Loading...
HomeMy WebLinkAbout20190183 Ver 1_Credit Release Request Form_MY4_Loflin Dairy_20240425 4/26/2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Jeffrey Turner (jturner@wildlandseng.com, 704-332-7754 x118) Through: Wildlands Holdings V, LLC We formally request a credit release for the Loflin Dairy Phase II Buffer Mitigation Bank Parcel for completion of Task #8 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #5: approved Loflin Dairy Phase II Buffer Mitigation Bank Parcel Monitoring Year 4 Report and financial assurances (Bond). Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 5% 17,555.65 sq. ft. 351,113 sq. ft. x 0.05 = 17,555.65 sq. ft. Buffer Preservation 5% 170.95 sq. ft. 3,419 sq. ft. x 0.05 = 170.95 sq. ft. Buffer Enhancement 5% 617.55 sq. ft. 12,351 sq. ft. x 0.05 = 617.55 sq. ft. Generated Nitrogen Nutrient Offset NA NA Delivered Nitrogen Nutrient Offset (Jordan sites only) NA NA Generated Phosphorus Nutrient Offset NA NA Delivered Phosphorus Nutrient Offset (Jordan sites only) NA NA Signature: Attachments: 1) Approved Project Credit Table – Baseline Monitoring Report 2) Approved Credit Release Schedule – MBI Task Project Milestone % Credit Available for Sale 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded and Financial Assurance Posted 20 2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: Approved by the DWR & financial assurance renewed 10 5 Monitoring Report #2: Approved by the DWR & financial assurance renewed 10 6 Monitoring Report #3: Approved by the DWR & financial assurance renewed 10 7 Item B(1) of Section X in this Instrument has been completed and approved by DWR 5 No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the DWR & financial assurance renewed 5 9 Monitoring Report #5: Approved by the DWR and final site visit by DWR has been conducted 10 Total 100%