HomeMy WebLinkAboutNCC241284_Site Plan or Location Map_20240507 F)
M
. ...
ce
SITE DEVELOPMENT PLANS la
IQ
0. C
moo+
.� U S 2 am
d o a
.In• a) -0 la-,..
z'
FOR 61 w = t-
T
~• .—
s
ALBERS GUEST d
gillM
I
Q
U Z
J
MOUNTAIN BASE, LLC J ,
U) a 0
W LJ = 2
Cr) D to ~
MR. NATE ALDERS < 0 5
0 Z
m
U) I— z
zm ID >-
P. 0. BOX 1909 Q CO m
I— _I < o
zQ
JUPITER, FLORIDA 33468 0o
U
MARCH 8, 2024
1 I-
I1 I I
GENERAL NOTES
III
1. THE PROJECT IS NOT LOCATED WITHIN A 100—YEAR FLOOD HAZARD AREA. �— •�". s ,ti — i' to a- C
2. THE LOCATIONS OF KNOWN UNDERGROUND UTILITIES ARE SHOWN IN AN Sheet List S t Table
b I e
APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE i Sheet No. Sheet Title
OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT '§A -
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO .'�4` \ f C-1 COVER SHEET U
BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE + �`!► C-2 SITE PLAN
OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE t `` ��►` 1 9, Y
ANY AND ALL UNDERGROUND UTILITIES. �® �`- J , ` C-3 GRADING PLAN
3. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION PRIOR TO CONSTRUCTION ��®. ®� � � , ., , —
AND MAINTENANCE/REPAIRS DURING CONSTRUCTION OF SEDIMENT CONTROL . 4 4—t. , % C-4 UTILITY PLAN
MEASURES AS REQUIRED TO RETAIN ALL SEDIMENTS AND EROSION ON THE SITE �.�, 1►`�
4 fa t
OF DEVELOPMENT. THE PROVISIONS AS SHOWN HEREON REPRESENT THE MINIMUM ��� ���� g\� C-5 EROSION CONTROL PLAN
EROSION CONTROL MEASURES TO BE TAKEN. "!� ! ��
C-6 EROSION CONTROL DETAILS
4. CONTRACTOR SHALL NOTIFY EXISTING UTILITY OWNERS OF ANY WORK INVOLVINGti hwo . p . -
THEIR FACILITIES AT LEAST 72 HOURS IN ADVANCE. Ra PROJECT SITE �o C-7 NCDEQ EROSION CONTROL NOTES .0,
5. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH d 4 e
SHOWS AS BUILT CONDITION OF ALL WORK. THESE RECORD DRAWINGS SHALL BE t er �" ;;.i C-8 NCDEQ EROSION CONTROL NOTES Revisions
SUBMITTED TO THE ENGINEER. � = "
6. ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION WILL BE REPAIRED BY F` ie § '+ ' ' °. C—J SITE DETAILS Date Description
THE CONTRACTOR PRIOR TO FINAL "AS—BUILT" SIGN—OFF FROM THE ENGINEER OF B
RECORD. i. � .
7. NOTIFY NORTH CAROLINA 811 CENTER 48 HOURS IN ADVANCE PRIOR TO DIGGING b `�`bt .��
WITHIN R/W; 1-800-632-4949. d r ', I ti -
8. NO DEVIATIONS OR REVISIONS FROM THESE PLANS BY THE CONTRACTOR SHALL BE ,;t,i, - a �L4I i
ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE DESIGN ENGINEER. �' Designed By
9. CONSTRUCTION SEQUENCE: D P J
9.1. INSTALL SILTATION FENCE WHERE SHOWN. ' i Drawn By:
9.2. INSTALL TRAFFIC CONTROL MEASURES WORK ZONE BY WORK ZONE. r ;y � _ D P J
9.3. INITIAL CLEARING — REMOVE TREES, SHRUBBERY AND OTHER ITEMS SHOWN ON -', y; �'. ` -4 Checked By:
DEMOLITION PLAN. D P J
9.4. INSTALL UTILITY IMPROVEMENTS.
9.5. CONSTRUCT NEW ROADWAYS AND PRIVATE DRIVEWAYS. Job No
9.6. INITIATE LOT GRADING AND EROSION CONTROL FOR LOTS ON AN AS NEEDED 230014
BASIS. Date:
9.7. CONSTRUCT RESIDENTIAL UNITS. V C N ITY VAP 3/8/24
9.8. STABILIZE AND LANDSCAPE DEVELOPED LOTS AS WORK PROGRESSES. SEE
SEEDING SCHEDULE ON EROSION CONTROL NOTES/DETAILS — SHEET 9. Scale AS
ca eAS SHOWN
Sheet No.:
c — i