HomeMy WebLinkAboutSW6240105_Plansheet - Grading/Drainage Plan_20240424 (5) I
4Dsite
n LEGEND: solutions
I / EiP 00 EIP-EXISTING IRON PIPE civil engineering I land surveying
I EPK0 EPK-EXISTING PK NAIL 409 Chicago Drive,Suite 112,Fayetteville,NC 28306
ERG office 910-426-6777 fax j 930-426-5777 license number I C-2354
O ERB-EXISTING REBAR
I wwwADsitesolutions.com
o COMPUTED POINT
IN/F - NOW OR FORMERLY
R/W - RIGHT OF WAY
PROPERTY LINE
I 90 �/ti
n ADJACENT PROPERTY LINE XX11lIII�1////
TIE LINE J�Q�N•CAR� ��j�i
RIGHT-OF-WAY `� O • LESS 10
��
l -� SyFFT 237 wL WATER LINE Q.
/`V / J f / / // OVERHEAD UTILITY 0274
CREEK
SILT I / I -
S /
WETLANDS
FENCING •`�VG I NE •••: ?`��
(TYP) / / 30' 30' 30' VEGETATED BUFFER ��� s •• g� ``��
Ir A 2�2 z / / '` r EXISTING EASEMENT LINE Z//;, /07ITftl�����`�
PP DRIVEWAY TO o I M 77 / / 00^ DITCH 66 o X FENCE LINE
♦� 3 BE RELOCATED N I :Q / �� TO BE S EDED 60 7 h ♦ S TREE LINE
i w , / gg ,� / / WITHIN 7 DAYS '\,- �� 230 MAJOR CONTOUR �����
I� >_ OO p TEMPORARY SEDIMENT TRAP #14
r I DITCH #65 / / L=65' W=25' D=3.5' �� 232 MINOR CONTOUR
DITCH #54 I � / >� ti
89 TO BE REINFORCED F TO BE SEEDED ,�/j i / SIDE SLOPES= 2:1 y x 234.4�'SPOT ELEVATION
O WITH NAG S75 I / r
WITHIN 7 DAYSjO TOP OF BASIN: 215.00 �'�� c„/ REVISIONS
i o BENCHMARK
STAPLE PATTERN D I 2�o b / / � � S��N
TO BE , � i _ BOTTOM OF BASIN: 211.50'
3 .RELOCATED I �1 6' EMERGENCY SPILLWAY: 214.00' 7 �o ! '� , 0 SIGN
r I / 230.94 DITCH #69 SIDE SLOPES OF BASIN ARE TO .ems: ter- , ®TRANSFORMER
23A TO BE REINFORCED BE SEEDED WITHIN SEVEN DAYS. STREET LIGHT
WITH NAG S75 MATTING PPS UTILITY POLE
^ STAPLE PATTERN D 10' UTILITY & 001 Jp� CA 4 0 ��
z 68 \���j l\ DRAINAGE � GUY WIRE
-18 w N I v 230.55 230.02 EASEMENT 214.60 SiLd aI I 10' UTILITY & ��, g� / 0 TELEPHONE PEDESTAL
1n bi a n. 238 DRAINAGE i /*,
/ \ D4 WATER VALVE
Of w�. ' I �$ EASEMENT 7� GOG�gsl 30.01 N DITCH #70 ,0p� / / HOC 208 0 ,j FIRE HYDRANT
z V)M �I. ,\ p`� �y P TO BE REINFORCED �6 \ ❑o WATER METER
o Vw m r I �O/ � �� <p� WITH NAG S200 MATTING � ASPHALT
N o I CHECK DAM W/ o N I DITCH #61 O�1�G Yf ��O o, so .�� \ STAPLE PATTERN E n SF�j„�� / �, LIMITS OF CONSTRUCTION
$$ WEIR IN CENTER M' OOl �> �� - /i ti (24.3 AC) - _ _ WETLANDS
v \
(T ) I ( - WITH NAG S75 ^�, 2 , $ I % 225.25 P� j�. / cG ��"PLACE MATTING IN FLOW PATH M �_ _, = iUNSUITABLE SOILS
TO BE REINFORCED � S 0 �� G \s � �
236.16 w ZL <i (�
001 STAPLE PATTERN D o �, �. i „_ _ l-oc-l-oc-LIMITS OF CONSTRUCTION
DITCH #64 <\ r p THRU BASIN AFTER BASIN ■ _
OOl O� /.INV 224.90 g0 / O � N
TO BE SEEDED n .F G 9 20. do G DITCH 71 AREA IS RECLAIMED ` �� c - - -
233 TO BE REINFORCED •r
SF SF SILT FENCE LINE
WITHIN 7 DAYS DITCH 8 \\<. <� G� 225.67 / WITH NAG S75 MATTING ��" -� ,
! � �' n -aN -aN -JUTE NETTING
' > � 0 STAPLE PATTERN D
L$ n�" TO BE REINFORCED \u -ory-ory-DIVERSION BERM
3 234.33 'PIPR PIPE 8 2 WITH NAG S75 MATTINGCO �0� j 2' DITCH / �. �.
44.00 LF @ 0.57% 30" CLASS IV RCP OINLET PROTECTION
23 /234.33 STAPLE PATTERN D V 'Cl ;% 220.7o BOTTOM
r I S INV 224.65 10' UTILITY & �
0 234.45 232 ":;', , 1' 225.67 '
230 _ �.� 224.65 EASEMENT
65 �� voo�
i 234.10 / -E6E SF LAC SF ter. SF SF SF �c F C O
w� DITCH #60-tOC`tOC RIP RAP DISSIPATER \ 06,
r'
235 �_ TO BE SEEDED L=20' W=7.5'/22.5' O DITCH #72 0'' C� 1 r / cwn WITHIN 7 DAYS 10' UTILITY & , TO BE REINFORCED
Q DRAINAGE Ds�10" D. 15" DITCH #62 WITH NAG S200 MATTING �Rti° / r
$� ``' EASEMENT CLASS 1 22.5" THICK\ \ \TO BE REINFORCED STAPLE PATTERN E 220.8\220.86 �\ /) ( o l , C�
/ Ed I WITH NAG S75
PP �_ �3a ro \ STAPLE PATTERN D ZZo F
i �� PROJECT NAME
79 0 , 218.59 218.59
o. DITCH #73 �'�
\ __1 \ 66 TO BE SEEDED,-,
216.07-218 05� ' r
ELYSE
/ II 2' DITCH WITHIN vDAYS ` ,I, ��® �P
0 0 p p BOTTOM ,,Zp . F f SILT FENCE ( � \ ��
/ N' N DITCH 56 n No , '� 2 16 v \ OUTLET \ /
# 222.10 215.24 2i \l J
\
� TO BE SEEDED 67 J / F SF
WITHIN 7 DAYS • \� � �l p DITCH �C
� 1 �� BOTTOM 00 MEADOWS
/ �3� \yam C DITCH #63 TEMPORARY SEDIMENT TRAP #15 205'
\ -TO BE REINFORCED/ """"'���' L=55', W=30', D=3.5'
/ n r WITH NAG S200 , 2,4.87 _ SUBDIVISION
/ 7 v STAPLE PATTERN Ell <p ) SIDE SLOPES= 2:1
86 I TEMPORARY SKIMMER BASIN #16 \ �N \ \� TOP OF BASIN: 213.00' f
L=110', W=65'_ D=3' r0 . \� s� \ . BOTTOM OF BASIN: 209.50' S0��T
/ V) SIDE SLOPES 2:1 Cl)*
y o / 5
w TOP OF BASIN: 210.00' \-� J _ \ v 6' EMERGENCY SPILLWAY: 212.00' o
DITCH 55 0 80 I I \ < o SIDE SLOPES OF BASIN ARE TO 2
TO BE REINFORCED WITH NAG S75 F- Q OO BOTTOM OF BASIN: 207.00' / \l \ / O \ J BE SEEDED WITHIN SEVEN DAYS. ,� N
1 15' EMERGENCY SPILLWAY: 209.00' sip / -
V STAPLE PATTERN D I 0� >_ SIDE SLOPES OF BASIN ARE TO
Z) _j BE SEEDED WITHIN SEVEN DAYS. n l
""ATTACH A 1.5
0 " \ 1
U FAIRCLOTH SKIMMER \ c:"PLACE MATTING IN FLOW PATH
Z ct (OR EQUAL) WITH 1.3" ORIFICE FOR / \ 217.24 ` - THRU BASIN AFTER BASIN
I _ r DEWATERING THE SEDIMENT r'p AREA IS RECLAIMED
a m BASIN DURING CONSTRUCTION.
