HomeMy WebLinkAboutNCC230836_NOT Closeout Documents_20240423 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Mecklenburg Project: Lynwood Ln&Lakeview Dr Proposed St River basin: Catawba
Person financially responsible:Town of Pineville-Chip Hill,Public Works Project#: MECKL-2023-036
Director
Address: 500 Main Street,PO Box 249,Pineville,NC 28134
I. Project Location: Lakeview Drive,Pineville
Pictures: No
2. Weather and soil conditions: Sunny,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): None Title:
Inspection report: Sent Report Date given/sent: April 15,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGOI)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Owen Swavely Others present:
Date of inspection: April 10,2024 Time arriving on site: 10:00 AM Time leaving site: 10:15 AM
cc: