HomeMy WebLinkAboutNCC241347_Site Plan or Location Map_20240502 PROJECT NARRATIVE THE PURPOSE OF THE PROJECT(PROJECT)IS TO CONSTRUCT A NEW 230 KV TAP LINE TO CONNECT MI THE RAEFORD ININ SOUTH U30KVNTY,SUBSTATION TO THEW RAEFORD-RICHMOND ST UCTV � :;;�N�� � MP TRANSMISSION LINE IN HOKE COUNTY,NORTH CAROLINA.NEW TRANSMISSION STRUCTURES WILL BE CONSTRUCTED ALONG THE TAP LINE ALIGNMENT AS IT TIES WITH THE �� RAEFORD-RICHMOND N THE30KV LINE.IN ADDITIM TWO KV LINE SWITCH STRURE 253-1 N 4L BE �� 01, �-� ����CONSTRUCTED ALONG THE RAEFORD-RICHMOND 230KV LINE(STRUCTURE 253-1 AND 248-1). /' /THE WORK WILL BE PERFORMED IN TWO DISTINCT LOCATIONS.THE FIRST LOCATION IS IN THE O� alZ��� �� � '- VICINITY HF OLD ACCESSMAXT N RD.A PERMANENT BE INSTALLED N GRAVEL CH N RT TION ENTRANCE AND 0 �����`� l�� 0 ALL REATNER SWIT DRIVE WILL I BE ON THE NORTH SIDE ADDITIONAL OLD ERUCTAXTON RE �' —�� WILRE ANEW SWITCH(#2532AN WILL 5 3),INSTALLED.ECTWOUCIONTNEWL STRUCTURESirN DUKE ��� �4� WILL BE INSTALLED(STR#253-2 AND PT#253-3). THE CONSTRUCTION TEAM WILL LIKELY NEED TO ACCESS ONE EXISTING STRUCTURE(STR#253)IN ORDER TO RE-TENSION THE TRANSMISSION LINES. N THE SOUTH SIDE OF OLD MAXTON R TRUC CONSTRUCTION ENTRANCE PROJECT ��� �� WILL BE INSTALLED IN ORDER TO ACCESS ONE EXISTING STRUCTURE(STR#254)FOR THE LOCATION /I - ,PPtirt PURPOSE OF RE-TENSIONING THE TRANSMISSION LINES. THE SECOND LOCATION OF WORK TO BE PERFORMED IS IN THE VICINITY OF OAKDALE GIN RD. ON THE WEST SIDE OF OAKDALE GIN RD.,SIX NEW STRUCTURES WILL BE INSTALLED(TAP STR#1, TAP ST #2,TIO TAP STR#WILL STR#4,TAPINSTR#5,AND STR#24 IN THE ENT BY OF LIZE SUBSTATION,ACCESS WILL BE OBTAINED VIA AN EXISTING UTILITY EASMENT BY UTILIZING A ENERGY® IrlAill*,1111141F CONSTRUCTION ENTRANCE OBTAINED BY OTHERS FOR THE SUBSTATION CONSTRUCTION.ONE EXISTING STRUCTURE(STR#249)MAY NEED TO BE ACCESSED FROM THE UTILITY EASEMENT FOR THE PURPOSE OF RE-TENSIONING THE TRANSMISSION LINES.THE CONSTRUCTION TEAM WILL ALSO LIKELY NEED TO ACCESS ONE ADDITIONAL EXISTING STRUCTURE(STR#248)IN ORDER TO RE-TENSION THE TRANSMISSION LINES AND A TEMPORARY CONSTRUCTION ENTRANCE WILL BE UTILIZED FOR THAT PURPOSE.ON THE EAST SIDE OF OAKDALE GIN RD.,AN EXISTING GRAVEL NORTH & SOUTH CAROLINA STATE MAP DRIVE WILL BE UTILIZED FOR THE CONSTRUCTION OF THE NEW SWITCH(SW#246-2).ONE ADDITIONALLYNE NEW STRUC ONEE WILL BEIN INSTALLED(E(STR#24 THE CONSTRUCTIONO -TE SITEAM N EL RAEFORD 230kV CONSTRUCT LIKELY NEED TO ACCESS ONE EXISTING STRUCTURE(STR#246)IN ORDER TO RE-TENSION THE TRANSMISSION LINES. P PROJECT WETLANDS AND JURISDICTIONAL SCREAMS HAVE BEEN H TOUT FOR THE PROJECT; TAP 1 LINE (E18011702) HOWEVER,THERE ARE NO JURISDICTIONAL FEATURES WITHIN THE LIMITS OF DISTURBANCE.AS H A PRECAUTION,WATTLES WILL BE USED IN THE VICINITY OF JURISDICTIONAL FEATURES. IN ADDITION TO THE STRUCTURE REMOVALS/ADDITIONS,DANGER TREE CLEARING WILL OCCUR RA E F O R D R I C I-I M 0 N D SUBS TAT I O N 2 3 0 kV N O R T IH (OL 3 3 5) AS NOTED ON THE EROSION CONTROL AND ACCESS PLAN(PLAN).AREAS 62.5 FT ON EITHER SIDE OF THE EXISTING 100-FT ROW,WILL BE ASSESSED FOR DANGER TREE CLEARING.TREES ARE ONLY CLEARED IF THEIR HEIGHT AND/OR CONDITION ARE DETERMINED TO BE A THREAT TO P THE LINE.NO GRUBBING WILL OCCUR WITH THE DANGER TREE CLEARING. EROSION CONTROL AND D ACCESS C E S S PLAN /` N THE TOTAL LIMITS OF DISTURBANCE(LOD)FOR THE PROJECT ARE LISTED AS 11.2 ACRES; H H `\J /��\ HOWEVER, S H F THE AREA ENCOMPASSES IS ACCESSRB TO THE T BELIMITED N LINE RAEFORD, N C STRUCTURES AND TREE CLEARING.GROUND DISTURBANCE WILL LIMITED TO THE CONSTRUCTION ENTRANCE AREAS,GRAVEL ACCESS DRIVES,MATTED AREAS,SWITCH PADS, AND WORK AROUND STRUCTURES.THAT DISTURBED ACREAGE IS ESTIMATED AT 0.5 ACRES.NO DESIGNATED STOCKPILE OR LAYDOWN AREAS ARE ANTICIPATED ON THE SITE.OFF-SITE STOCKPILE OR LAYDOWN AREAS WILL BE PERMITTED SEPARATELY. THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT-OF-WAY. LATITUDE: 34.962907 THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT LONGITUDE: -79.218151 CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS.PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND �+MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF SHEET LIST: THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED A RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE q - -INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. - ry'\ E PALMER ST. 8 , TITLE SHEET SHEET PTL EROSION&SEDIMENT CONTROL NOTES SHEET PEN1 THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN APRIL,2024 AND BE COMPLETED IN w , -�,I 9G EROSION&SEDIMENT CONTROL NOTES SHEET PEN2 DECEMBER,2024. Z �., ��. p cN EROSION&SEDIMENT CONTROL NOTES SHEET PEN3 EROSION&SEDIMENT CONTROL PLAN SHEET P1 GENERAL NOTES 0 • ` EROSION&SEDIMENT CONTROL PLAN SHEET P2 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND AREROSION&SEDIMENT CONTROL PLAN SHEET P3 CO� EROSION&SEDIMENT CONTROL PLAN SHEET P4 FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. EROSION&SEDIMENT CONTROL PLAN SHEET P5 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES. `0 EROSION&SEDIMENT CONTROL DETAILS SHEET PED1 AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. tri 'A.7 EROSION&SEDIMENT CONTROL DETAILS SHEET PED2 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE A EROSION&SEDIMENT CONTROL DETAILS SHEET PED3 CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, '�, P4 EROSION&SEDIMENT CONTROL DETAILS SHEET PED4 EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC c EROSION&SEDIMENT CONTROL DETAILS SHEET PEDS 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT `P OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO P3 N REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. O MIGRATORY BIRD HOTLINE 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR P5 SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY ENERGY. SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, 0 5. THERE ARE NO NAMED SURFACE WATERS WITHIN THE PROJECT LIMITS.THE MOST IMMEDIATE q SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 00 SURFACE WATERS ARE PEDLER BRANCH(18-31-16;C)AND ROCKFISH CREEK(18-31-(15);C)OF THE CAPE 24 BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND FEAR RIVER BASIN AND TONEYS CREEK(14-10-1.2;C;Sw)OF THE LUMBER RIVER BASIN.THE PROJECT IS p CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. LLI NOT SUBJECT TO STATE-REGULATED BUFFER REQUIREMENTS. F- 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 7. WHERE STREAMS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE P2 FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF P1 SPILL REPORTING HOTLINE 0 THE RIGHT-OF-WAY. IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY MAX IN O.' REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER d PERMITTING PRIOR TO USE. OLD o REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR W 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU z scQ SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS Z OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. q H �c0 DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF 10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED Rk/g THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CL IN JURISDICTIONAL WETLANDS AND/OR STREAMS. fi`0 x CAROLINAS&MIDWEST:800.527.3853 Q 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR Ilk 40 FLORIDA:866.769.1266 SURFACE WATER WITHOUT CONTAINMENT. I- 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE VICINITY MAP CONTACTS D DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. PERMITTING SPECIALIST HDR Engineering Inc. RESPONSIBLE FOR MAINTENANCE: 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND SCALE: NTS Duke Energy Progress of the Carolinas NAME I- COVER SHALL BE USED FOR STABILIZATION. Khadijah Hasan David R.Wagner II,PE PH: Z 410 S.Wilmington Street 555 Fayetteville St.,Suite 900 FAX: Raleigh,NC 27601 Raleigh,NC 27601 EMAIL@EMAIL.COM 0 P:(336)340-4312 PH:(919)232-6600 0 CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) khadijah.hasan@duke-energy.com david.wagner@hdrinc.com > OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO 0 BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING CV UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL Cl UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 4:: DUKE mnE RAEFORD 230kV CONSTRUCT W TAP LINE PROJECT(E18011702) Q ]lEngineering, NERGY RAEFORD-RICHM NORTH (SUBS;SUBSTATION I ♦11 HDR Inc.of the Carolinas 230kV NORTH OL335 �♦ ` 555 Fayetteville St,Suite900 Raleigh,N.C.NC27601 RG'y'® EROSION CONTROL AND ACCESS N.C.B.E.L.S. License Number:F-0116 PROGRESS PLAN II 550 S. TRYON ST.,SUITE 4500 CHARLOTTE N.C.28202 LINE INDEX: DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(919)546-2090 OL335 E18011702 PTL