HomeMy WebLinkAbout20240435 Ver 1_calebs PCN revised wetland table_20240506D. Proposed Impacts Inventory
Impacts Summary
❑x Wetlands ❑x Streams - tributaries
1 a. Where are the impacts associated with your project ❑ Buffers ❑ Open Waters
(check all that apply):
❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, complete this table for each wetland area impacted.
2a.
2a1.
2b.
2c.
2d.
2e.
2f.
2g.
Site #*
Impact
Impact
Wetland Type*
Wetland Name*
Forested
Jurisdiction
Impact Area
Reason/Type*
Duration*
?*
Type*
(ac)*
W1
Fill (Incl.
Permanent
Headwater
W6
Yes
Both
0.24
Riprap)
Forest
W2
Road/
Permanent
Headwater
W8
Yes
Both
0.06
Driveway
Forest
Crossing
W3
Fill (Incl.
Permanent
Headwater
W3
Yes
Both
0.05
Riprap)
Forest
W4
Other
Permanent
Bottomland
W43
Yes
Both
0.30
Hardwood
Forest
W5
Other
Permanent
Headwater
W43
Yes
Both
0.17
Forest
Hand
Temporary
Bottomland
U-2 Crossing
Yes
Both
0.03
W6
Clearing
Hardwood
0.08 (.02)
Forest
Hand
Temporary
Bottomland
U-3 Crossing
Yes
Both
0.02
W7
Clearing
Hardwood
0.05 (.009)
Forest
Hand
Temporary
Bottomland
U-6 Crossing
Yes
Both
0.02
W8
Clearing
Hardwood
.06 (.03)
Forest
Hand
Temporary
Bottomland
U-7 Crossing
Yes
Both
0.03
W9
Clearing
Hardwood
.07 (.03)
Forest
W10
Hand
Temporary
Headwater
U-8 Crossing
Yes
Both
0.03
Clearing
Forest
.04 (.02)
W11
Hand
Temporary
Headwater
U-9 Crossing
Yes
Both
0.02
Clearing
Forest
.02 ( .01)
Hand
Temporary
Bottomland
U-12 Crossing
Yes
Both
0.02
W12
Clearing
Hardwood
.06 (.03)
Forest
Page 9 of 22 PCN Form Version 4.3- February 22, 2024
Hand
Temporary
Bottomland
U-13 Crossing
Yes
Both
()i 6
W13
Clearing
Hardwood
.05(.03)
Forest
Hand
Temporary
Bottomland
U-15 Crossing
Yes
Both
0.03
W14
Clearing
Hardwood
.10(.03)
Forest
Hand
Temporary
Bottomland
U-16 Crossing
Yes
Both
0.001
W15
Clearing
Hardwood
.02 (.01)
Forest
2g1.
Total temporary wetland impacts
0.3? ac 0.55 (0.21 conversi
2g2.
Total permanent wetland impacts
0.82 ac
2g3.
Total wetland impacts
1.10 ac 1.37 perm/temp total
2h.
Type(s) of material being discharged
and the amount of each type in cubic yards:
maintenance corridor
Click to enter text.
2i.
Comments: Temp impacts are total for
utility construction. Amount in ( ) is what
Click to enter t?"ll remain as
maintenance
easement and counted
as conversion (.21 ac)
Mitigation proposed at 2:1 for 0.82 acre of wetland loss and 1:1 for 0.21 ac
of wetland conversion
n)
Page 10 of 22 PCN Form Version 4.3- February 22, 2024