<
Urom
*PLACE MATTING IN FLOW PATH z
�_j
THRU BASIN AFTER BASIN STOCKPILE DETAILED
Il AREA IS RECLAIMED \ AREA wJ, \ °-�
NV, L I /
a,i \ ��
z GRADING AND
85
I� 0 \ SILT FENCE EROSION
r I �� / / x \
/ / � CHECK DAM OU
'- TLET
W/ WEIR IN D
CD ��s 00, 00 0 _ SFv. F CENTER D CONTROL PLAN
�\ ,
10' UTILITY & _SE_- =_SE_-- K STAREAILE \ ��
DRAINAGE I - /
EASEMENT
n
�( CLIENT
223.46 w ��,. � � \ I
DITCH #57 223.46
O01 TO BE REINFORCED aN c
OOl WITH NAG SC250 �� � �} SILT FENCE
�, \ STAPLE PATTERN E �� $2 S , TRIANGLE LAND
c� or 215� �. / / / I - OUTLET
Io / O DIVERSION BERM CHECK DAM \. / PARTNERS, LLC
/ 220.21 TO BE SEEDED W/ WEIR IN
WITHIN 7 DAYS CENTER
\
' o I I - - TYP
O
' n 218.39 220.21 1 DITCH #58 -p -p -r,1 _D
I \ TO BE REINFORCED � �
cp 217.92 WITH NAG S75
218 39 �c> STAPLE PATTERN D
o J )
/ / PO Box 5548
"PLACE MATTING IN FLOW PATH \ ' Cary, North Carolina 27512
THRU BASIN AFTER BASIN 14.02
J J AREA IS RECLAIMED `) Phone: (704) 608 3085
TEMPORARY SKIMMER BASIN #17 ?'o 10' UTILITY & /
DRAINAGE 83 r I
L=90', W=45', D=3' ,1N EASEMENT PROJECT INFORMATION
SIDE SLOPES= 2:1
Q TOP OF BASIN: 212.00' �:�' DITCH #59 /��
TO BE REINFORCED
N BOTTOM OF BASIN: 209.00' / W'
12' EMERGENCY SPILLWAY: 211,00' Z. WITH NAG S200
SIDE SLOPES OF BASIN ARE TO WITH
PATTERN E / , DESIGNED BY: CALEB
No
BE SEEDED WITHIN SEVEN DAYS- '� Q,1 J _/
*"ATTACH A 1.5" FAIRCLOTH SKIMMER \ to 1�N 84 , DRAWN BY: CALEB
(OR EQUAL) WITH 1.1" ORIFICE FOR ( Q O 1 ^h ®
W DEWATERING THE SEDIMENT CHECKED BY: SCOTT
\ ? 2' DITCH f
o5 BASIN DURING CONSTRUCTION. Q
U I n o' I BOTTOM ` / PROJECT NUMBER: 2000
ko
3 07.38 Know what's below.
I SHEET KEY Call before you dig. DRAWING SCALE
o
o
No
r r0 I o ! ��
�� - 3 HORIZONTAL: 1"=60'
o �:1
i / I STOCKPILE
C3.4 DATE RELEASED
l AREA u f � GRAPHIC SCALE
/ n � CHECK DAM �
W/ WEIR IN CENTER �O� C3.3 C3.2 APRIL 22 2024
60 0 30 60 120 240
o � SILT FENCE
r OUTLET
wo
�j. IN FEET SHEET NUMBER
o
^° � 3C 1 inch = 60 eft.
N V I I /�
p 190 -� „✓ -304
-THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED