (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING KHADIJAH.HASAN@DUKE-ENERGY.COM ADAHLMAN@DEWBERRY.COM UO CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED - • THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA RVo ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER 1, TITLE IMMEDIATELY. ``,4N CARo••, Dewberry® f DUKE ROCKY MOUNT-VEPCO BATTLEBORO pP,OFE,,,�•/,�'�; to LAYDOWN YARD N 7 NCIMORG _2 a SEAL'r• _ Dewberry Engineers Inc. , ENERGY +u„ vn 2610 WYCLIFF ROAD ENERGY® -O•tiQ s' SUITEGH�ONC 27607 LAVER SHEET 4. . PROGRESS PHONE: 919.881.9939 •,, �r r•rr A���•,,, FAX: 919.881.9923 411 FAYETTEVILLE STREET 0 170628C01 04/25/2024 FOR DEP REVIEW RPH AMD AMD NCBELS#F-0929 RALEIGH N.G.27601 SUE DRAWING REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED 4/. /2�24 Dewberry No.50130753 www.dewberry.com TELEPHONE NO.(919)546-2090 D 170628C01 1 OF 13 { I� \\\ FARM LLC / 019036 H REAR YARD SETBACK(10') MINGES L._"'' \ JOHN TJR r 015494 r \ 11 POWELL CLARENC� 1' 111 OH DISTRIBUTION LINE ___ _ — JORDAN \ 1 II ----------_ — 039772 1 11 I --------�� STERHOUT I� MARK C 1 039771 \� 11 li ) �1 1 I REKDH GRANITE I RENTALLLC \ 1 1 i I 039770 �\ 11 I MCLAURYN — \ KABAILCO Ii HOLDINGS I 1 013240 CORP 11 I �CORP O 11 i LLC 036814 1 00" \ 1 ,r• �• ���007 I 037188 I SW ID LEE V 1 wR� w�• .• •� ON DAVID LEE\ � 1 A • 6�-• •�•-„ • 07- I 036813 � 041100100• ••t•At Ora• � � �+� I I i MCLAURYN \ �'• • • :• •�•�•i•i' b6 I SECURITY LIGHT(TYP) HOLDINGS I\ 1 '1 • • • •�• • �/ I LLC a-• • .• • •• • •"Pi wL'�G;�tiQr '4XI 036767 STUBBs !•��s�� wI14• •�I'•:::::::. i•� r•i��• vd�+�oIWILL JR\ \ �a♦ •`• • •�• • •iItC.o3676s \ 1 ���•"•s .�S s 4 �• • 4_•�• _ I a a' 4 .� I \ ' • COMPACT SUBGRADE ON EXISTING GRADE.NO SITE I II 1 GRADING.GRAVEL AGGREGATE DRIVES SHALL BE I Il 1\ r'I O' CONSTRUCTED ON EXISTING GRADE 1 9 li 1lliii I �,`• •a•a•�i`iPi� �• • • :•�•' d it MOBILE OFFICE AND 6' - • • •4•*Mkt/404.4ft I TOILET IN CO BOX , r -• -• -• -• -• ;•.• �• • I • PROPOSED PARKING O � •�•� � �' � TOTAL FENCED IN GRAVEL •�• • I r ( I(20 VEHICLES MAX) nO II �• (PROPOSED IMPERVIOUS.SEE I I tt - DETAIL ON PAGE 2)=9.62 AC • . I .. o • =1•4•4•�• .mowAi-- -1116' 24'DOUBLE SWING GATE _ J I 1 SEE DETAIL SHEET 11 f7 -• ••.• • .• -• /i I r E'% SKIMMER BASI • - I O •V• • •••�i ^• �•vAll •itill ,.r•a• •- :. s Z o - yea / ' , ��6"COMPACTED NASERALLA F� ° ' • � (� • r . ' ' ce ,,, 5 GEOTEXTILE ABC STONE o34944 id SEDIMENT TRAP I I ......:i..:.......,......, 1 _ . FABRIC ��EXISTING GROUND p — L TRAP o 11 I III ....„4.4.1....4.4...r. \ a 11 II ! GRAVEL LOT TYPICAL SECTION . . • •���• NOT TO SCALE SIDE YARD SETBACK(12.6') =ftiliSe4, O I i LEGEND o . _ III- - - - - - PROPERTY LINE mD _• • •••WO�" �•`•4/1 II } _ ^•`•�•L'• • - O SIDE YARD SETBACK(12.5') Z EXISTING TREE LINE — I\ <o� �: . • • • • i I 1 NOTE: o THE EXISTING PARCEL IS CURRENTLY ZONED 1-2 } LOD — LOD — LOD — LOD — LIMITS OF DISTURBANCE �`_ 1QD- o �I : I (INDUSTRIAL HEAVY) DISTRICT.THE LOT SETBACKS a �� I UNDER ROCKY MOUNT, NORTH CAROLINA-CODE OF °� 1sa,/ \I ORDINANCE APPENDIX A, CHAPTER 6, SEC. 601 ARE w ❑ ❑ 8' MESH CHAINLINK FENCE JEFFRErsRDISR- _0 ° • 0 0 8'CHAINLINK FENCE YELLOW " - _ -----_____----- to- g LISTED BELOW. I TRANSPORTATION ` _ FRONT YARD _` OHE OH DISTRIBUTION LINE 015162 SETBACK OHE` SETBACK TABLE: O r w EXISTING CONTOUR SETBACK DISTANCE (FT) 1< - JAMES BRIAN z — THOMAS FRONT 25 Z 014461 7- - - - PROPERTY SETBACK LINE ° • SECURITY LIGHT \ SIDE 12.5 CONSTRUCTION ENTRANCE _ REAR 10 8 ilk VIEWPORT 1 T7L,,,�N CARo'' Dewberry® �� DUKE e ROCKY MOUNT- WN YARD BDTTLEBORO O; '''8/p'�'b': irt LAYDOWN HORIZONTAL GRAPHIC SCALE _ ;'SEALS, = Dewberry Engineers Inc. t, ENERGY 100 0 50 100 200 400 2610 WYCLIFF ROAD :�4y+0 E SUITE 410 OVERALLS1 EPLAN RALEIGH, NC 27607 PROGRESS , ` PHONE: 919.881.9939 �s' FAX: 919.881.9923 411 FAYETTEVILLE STREET 0 170628C01 04/25/2024 FOR DEP REVIEW RPH AMD AMD (N FEET) ,'rrr a NCBELS#F-0929 RALEIGH N.C.27601 REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED 1 inch=100 ft. 4/ /2 24 Dewberry Project No.50130753 www.dewberry.com TELEPHONE NO.(919)546-2090 SEE D DRAWING 170628C01 s"`2 OF 13