HomeMy WebLinkAboutGW1--02625_Well Construction - GW1_20240501 PrintFORII -
WELL CONSTRUCTION RECORD 1GW-1) For Internal Use Only: F
1.Well Contractor Information: I
i.
Michael Coleman
Welt Contractor Name ft.FROM , TO DESCRIPTION
2 ft. I'992-A
ft. ft. u ;
NC Well Contractor Certification Number 'I&OUTER CASING(for multltased wells)OR LINER Of a.pplii.cabale)
Cascade Drilling FROM TO DIAMETER THICKNESS 1 MATERIAL
0 ft. 53 ft. lu. (steel
Company Name
/� ;16.INNER CASING OR TUBING(geothermal riaaed409)''
2.Well Construction Permit# /4 (_P�✓l/4., f�� MOM TO DIAMETER THICKNESS MATERIAL
List all applicable well construction /is(+.e,(/IC.Cowry.&ate,Variance.eta) lL ft. in.
3.Well Use(check well use): ft' In.
Water Supply Well: FROMREgN TO DIAMETER SLOT SIZE THICKNEss MATERIAL
Agricultural °Municipal/Public 63 it. 55 D. 1 in. 0.010 ss
Geothermal(Heating/Cooling Supply) ['Residential Water Supply(single) fL it. in.
industrial/Commercial DResidential Water Supply(shared) t 1&GROUT. ."
Irrigation FROM TO MATERIAL ' EMPLACEMENT METHOD Fe AMOUNT
Non-Water Supply Well: o n- 51 ft cement ' tremia pipe
Monitoring — ------_°Recovery-- --- — ---;-'--,,-----ft..- . --ft. - H. -_.--- _ - -.- --- —
Injection Well: r
ft. ft.
Aquifer Recharge �)t Groundwater Remediation 14.SAND/GRAVEL PACK(H applicable)
Aquifer Storage and Recovery ['Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD
Aquifer Test DStormwater Drainage 51 ft- 55 ft. #00 send Sonic
Experimental Technology ['Subsidence Control ft. ft.
Geothermal(Closed Loop) ['Tracer ;.20.DRILLING LOG(attach additional sleets If necessary) - -- -
Geothermal(Heating/Cooling Return) father(explain under#21 Remarks)
FROM TO DESCRIPTION(nobs hardness,tolVreck typo train the,etc.)
4/3/2024 S-2(SB-06) CV ft'' 2 5 n' - i 'P'�,��� 9r%y See.�d* --7
4.Date Well(s)Completed: WeilLW/ f-�
5a.Well Location: " I
9� ft. �
��
Facility/Owner Name Facility ID#t(if applicable) ft. ft. i -?L.r i/r1 "'?ft ,-.
/s�'C � ���/� r�w�-i.7P. / 28�s/f - ft. ' MAY t 2G%%
Physical Address,City,and Zip h' ft. ? t F� ,._
21.REMARKS 1 i. �,•, :?:. : r„:9.•1.
County Parcel Identification No.(PIN) On sites gpo has soil descriptinn
sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees:
(if well field,one Iat/ong is sufficient) 22.Certification: '
3 Y. -7 y/c 6 N 077,E 66 cv w �,,e 1--- 4/17/2024
6.Is(are)the well(s)I]Permanent or ['Temporary Signature of Certified Well Contractor I Date
By signing this form.I hereby certifr that the well(s)was(were)constructed in accordance
7.is this a repair to an existing well: OYes 'or x)No• with ISA NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Sranderdsand that a
If this It a repair.fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner.
repair under#11 remarks section or on the back of this form. 23.Site diagram or additional well details:
8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well
construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary.
drilled: SUBMITTAL INSTRUCTIONS
9.Total well depth below land surface: 55 (ft-) 24a. For All Wells: Submit this form within-30 days of completion of well
For multiple wells list all depths ifdtgerent(example.3@200'and 21l]i J00') construction to the following: j'
I.
10.Stolle water level below top of casing: (ft.) Division of Water Resources,Information Processing Unit,
If water level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617
11.Borehole diameter: 6 (in.) 24b.For infection Wells: In addition to sending the form to the address in 24a
Sonic above,also submit one copy of this form within 30 days of completion of well
12.Well construction method: construction to the following:
(i.e.auger,rotary,cable,direct push,etc.) P
Division of Water Resources,Underground Injection Control Program,
FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636
i' 1
13a.Yield(gpm) Method of test:- 24c.For Water Sunsiv Sc infection Wells: In addition to sending the form to
the address(es) above, also submit one copy of this form within 30 days of
13b.Disinfection type: Amount: completion of well construction to the county health department of the county
where constructed.
Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016
040- TERRATHERM SIW Boring Construction Detail Revision#:_0
"�""` Release date_04/02/24_
Approved by:_DS/EH
Well ID S-2(SB-06) Date
Oversight �,�1 Job# R23-104
Driller- rp df1 'rt�� G/+hw�..7 rr 4e' C�le,",d,N.e Design Constructed Notes
[fill out if
different)
1 --SIW Stick Up Height 18"
Cover Surface 1.0' 1
Ground Surface 0A' . I
Grout =ice`
- —_ ___
k.
', '' i , i Borehole Diameter 6'
r,
NW
Riser i"CS r k
Riser Length 55.5 ft ? ! i, }-'.Bags of Cement 1450 4 !!
Screen Length 2 ft r ). .',i `
Screen Material SS . s. ',. Bags of Silica - 4.75
SIW Slot Size 10 ,
Screen Diameter 2" � Bogs of Sand 2.0
f
Installation Method • {
'Sonic ,
Direct Push <,
Hollow Stem Auger
Mud Rotary ;;'
Other: Top of#00Sand 51
• Top of Screen 53
..N
---- —--- - - --— --- - --- Bottanrof BOO Sand'-�"55=--- - - — — —
and Screen
Bottom of Borehole 55
Post-Installation QC(to be performed 24hrs after Installation) PRD Log:Make/Model:
1)Confirm well is free of grout Design Constructed Time: Reading: PPM
Depth to bottom of well[ft bTOCJ: a7 a Time: Reading: PPM
if greater than or equal to Ift less than designed alert the office Time: Reading: PPM
2)Confirm grout plug reaches ground surface Time: Reading: PPM
repeat daily until depth to grout Is Oft. Time: Reading: PPM
Date Depth to Grout[ft bgs) Notes: