Loading...
HomeMy WebLinkAboutNCC231056_MODIFICATION Supporting Doc (LEG RESP CHANGE)_20240430 NCGO1 Legally Responsible Individual Change Form Use this form when: The person who is legally responsible for the permit has changed, but there is NO CHANGE in the project name or ownership. **If the project name has changed, or if the ownership of the project has changed, do NOT use this form.** Instead,you must submit a new NCGO1 electronic Notice of Intent(eN01). Directions: Print this form,complete,scan and upload to the Construction Stormwater Permit MODIFICATION Form. Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor(Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR MODIFICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Certificate of Coverage(COC) Number: NCC231056 Name of Project: Goldsboro Collection System Improvements - Phase II Legally Responsible Organizational Entity: Wayne County Development Alliance PREVIOUS Legally Responsible Individual: Mark Pope NEW Legally Responsible Individual: Craig Foucht The following section is to be completed and signed by the NEW Legally Responsible Individual. Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Page 1of2 NCGO1 Legally Responsible Individual Change Form THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Under penalty of law, I certify that(check all boxes to indicate your agreement): 11 I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. 11 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. if I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. 11 This form has been reviewed and is accurate and complete to the best of my knowledge. qr- *Signature: Date: 9/r'1 oLLf Print Name of Signed: Craig Foucht Title: President Mailing Address: PO Box 10397, Goldsboro, NC 27532-10397 Street Address: 218 E. Walnut St., Goldsboro, NC 27530 Email Address: craig.foucht@ncgtpedr.com Phone Number: 919-288-5148 * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV, Section B, Item(6)of the NCG010000 permit. Page 2 of 2