Loading...
HomeMy WebLinkAbout20140090 Ver 3_20140090 Ver 3_NOD response to Amy Chapman_20160115_20160115Transportorton January 15, 2016 Mrs. Amy Chapman Transportation Permitting Unit Supervisor NCDENR-DWR 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Notice of Deficiency, dated January 8, 2016 Winston-Salem Northern Beltway Eastern Section U-2579B, Forsyth County DWR no. 2014-0990 v3 Deaz Mrs. Chapman: PAT McCRORY Gwernor NICHOLASJ.TENNYSON Srrmlary We received the Notice of Deficiency (NOD) regarding a violation to the 401 Water Quality Certification (WQC) No. 3987 issued to the North Cazolina Department of Transportation (NCDOT) dated January 8, 2016. The violation referenced condition no. 21 of the WQC 3987, which requires NCDOT to use Best Management Practices to protect surface water standards. Following the violation, NCDOT project personnel immediately shuf down all work on the project not related to erosion control. The project remained shut down until a mandatory meeting was held on January 12, 2016 with NCDOT project personnel, Dragados-USA, Inc. (prime contractor) and subcontractors including foremen, superintendents, and management. NCDEQ-DEMLR staff, Mr. Tim Latham, also attended the meeting. Dragados-USA, Inc. was reminded during the meeting that this was the second notice of deficiency (NOD) on this project. Dragados described measures that were put in place following the first NOD that included but were not limited to posting signs not to enter permit areas without approval. Erosion Superintendent, Mr. Roger McNeill, was to be informed of any work/activiTy that took place in permitted azeas. After Mr. McNeill denied a request to work in permit site 2, another superintendent directed a foreman to complete the work anyway, without approval and i� violation of 401 Water Quality Certification 3987. This superintendent was relieved of his duties by Dragados-USA, Inc. NCDOT advised upper management from Dragados-USA, Inc. that another incident like this cannot be tolerated and that a future occurrence will result in significant consequences for Dragados-USA, Ina. DIVISION OF HIGHWAYS DIVISION NINE DIVISION OFFICE 375 SI WS CREEK PARKWAV, WINSTON-SALEM, NC 27127 PHONE (33fi) 747-7800 FAX (336) 703-6693 Mrs. Amy Chapman Page 2 January 15, 2016 Dragados-USA Inc, along with Mr. Phil Suggs, NCDOT Roadside Environmental Field Operations Engineer, is continuing to conduct training on NCDOT's Best Management Practices. We have attached a copy of the commitments that the contractor made following the meeting to alleviate the concerns associated with the NOD. If you have any questions or require additional information, please contact myself or Amy Euliss at336-747-7800. incerely, .\ • S. P. Ivey, P.E. Division Engineer SPI/scb Enclosures: Response letter from Dragados-USA Inc. and supporting documentation ea Mike Holder, P.E. Chief Engineer Don Lee, CPESC, State Roadside Environmental Engineer Dave Wanucha, NCDWR JoseIgnacio Martin Alos Tim Latham, NCDEMLR Jeremy Guy, P.E., NCDOT Division 9 Resident Engineer John Thomas, USACE Phil Suggs, NCDOT Roadside Environmental Amy Euliss, Division Environmenta] Officer DRAGADOS USA January 14, 2016 North Carolina Department of Trensportation Division 9 375 Silas Creek Pkwy, WinsFon-Salem NC 27127 ATTENTION: S.P.Ivey Division Engineer SUBJECT: LETTER DUSA - Q03484.003; Respanse to Notice of �eficiency Dear Mr. Ivey: I am in receipt of the Notice of Deficiency issued to the Department by the North Carolina Division of Water Resources (NCDWR). Dragadas wants to start 6y extending our apolagies to all the Department and NCDWR. Since we received the first NOD in August 2015 Dragados has been implementing the committed corcective action plan to avoid occurrence of any other violation. The current procedure established for any and all employees working in our project includes: • Initial Erosion Control Orientation • Certified Level II Erosion Contral foremans for all the crews. • Continued Training from our Erosion Control Supervisor, Mr. Roger McNeii • Mr. McNeil has got authority to stop work at any given time for any Erosion Go�trol related mal praxis. • Any and all crews and subcontractors wanting to work on a permitted area need to fill in a permit request wfiich is revised, discussed and approved by Mr. McNeil before the operations start. • Special signing has been installed in all the permitted sites to enforce the permitted areas. • After rain events we pair up our foremans with the NCDOT Project inspectors ta expedite inspection and be able to address any potential issues sooner. We believe this also helps the foremans acquire even more awareness of what needs to be taken into account when inspecting EC devices. This Corrective Action Plan implemented since earfy September has been working through the last months in which we had a considerable amount of re1n. This occurrence is due to a unilaieral decision by one of our employees who was directed not to remove or modify ihe BMP's in piace. This employee has been removed from the company. Since this