Loading...
HomeMy WebLinkAboutNCC241284_Site Plan or Location Map_20240507 F) M . ... ce SITE DEVELOPMENT PLANS la IQ 0. C moo+ .� U S 2 am d o a .In• a) -0 la-,.. z' FOR 61 w = t- T ~• .— s ALBERS GUEST d gillM I Q U Z J MOUNTAIN BASE, LLC J , U) a 0 W LJ = 2 Cr) D to ~ MR. NATE ALDERS < 0 5 0 Z m U) I— z zm ID >- P. 0. BOX 1909 Q CO m I— _I < o zQ JUPITER, FLORIDA 33468 0o U MARCH 8, 2024 1 I- I1 I I GENERAL NOTES III 1. THE PROJECT IS NOT LOCATED WITHIN A 100—YEAR FLOOD HAZARD AREA. �— •�". s ,ti — i' to a- C 2. THE LOCATIONS OF KNOWN UNDERGROUND UTILITIES ARE SHOWN IN AN Sheet List S t Table b I e APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE i Sheet No. Sheet Title OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT '§A - LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO .'�4` \ f C-1 COVER SHEET U BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE + �`!► C-2 SITE PLAN OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE t `` ��►` 1 9, Y ANY AND ALL UNDERGROUND UTILITIES. �® �`- J , ` C-3 GRADING PLAN 3. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION PRIOR TO CONSTRUCTION ��®. ®� � � , ., , — AND MAINTENANCE/REPAIRS DURING CONSTRUCTION OF SEDIMENT CONTROL . 4 4—t. , % C-4 UTILITY PLAN MEASURES AS REQUIRED TO RETAIN ALL SEDIMENTS AND EROSION ON THE SITE �.�, 1►`� 4 fa t OF DEVELOPMENT. THE PROVISIONS AS SHOWN HEREON REPRESENT THE MINIMUM ��� ���� g\� C-5 EROSION CONTROL PLAN EROSION CONTROL MEASURES TO BE TAKEN. "!� ! �� C-6 EROSION CONTROL DETAILS 4. CONTRACTOR SHALL NOTIFY EXISTING UTILITY OWNERS OF ANY WORK INVOLVINGti hwo . p . - THEIR FACILITIES AT LEAST 72 HOURS IN ADVANCE. Ra PROJECT SITE �o C-7 NCDEQ EROSION CONTROL NOTES .0, 5. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH d 4 e SHOWS AS BUILT CONDITION OF ALL WORK. THESE RECORD DRAWINGS SHALL BE t er �" ;;.i C-8 NCDEQ EROSION CONTROL NOTES Revisions SUBMITTED TO THE ENGINEER. � = " 6. ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION WILL BE REPAIRED BY F` ie § '+ ' ' °. C—J SITE DETAILS Date Description THE CONTRACTOR PRIOR TO FINAL "AS—BUILT" SIGN—OFF FROM THE ENGINEER OF B RECORD. i. � . 7. NOTIFY NORTH CAROLINA 811 CENTER 48 HOURS IN ADVANCE PRIOR TO DIGGING b `�`bt .�� WITHIN R/W; 1-800-632-4949. d r ', I ti - 8. NO DEVIATIONS OR REVISIONS FROM THESE PLANS BY THE CONTRACTOR SHALL BE ,;t,i, - a �L4I i ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE DESIGN ENGINEER. �' Designed By 9. CONSTRUCTION SEQUENCE: D P J 9.1. INSTALL SILTATION FENCE WHERE SHOWN. ' i Drawn By: 9.2. INSTALL TRAFFIC CONTROL MEASURES WORK ZONE BY WORK ZONE. r ;y � _ D P J 9.3. INITIAL CLEARING — REMOVE TREES, SHRUBBERY AND OTHER ITEMS SHOWN ON -', y; �'. ` -4 Checked By: DEMOLITION PLAN. D P J 9.4. INSTALL UTILITY IMPROVEMENTS. 9.5. CONSTRUCT NEW ROADWAYS AND PRIVATE DRIVEWAYS. Job No 9.6. INITIATE LOT GRADING AND EROSION CONTROL FOR LOTS ON AN AS NEEDED 230014 BASIS. Date: 9.7. CONSTRUCT RESIDENTIAL UNITS. V C N ITY VAP 3/8/24 9.8. STABILIZE AND LANDSCAPE DEVELOPED LOTS AS WORK PROGRESSES. SEE SEEDING SCHEDULE ON EROSION CONTROL NOTES/DETAILS — SHEET 9. Scale AS ca eAS SHOWN Sheet No.: c — i