Loading...
HomeMy WebLinkAboutNCC241415_Site Plan or Location Map_20240508 I vase A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY 5a-' / \ \ \�/ NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 4 ® / / ` \ -1 �� �\ \ \ \ CONSTRUCTION SCHEDULE COMPLETED AS AN EXCEL SPREADSHEET. ��� �� // Ob... l ryce r andP approv Erosion vaSediment Cov rol(e&6C)p rut a nfcate of Coverage AN ALTERNATIVE IS TO MAKE NOTATIONS ON HE COPY OF THE APPROVED / \ \ \ \\ (CIJC)must be obnmed before any land permits b activities occur.A copy in the ion. permd,the COC and a Fab copy of the EROSION AND � :ITmit,be construction Prefmblyina pmmim bencendecforcededudng ivspectivn. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2. tnd)attles tiov evtmtrces£I,Nm si¢Gmws,re road silt fierceNCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY 1\ / endwames. INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE _ aeg o1 �/ \\ 3. sh earing and grubbing any necessary areas on Ne tors as they are started. APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, "0 / / \ 1 / \\\ - 4. n grading avd exravedon ectivites DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, �Fo'� /� \ iiv ctrnevue w•im House<ovswc' PRACTICE ORDEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION $' S4A.0 10 IN!I0N L 6. sh :ii grading and mist ii B7 lions All°rcas nM..m,M rot]days news m M1ave temporary or pelmwimt CONTROL PLAN." �b ° • ,• p° 9 \\�\� gmmmoyerinaalm. .InsWlddveways,gragsandpahou _ \ 9.Final gaeemg,mulcM1ing and stabilizing of lot In most cases this will involve the installation of and on the lot.The silt knce will iv place writ the lot is sodded or ffiassNg is swbilizea aM u+kes bold. o'CO \ \ lo.TheconlrsemraM1ellconductself-InspectionsofNeerosioneMaedirmnmtioocootralmwauresendcompemMefollowing SODDING 9 combined self-inapeosion form found an Me DEMLR websim • �� / \ \\ �_ _hens://www.deq.nc.ov/abouUdivisiovs/energy-mineralaod-laud-rcsomcd/stormwaer/smrmwamr-pro®vm/vpdes-consvucnov-Pm®am. V• \,.... N lve mon.of complete inspeNon forms Mall be kept ov site and available for inspection all times.It is recommendeda .// \\ copy be kept in epermrrs box.Ref.OS.IIJA-56.1 tM1raugM1 G.5.113A-Sl Sections ISA NCAC O4A 0101 tM1rougb ISA7 NGC 04E.0506 Gearel Permit NCG 010000 NPDES fire Coosavctiov Activida.II _ Il.Self-inspections for erosion and sedimentation control measures are to be performed atlme[once every seven calendar days and •^'•' NOT OVERLAP.',SHARPENED '''.,1 within 24 M1oars of very min event of greater Nan 1 inch.Any named repairs Mall be made immediately m maintain measures as .7.1.13p G \ \\ design..All ESC measures shall be maintained as specified in the construction details on Nis plan.A rain gauge shall be installedat the Egos a,0rai«rairvo maces. SR-1215 OgL2pWAYRO� 7, I I 6 S 12.Ineputiunand firnit site raccepmviceglettere.Whin Me project complete,Weperm ttees shall comam DEMLRmcloeeom Me P�3C M 1 act is i lila sUTRNG-Aso.ENOS RR-+SIP t'+ / I I I \ Lot Plan / PIay.ARe-OThas wfotms the duermittee of the project close out,via inspection report,the Petmittee shall visit E - o. I / "deg nc BovMCG01'm submit an electronc Nonceaftermination re-NOT).A3120 annual general permit fee will be chargedOr.rN Inn v, s I / l until[he eNtYl'has boon filled out • SITE s �' I ,( 1 ( Li- _ _ _ _ \ Lot Plen / / 0 5� __ _ _ \\ _ Ca�eA /C• TRUCTION h o w e aW \ s MITE �d ^ _ _ \ / 15 / e co \� / err iml aGLL anlMxroMOW WHEN THE SOO IS hm - �, MTEL.TDr6a .a _ - wanRMetr AeT EE P n.a a. w.Rw a'� - o �o \ \ �/ SPACE \ N 4 J •�" tl4c / Wax"NESOIL ulD�nnry Aa r«e eon la Nox teal. eMnwea o < Sptga ,..1 • \ \ / - J I RANGE °s°°,s"wOD .. • OF GOOD S .1 III I 61 / (,, , i1/ VICINITY MAP;' \� \ _ ppp,,,/ r \\ CONSTRUCTION 44411111111' uw UiO1SMIX °Oar N.T.S. / \\ ` /J �/� --� va\ 24 23 , LIMBS qp .�:.�: wsmmmx. umsew°,nn, / \ Lot Plan G)� DATE: PAGE: r�' Au • 2rj {`\� / V DATE: PAGE: s LT FENCE MIN / \ I , / 26 \ hP l 64 Y Dy i II II II II II I11111I,1 ,° ' _ ( a D E .F� �G' H _ • /�330 I ' I I 20 ) / 1 4 G t6 1 1 , , : I ✓! ✓! % % I � � / (411/fr l / t 33 '1I~ I4 4 4^ R I .1-- ce % 4I � _\ // ' / Ohs xl 19 ¶ 611: � HODSHOUSE ISTEEL FENCE POST RDwWIRE AREaLa H RaNTvI w \\ /� \ 4 27 SeeG / : ' aA.l =era JL_" L� 11TI Y L t,. Av kDA1i �. T ��IROA J�ANR E \ � /� I JOB, / �aR 'AvLEDGEOFCURe Notes AY RFILTER 0.57wnsneD srorvE •� Irvro soupGRouN cLOTN IN raeNeN \�� // / }5N- \ V \ / ije / JaINLEr1.Ifneadetl.Truer arou protecied should minding ed emus the buffer zone,wetland I� \ / / / bountlary antllOr arountl protected trees,provitling a radius of et least 1.25 feet for each ;f .i M. // LEGEND inch of tank tliametergg I 3.FILTER FABRIC NOTES: I TE MIR rLD A DWAR / \ 292.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on '''a,,•••s ON GROUND / 6GhematiGtl'a dheld ed rid,if necessa for points.If l0t6 are •cr 7 I 1.HaNware cloth antl gre�el shoultl oveday Ne silt fence at least 12 \ / / / / N gram e j nda ld a ac la shat low,;:t: contiguous and have diRerent land owners or builders,each lot should have indlvldual Slk. oba� ftiI Inches. I / / / / ® Fences....::iL:o°:.t.:•11I 2.Stone outlets should be placed on low elevation areas of silt fence 3.InstallrequiredSilt Fencewhin10feetofpropertylinetoensurethereis noconflictwkhand based on field conditions.HARDwnaE CLOTH I\Rv I 30/ / cuRB INLET CONSTRUCTION ENTRAId septic tleast ne Co st the responsibility of xit into beer to talled re the installation of sediment MAINTENANCE: / � centrl measures does not impact the septic system and repair area(s). BOR./VIRE FENCE AND OF 1.Per N r tarot Inspect outlet le lest once a week and after each 1 Inch or I /. ry /.At least one Construction Entrance/Exit is to be installed per lot. FItrER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. 5.Waste bins and other areas dedicated for managing building material waste shall be at 2.Freshen stone when sediment accumulation exceeds 6 inches. �Wry/ 7 / I/ 1 least 50 fact away from storm drain inlets or drainage ditches unless it can be shown that 3.Keep mesh free of debris to provide adequate flow. // / ,9/ - o other alternative exists.If this separation cannot be achieved,these areas must be 4.Remove sediment when half of stone outlet is covered. \\// / A �- COnteined behind Silt Fence. 5.Replace stone as needed rofacilitate de-watering. ` 6.Inlets downstream of disturbances shoultl be ANC-Envirpu veil ui./pay SECTION VIEW / / / / / / protected;streets should be swept when L. J SILT FENCE OUTLET / / sediment fromthe.nstracbnnactivityispre6ent. `� / / / RUCTION -_"-''NC-En eTE-1ental.jpeg ].Details edon a Fence,ional sh Fence osionOutlets,d sediment EMmncas and other measures caare MITS provided on additional sheets.Erosion and sediment control details are not drawn[o stele. \ // /\ / °T€11:12.'202E TYPICAL LOT LAYOUT WITH CURB AND GUTTER \ // / / / _� \ DATE: PAGE: �\ / � ' 35n "4/ / ' ti I 55 \40 • DATE PAGE: S S t S k/Wattle Silt S k/Wattle OTE, I \ aSI Area to. 1. ONer materiels providing equivalent protection I ,1,.' / Oa -�ROWZ� - b` -11 I as - - may be sunstmee far / I \ CONSTRUCTION =:: DTI II'I I.. c - s. ' I / / �J,fO�� LIMITS ,O�G so'4k.., _ I ro / Holt.II, z. g...iv varnce1,1 OPEN o J 2 2 +T 2 2 m )s Mn legs tloaUtleMm. 356 O • SPACE ,�. / Q h,' Stakes Stokes 3. () a be ran he parallel m -reu SECTION SECTION a,„e;s�l�a�o GROUND STABILIZATION flat are.should be lo.ted at the edge.the rJG ti / / ,. land disturbance.T.ends of the sin SITE AREA STABILIZATION a , y 40 A,04 �a 004. (1 N DESCRIPTION TIME FRAME EXCEPTIONS / / / ...‘,1,-. - :- te t l PERIMETER DIKES, 7 DAYS NONE QJ 6 Mn "`-11 ' }F`l� III, Ill din.x2- SWALES,DITCHES U ZA }'= • 'ri titi W W v°"' NN &SLOPES ~r _ir�a.' '� 3 / \ ti• 4 'ilr� m n HIGH QUALITY 7 DAYS NONE / - - -`hhr} ' Tr°"`" Mn a 8 feN it.silt `"'"° b WATER ZONES Wood Much or eom st ground A To 1/2 height of log 5. n the event staking is no - I- (HOW) 65E Construction: Maintenance. urvTRENCNED INSTALLATION 9ocRs'"""I`-s`f used° g j inspect et least once a week and after each 1 inch or ENTRENCHED INSTALLATION. pavement) 1.Clear the entrance and exit area of all vegetation,rook,end other ob ecfonable 1 Per NCG-01 '""°"`""�`""°""°'°.m:w,.m.««a"'"'�""""' nereted mks all be reaa'gro°eve..v..behind the silt SLOPES STEEPER 7 DAYS IF SLOPES ARE 60 material and propedy eradeT greater alnfell;make any raga red repairs immedla[ely ISOMETRICv VIEW THAN 3:1 10'OR LESS IN 2.Place the gravel to the speclfic grade and dlmenslons shown on the plans,and 2.Maintain the gravel pad lnacontlition to prevent mud or sediment +. ve LENGTH AND ARE smooth it. eom leevingtheconstraction site.Thismay requireau periodic pr, 0 MAwTENANCE: 3.Provide drains a to ca water to a sediment tra or other suitable outlet. to r with 2 inch stone. Inspect silt sacktwanle at leaatweeay one COMPOST s«a INma FLOW RATES aeon,inm o,gemer reinfall.Rem°.` NOT STEEPER I a try p pa cooing M"ten°r compost ace"mulama seaimem aria any aenrls as I,61 4.Use 9eo[extile fabrics in order to improve stability of the fountlation in locations 3.Immetliately remove all ob t ble materials s II tl,washetl or mr unae°mea sorka a«°voet ark al"`" lz rim le rum neaaea m°nor,m,°sec"ate now. THAN 2,1, 14 ..._--- ----.--- iec ions Pie SnortFl Pr°t`U`e Dxe::D�mmes« �R0) (searim)((.,,n, (s0,.,, rim) s. anlemuUborsplacsadNoggeaw DAYS ARE / subjacttoseepageorhighwatertable. trackedOnbpublicroedweys. ALLOWED oak/n eu(=o i :' ivarmi 1"° tf«° tr:« a SLOPES 3:1 OR 14 DAYS 7 DAYS FAR 35aD �. CONSTRUCTION ENTRANCE/EXIT work Area worth (aofi m) (see m) (ado m1 - FLATTER SLOPES GREATER m�o'�rze. ]:n r;in a,m n ..," ,....n s. sn:L.,*a ,ma>sn ee°la:r.uell°N THAN 50'IN \ I/�/0) lit/0) Lim/m) /m/m) Lim/col measureeeesn�en°ce ma�mlive�eolrreae ° LENGTH ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ \ PA GE 1 of 2 L SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH OT SLOPES FOR PERIMETERS �� FLATTER THAN 4:1 AND HOW ZONES) \ DATE: tare FenceFilter Fabric PAGE: __ OPEN \ TOTAL DISTURBED ACREAGE: 1.84 ACRES areal Posl� nmax E.strongmsienb„iIcOvauowm,re fence sero wee Fence 'Wire Boekfill trench \/ SPACE LOT EROSION CONTROL PLAN ' I LOT 35 Steel Real _ thoroughly General Erosion Control Notes CAROLINA CROSSING -� 1.Onlythe areas shown shall be disturbed t te-z4^ uwm 2 All disturbed voero Or 1} Drees shall be grassed and J PHASE ONE Wee ties by,�; mulched ass as posestablished. ible and maintained \ T / • until pemanent cover tablshed \J ` AND 1. „ tat g enm ' LOTS 5 6 & 18 / CAROLINA CROSSING ConsWUion: 1 Filter Fabric I t 2.T Construct are iaenobtheeseament standard a e�^ abo`gthearorin RGaaaEGEG"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION PHASE TWO sufficientmay impound volumes of water m.. (Higher mnma 3.Construct the cuvth°r ol laupoNtiueinowhen h joints FOR securely emdtona support post of a em minimum avoid enp>. strength marker.bvvnre mean nannedsemrely to the uPalnl.aide ofine Posts.Extend General-All measures will be inspectedeed corrections made after runoff producing rainfalls, per weekanypa yany a..Mre standard to ate bottom of the ken..Fasten the aro alnmrcement,then fabrin on the uPsloPe , pro g rain a s,or at least once minimum.The builder will insure that the construction activities on particular lot do not adverse) affect of the installed erosion control measures.If lot construction dictates,measures will be R. side of the fen. at once repaln immediately. relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. A&G RESIDENTIAL1 LLC M1°suPO rt fenceeis used.space posts a maximum of a feet span supports should be driven 2,see,.atne°Nbr,of ellseUmeN fence collap,tear,decompose, Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all securelys.g""MIte'°neecwim 5roo P st;pecl;gdoea not require aAre mesh support ten.Bec,r objectionable materials spilled,washed,Dr tracked onto public roadways. QUEW H I FFLE TOWNSHIP HOKE COUNTY e.kBtentneHterfabricdirectlytoposts.WereorNestsalpIlesshoulehaveaminimumof50poundtensile ,m,gevamar«thenetrainandreaceor.saoreontthe SiltFence-Sedimentfencesshouldbeinspectedatleastonceaweekandaftereachrainfallevent.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure ALE: 1n=100' APRIL 2024 7. voaan m y nines Ode Mod a inchesdeep e proposed line of tents.aria 3 deea°emm°M°°fin°"°'e undermining me future aunn9 that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. `SC'Exca rah ahem apmtrM nl di Rernove Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Place Inches of°i°ba°alonglhe bottom and sloe of the trends and bring theaea m greaeland stabilslzeln after the contributing 100 0 50 100 200 400 soil placed over me filter fa,and compere.Thorough compaction of me bedmu is r. d drainage area has been properly stabilize, and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. oonmto silt scnenermbn0m nce performance. s. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be MI ° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 'sdn Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) .ANC-Envir,,mentol.Jpeg� SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE lfF-0106 LAST SAVED:4/11/2024 12:50 PM LAST PLOTTED:4/11/2024 1:29 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\A&G RESIDENTIAL LLC\23-2855-02 CAROLINA CROSSING-EC\PLANS\CPROLINAXIN EC-LOT55,6.18&35.ceG