occurrence we have already had meetings with all the staff and made them, once again, aware of the zero tolerance policy for Erosion Control. Dragados USA — Winston Salem Northern Beltway Project 775 Robbi�s Perch Trail, Kernersville NC 27284 DRAGADOSUSA We believe that this action will help the rest of the project personnel to be aware of how seriously Dragados takes Erosion Control into consideration. We want to ensure that any employee in the Project has got access to Erosion Control Specialists at any given time and if they have any question or doubt about how to proceed. Therefore, and hoping that th{s will help monitor and control every individual even more, we will impiement the "Erosion Control Hotline [ards" which will be handled to every employee on the project. Basically, these cards will have the phone number of the lead EG Supervisor, the NCDOT Head Inspector and the NCDOT CEI Lead inspector for Erosion Control. We will ensure that all the employees have access to them if they have any question/toncern about Erosion Control while we continue their treining to ensure EC awareness. On top of this, Mr. Suggs will be coordinating additional training for all the employees with Mr. Mc Neil so that the continued education is implemented on site. Dragados hopes that these additional reinforcement actions help ensure that no additional occurrences take place. Please feel free to tontact me if you need any additionaf clarification. Sini lose Martin Alos Project Manager Cc: AngelCrespo JordiAndres Rafael de Ia earreda Michelle Bostick leremy Guy Dragados USA — Winston Salem Northern Beltway Project 775 Robbins Perch Trail, Kernersville NC 27284 � ;. I�:; ':.. - ;::,, A � _ Water Resources ENVIRONM[N1AL OUALITY i�:��i �iccit��a�' u�>Nf�i u ii. v.nh ui�:ic ��:�ntc�r Elecironic Correspondence: Mr. Pat Ivey, Division Engineer NCDOT Division 9 3'15 Silas Creek Parkway Winston Salem, NC Subject: Deaz Mr. Ivey: January S, 2016 NOTICE OF DEFICIENCY North Carolina Department of Transportation (NCDOT) NCDWR Project No. 2014-0090 v3 TIP Number U-2579B, Winston Salem Beltway Forsyth County ti. J:�Y 71��1\11�;R\4,1N On January 7, 2016, Dave Wanucha of the North Carolina Division of Water Resources (NCDWR) W inston Salem Regiona] Office received a phone call from Phil Suggs with NCDOT's Division 9 Roadside Environmental Unit, to report a sediment loss at Site 2 for the above reference project. Sediment impacted approximately1000 feet of stream channel. Phil explained that the loss was the result of the contractor's improper operation and maintenance of erosion control BMPs. This is the second incident of this type and is in violation of NCDOT's 401 Water Quality Cer[ification. NCDWR issued a 401 Water Quality Certification Number 3987 and subsequent modifications (original dated April 1 I, 2014) to NCDOT pursuant to Section 401 of the Federal Clean Water Act. It specifies that activities must adhere to the conditions listed in the 401 Water Quality Certification. Specifically, Condition 21 of the Certification states the following: 21. Erosion and sedinte�tt contro[ practices mzrst be rn full compliailce with a(l specifications governing tlae proper desi�rr, installation and operation and ir7aintenance ofsuch Best Management A•uctices n� order to protect szn�ace water standnrcls. The above permit violation appears to be related to the contractor's incompetence and disregard of proper methods related to BMP operation and maintenance. Accordingly, you are directed to respond to this ]etter in writing (via email) withio 10 calendar days of receipi of this notice. Slale MNoi fh ('arolina IFnoimnmental Quulil v I Waler Rcources 1ti17 Mail Service Cen(er, Raleigh, Nedii Camlina i7693-i617 Phone:919�fl07-83(1� � ..t,�r: .. .. . ,_ ,�.'C�..`:.'..— . ��e,..... Your response shall include the following: • List actions necessary to remediate the deficiency including prevention measures to insure repeated occurrences do not occur. Your response should be sent to this office: NCDENR, Division of Water Resources c/o Ms. Amy Chapman 1617 MSC Raleigh, NC 27699-1617 Thank you for your attention to this matter. This office requires that the deficiencies as described above be properly resolved. Unresolved deficiencies may lead to the issuance oSa Notice of Violation and/or assessments of civil penalties. If you have any questions or require any additional information, please contact Dave Wanucha at (336) 776-9703 or dave.wanucha@ncdenr.gov or myself at (919) 707-8784 or amv.chapman(�ncdenr.gov. Sincerely, ' V v� Amy C apman Transportation Peanitting Unit Supervisor Enclosures: none Electronic copies only: John Thomas, US Army Corps of Engineers, Raleigh District Office Jeremy Guy, NCDOT Division 9 Resident Engineer m u(cilncdot�o�) Lindsey Panek, NCDOT Division 9 Assistant Resident Engineer (Ipanek(c�ncdot�ov) Scott Wyrick, NCDOT Division 9(sdwyrick@ncdot.gov) Phil Suggs, NCDOT (psuggs(c�ncdot.Qov) Amy Euliss, NCDOT, Division 9 Emironmental Officer Matt Gantt, DEMLR, Winston Salem Regional Office (matt.gantt@nedenr.gov) File Copy