Loading...
HomeMy WebLinkAboutSW6240103_Response To Comments_20240425 $P4Dsite4D �:�J solutions April 25, 2024 civil engineering I land surveying NCDEQ Division of Water Quality Attn: Brianna Holland 512 N. Salisbury Street Raleigh, NC 27604 RE: Storm water submittal, Leander Lee Preserve Subdivision (SW6240103), Harnett County, North Carolina Brianna; We received the request for additional information dated April 17 for the Leander Lee Preserve Subdivision. The comments have been addressed as noted below. 1. Administrative review comments unresolved: If the Applicant, Mills River TH, LLC, will be purchasing the property, they should be listed as the purchaser in this section and a sales agreement (required per 15A NCACO2H .1042(2)(c)) should be provided, otherwise, the applicant should be listed as the developer on the application. Please provide the sales agreement between the property owner and "Triangle Land Partners, LLC". Engineer Response: "Updated section of application is attached with Triangle Land Partners marked as the developer." Current comment: The applicant was updated to "Triangle Land Partners, LLC" but it is still shown as a purchaser in Section III lc. If Triangle Land Partners, LLC is the developer, please revise. If Triangle Land Partners, LLC is the purchaser, please provide the sales agreement between the property owner and "Triangle Land Partners, LLC". lx hard copy of the property deed. This item is required per Section VI, 10 of the Application. The property owner is listed as "Harriette Lee Ray" on the application, but as "Carrie Lee Ray" on the Deed. Please either provide an updated Deed, or revise the application. Engineer's Response: "The provided deed is the current deed for the property. Carrie Lee Ray is Hariette Lee Ray's father. He is deceased. I have attached the estate deed that shows that Carrie Lee Ray is current owner of property. Her father left everything to her." 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 On time,every time. I www.4Dsitesolutions.com Current comment: Ensure this is uploaded to the electronic repository. This item is required per Section VI, 10 of the Application. Documents have been uploaded as requested. 2. General It appears that there is existing BUA that is to remain within CA 1. Please revise the Application and Supplement-EZ, and project percent impervious area to account for this. This is an existing dirt path. A note was added to remove any impervious area located on the path within CA 1. Per 15A NCAC 02H .1003 (1) (a): Project density shall be calculated as the total built-upon area divided by the total project area. OR 15A NCAC 02H .1003 (1) (b) A project with existing development has the option of calculating project density as the difference of total built-upon area minus existing builtupon area divided by the difference of total project area minus existing built-upon area; (c) (i) Total project area shall exclude the following: areas below the Normal High Water Line (NHWL). No change needed since there will be no existing impervious area remaining in CA 1. 3. Surface Water a. Clearly identify and delineate the top of bank of each side of of the surface water (Johnson Branch) in the main set of plans (Section VI, 8h). If it is not possible to delineate the banks of the surface water (as would be the case for a narrow stream), please show the centerline of the surface water (noted to already be on plans) and provide a callout listing the surface area of that surface water. Ensure the setback is measured from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, perpendicular to the shoreline for all perennial and intermittent surface waters. 15A NCAC 02H.1003(4)(a), 15A NCAC 02H.1042(2)(g)(iii). The stream is narrow and the top of bank on each side would not be visible on the plans. The centerline of the stream is shown and labeled on the plans. The setback is shown and labeled on the site plan.The surface water area has also been labeled. 4. Plans a. Please show the drainage areas for each swale on the main set of plans so that the drainage areas in the calculations/Supplement-EZ can be confirmed. (Section VI, 8, o). See sheet C-3.4 5. Calculations a. A signature and seal must be provided for the calculations (15A NCAC 02H .1042 (2) (f)). The electronic copy of the permit files must match the hard copies of the 2 permit files and must also be complete (15A NCAC 02H .1042 (2)). Sealed cover page has been uploaded b. Please confirm the ditch calculations provided. Calculations were provided for ditches#1-33, but only 1-27 could be located on the plans and were accounted for in the Supplement-EZ. The data in the calculations did not seem consistent with the table provided in the Supplement-EZ. Current calculations are enclosed and uploaded c. Pipe 1 Calculations were for a 36" diameter pipe, but the plans show a 49"x32" elliptical pipe. The pipe crossing has been modified per comments and correspondence with NCDOT. The current calculations are enclosed and uploaded. 6. Supplement-EZ a. Low Density Page, Line 5— Please revise.This item is equal to the largest "Vactual" value from the swale table. Chart has been updated 7. Please provide a Response to Comments letter indicating, in a point-by-point manner, how each of the above comments has been addressed. This item is required per 15A NCAC 02H .1042(3)(b). done 8. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. Hardcopies enclosed and pdf has been uploaded I look forward to working with you on this project. If you have any questions or concerns, please contact me at your earliest convenience. Sincerely, 4D Site Solutions, Inc Scott Brown, PE sbrown@4dsitesolutions.com Enclosure 3