Loading...
HomeMy WebLinkAbout20240435 Ver 1_calebs PCN revised wetland table_20240506D. Proposed Impacts Inventory Impacts Summary ❑x Wetlands ❑x Streams - tributaries 1 a. Where are the impacts associated with your project ❑ Buffers ❑ Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. 2a1. 2b. 2c. 2d. 2e. 2f. 2g. Site #* Impact Impact Wetland Type* Wetland Name* Forested Jurisdiction Impact Area Reason/Type* Duration* ?* Type* (ac)* W1 Fill (Incl. Permanent Headwater W6 Yes Both 0.24 Riprap) Forest W2 Road/ Permanent Headwater W8 Yes Both 0.06 Driveway Forest Crossing W3 Fill (Incl. Permanent Headwater W3 Yes Both 0.05 Riprap) Forest W4 Other Permanent Bottomland W43 Yes Both 0.30 Hardwood Forest W5 Other Permanent Headwater W43 Yes Both 0.17 Forest Hand Temporary Bottomland U-2 Crossing Yes Both 0.03 W6 Clearing Hardwood 0.08 (.02) Forest Hand Temporary Bottomland U-3 Crossing Yes Both 0.02 W7 Clearing Hardwood 0.05 (.009) Forest Hand Temporary Bottomland U-6 Crossing Yes Both 0.02 W8 Clearing Hardwood .06 (.03) Forest Hand Temporary Bottomland U-7 Crossing Yes Both 0.03 W9 Clearing Hardwood .07 (.03) Forest W10 Hand Temporary Headwater U-8 Crossing Yes Both 0.03 Clearing Forest .04 (.02) W11 Hand Temporary Headwater U-9 Crossing Yes Both 0.02 Clearing Forest .02 ( .01) Hand Temporary Bottomland U-12 Crossing Yes Both 0.02 W12 Clearing Hardwood .06 (.03) Forest Page 9 of 22 PCN Form Version 4.3- February 22, 2024 Hand Temporary Bottomland U-13 Crossing Yes Both ()i 6 W13 Clearing Hardwood .05(.03) Forest Hand Temporary Bottomland U-15 Crossing Yes Both 0.03 W14 Clearing Hardwood .10(.03) Forest Hand Temporary Bottomland U-16 Crossing Yes Both 0.001 W15 Clearing Hardwood .02 (.01) Forest 2g1. Total temporary wetland impacts 0.3? ac 0.55 (0.21 conversi 2g2. Total permanent wetland impacts 0.82 ac 2g3. Total wetland impacts 1.10 ac 1.37 perm/temp total 2h. Type(s) of material being discharged and the amount of each type in cubic yards: maintenance corridor Click to enter text. 2i. Comments: Temp impacts are total for utility construction. Amount in ( ) is what Click to enter t?"ll remain as maintenance easement and counted as conversion (.21 ac) Mitigation proposed at 2:1 for 0.82 acre of wetland loss and 1:1 for 0.21 ac of wetland conversion n) Page 10 of 22 PCN Form Version 4.3- February 22, 2024