Loading...
HomeMy WebLinkAbout20160299_R-2536 Burial of Pipes on Jurisdictional Features_20160115Hi Travis, I wanted to follow-up with you regarding discussions yesterday during the 4C meeting for Section 2 and burial requirements. There has been discussions about burial and if it is necessary if aquatic passage is not viable due to length and slope and the possibility that material will not stay in the pipe or culvert due to the slope. While there is a need for additional quantification of this topic, the following are recommendations for R-2536 only based on existing guidelines and discussions to date. Please provide comments. Thanks for your response. Proposed: Pipes on JS streams do not need to be buried if either of the following are true: 1. If the pipe is greater than 250’ in length. 2. If the pipe is on greater than a 3% slope. Velocity in a 36” pipe on a 3% slope is about 10 fps at 0.5 feet of depth. Depth vs Velocity of a 36” pipe is shown below. The plans will say “Pipe not Buried” on the pipe where JS features enter a pipe with either of the above conditions. Pipes that are buried will have a sill incorporated into the headwall to provide stability for the upstream section. Culverts on JS streams do not need to be buried or backfilled if slope is greater than 4% If culverts greater than 4% are buried, then sills are required on both ends of the culvert. All other culverts will follow the Hydraulics Unit Guidelines on Sills and Baffles <https://connect.ncdot.gov/resources/hydro/Hydraulics%20Memos%20Guidelin es/01-06-2014%20Guidance%20for%20when%20to%20use%20Sills%20,Baffles%20in %20Box%20Culverts.pdf> Examples on R-2536 that came up at the meeting that need your concurrence include: Site 43C 54” Pipe over 390 feet would not be buried. Site 33 54” Pipe over 400 Feet long will not be buried. Site 35 6X7 RCBC on 4.89% slope will not be backfilled and will have sills if buried a foot. Regards, Matt Matthew (Matt) Lauffer, PE, CPM Assistant State Hydraulics Engineer Hydraulics Unit Department of Transportation 919 707 6703 office 919 621 0443 mobile mslauffer@ncdot.gov 1590 Mail Service Center Raleigh, NC 27699-1590 1020 Birch Ridge Dr. Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook <https://www.facebook.com/NCDOT1/> Twitter <http://ncdot.gov/travel/twitter/> YouTube <https://www.youtube.com/user/NCDOTcommunications> ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. SITE 35 -L- 364 + 22 W V =69]S E%ISiING J SiREAMBE� AROPOSED 6'xTRCBC (length =285 ) ..°.�s\'�,. �. � � /' 6 o ' / ��� ���, INSET B �J � ��� / Q � � SHH-B ��� SITE 35 � __- _ �,_� � ? „.� � � "-� `-�- :` i � _ M' � � i / �.� �ii � SEE-B SITE � ��, 5'J� _— — . ,....�'i SITE 33 SFF-B �� 5 SITE 36 i��o o WA—C �_j^ _:,,-� �a PA—C SITE IS INCL SK 3A PER � �. � fJ!Pfl ..o�mn.n�asev�omry-oo�mee��k���aioem,oaeo�, I�OO Dep[h ca. Acerage Veloeiry Ava�ea vaio���v rcru;