Loading...
HomeMy WebLinkAboutNCC231361_NOT Closeout Documents_20240429 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Rowan Project: Woodleaf Community Park River basin: Yadkin-PeeDee Person financially responsible:Rowan County-Aaron Church,County Manager Project#: ROWAN-2023-005 Address: 130 West Innes Street,Salisbury,NC 28144 1. Project Location: 9290 Gym Street,Woodleaf Pictures: No 2. Weather and soil conditions: Sunny,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Tyler Title: Project manager Inspection report: Sent Report Date given/sent: February 22,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Owen Swavely Others present: Date of inspection: March 21,2024 Time arriving on site: 12:00 PM Time leaving site: 12:30 PM CC: