HomeMy WebLinkAboutNCC230445_NOT Closeout Documents_20240423 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
Faithwill Farms,Phase Two-Lots 11-13
County: Cumberland Project: & 16 River basin: Cape Fear
Person financially responsible:Landry Builders,Inc.-Loyd Landry,President Project#: CUMBE-2023-100
NCC230445
Address: 913 Log Cabin Drive,Fayetteville,NC 28312
1. Project Location: James Allen Lane,Eastover Twp
Pictures: No
2. Weather and soil conditions: Dry/Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Ryan Landry Title:
Inspection report: Sent Report Date given/sent: March 28,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG010000)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Bailey Taylor Others present:
Date of inspection: March 28,2024 Time arriving on site: 9:35 AM Time leaving site: 9:45 AM
CC: