Loading...
HomeMy WebLinkAboutNCC192678_MODIFICATION Supporting Doc (LEG RESP CHANGE)_20240429 NCG01 Legally Responsible Individual Change Form Use this form when: The person who is legally responsible for the permit has changed, but there is NO CHANGE in the project name or ownership. **If the project name has changed, or if the ownership of the project has changed,do NOT use this form.** Instead,you must submit a new NCG01 electronic Notice of Intent(eNOI). Directions: Print this form,complete,scan and upload to the Construction Stormwater Permit MODIFICATION Form. Then, mail the original form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N.Salisbury Street, 6th Floor(Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR MODIFICATION HAS BEEN REVIEWED AND ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Certificate of Coverage(COC) Number: NCC192678 Name of Project: Berkshire Lakemont-Pineville Distribution Street-Lot 1 Legally Responsible Organizational Entity: Intercon Building Corp. PREVIOUS Legally Responsible Individual: David white NEW Legally Responsible Individual: Michael Tulin! The following section is to be completed and signed by the NEW Legally Responsible Individual. Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Page 1 of 2 NCG01 Legally Responsible Individual Change Form THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.221 Under penalty of law, I certify that (check all boxes to indicate your agreement): ® I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. 0 I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. 0 If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan)of the NCGO10000 General Permit. I will nonetheless ensure that all conditions of Part 11 of the permit are met on the project at all times. ® 1 understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. 0 This form has been reviewed and is accurate and complete to the best of my knowledge. *Signature: �� Date: 4/29/24 Print Name of Signed: Michael Tulini Title: Project Manager Mailing Address: 211 Atherton St.,Charlotte,NC 28203 Street Address: 211 Atherton St.,Charlotte,NC 28203 Email Address: miket@interconbuildingcorp.com Phone Number: 847-975-6107 *IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit. Page 2 of 2