Loading...
HomeMy WebLinkAbout780072_Routine Inspection_20240430Type of visit: AD -Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival --Time: O Departure Time: %r County: /4 Farm Name: Owner Email: Owner Name: �. S� Phone: Mailing Address: Physical Address: Facility Contact: ��d O Title: Onsite Representative: Integrator: Phone: Region: %� Certified Operator: '5-27� Certification Number: /S�1206_ Back-up Operator: Location of Farm: Latitude: _Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Certification Number: b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yeses❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes 12-No ❑ NA ❑ NE ❑ Yes Q No ❑ NA ❑ NE Page 1 of.? 511212020 Continued Facility Number: - % Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ETNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes J[2 No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): / Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes „E'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E� No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Db any of the structures need maintenance or improvement? -Eres ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,❑'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ,[3Qo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ..[31Qb ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Accepp+taable, Crop ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area /Window 12. Crop Type(s): (�Lc�} J �Iaj W�/L Gs 13. Soil Type(s): W �O 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes_Q-No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ID -No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [2-No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes C7FNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑" Ro ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑ Yes J2'No [—]NA ❑ NE [—]Yes ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes-.Ej'�o ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes JEJN'o ❑ Yes ZIAo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: 7 Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E:H o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes E2,IQo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes _[2,IQo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes _® o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [3No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes „1:�IVo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [3-No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes J® No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes EjNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 4�]o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes -2--�o ❑ NA ❑ NE Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: (/y -i rl l�i5� Date: 511212020 raauty NO. Time In _ Time Out Farm Name I>n Integrator Owner Site FCac. Operator No Back-up No. HOC Circle: General or NPDES FREEBOARD: Design Observed Crop Yield Rain Gauge Soil Test % Wettable Acres Weekly Freeboard ✓ Daily Rainfall -4_, Spray/Freeboard Drop Weather Codes _iG 120 min Inspections 1� Waste Analyses: Date Nitrogen (N) P 0 v Date rd-r 9r Sludge Survey.- JLd 7 Calibration/GPM 7 < l/I / >-j Waste Transfers Rain Breaker PLAT 1-in Inspections Date Nitrogen (N) 31�/��