HomeMy WebLinkAboutSW6240105_Plansheet - Grading/Drainage Plan_20240424 (3) ■
sl e
LEGEND: solutions
EiP Oo EIP-EXISTING IRON PIPE civil engineering I land surveying
MATCH LINE - SEE SHEET C-3.1 EPKO EPK-EXISTING PK NAIL 409 Chicago Drive,Suite 112,Fayetteville,NC 28306
ERB office 910-426-6777 fax 1910-426-5777 license number I C-2354
I < I b � . � 7117L I OERB-EXISTING REBAR wwwAUsitesolutions.com
J o COMPUTED POINT
1 - l
o 245 N/F - NOW OR FORMERLY
\ I rl� 1 10' PRIVATE f / �� R/W - RIGHT OF WAY
'
r ACCESS EASEMENT �J r I /I ♦ I PROPERTY LINE
0�,
c� �o \ __ � f _ _ ) ��� _ ADJACENT PROPERTY LINE ````� CARO//��
I I ♦ .•••• ••. I
� �� - � �� ��� TIE LINE ♦♦ '� � �i
I CA 1 I -- RIGHT-OF-WAY ♦�♦OQ.••FESS/0
I 1 �Z •O
2 w� WATER LINE
`" CA 6 _ / l PROJECTED 100-YR srs SEA
<'� WATER ELEVATION: OVERHEAD UTILITY i
54 55 TO BECSEEDED DITCH #6 7 11 12 238 94' �� 0274
WITHIN 7 DAYS TO BE REINFORCED CREEK
WITH NAG S75 MATTING / WETLANDS
STAPLE PATTERN D DIVERSION BERM TO REDIRECTCHE G NE ••.�v�1�♦�
WEIR N DAM W/. siI AWAY FROM ROAD DITCNON SEDIMENT-LADEN H.
A - � ) 1�) 30' 30' 30' VEGETATED BUFFER 'I���SL'OrT••g�``�`♦♦
CHECK DAM W/ / ( I EXISTING EASEMENT LINE /// �111'��,�����
DITCH #33 (TYP) � WEIR IN CENTER
TO BE REINFORCED WITH _ I - ♦ J I X FENCE LINE /'
TO BE SEEDED 243.71
P (T ) NAG C125 MATTING _ _ TEMPORARY SEDIMENT TRAP #1
WITHIN 7 DAYS 1� l L-001 00-i w l IMMEDIATELY UPON CONSTRUCTION L=60', W=30', D=4' = 240 \ \, TREE LINE U �Z �'y
_�Ol _001 _ 001 _ 0 l _ 001 _ 001_ 00l. v DIAL . . - .DUL . . . . .DI... DIV 0 D_30 SIDE SLOPES= 2:1
43.71 ► 242 - -\ DITCH #31 TOP OF BASIN: 240.00' ■ ����� �' 230 MAJOR CONTOUR
7 TO BE SEEDED �10' UTILITY & BOTTOM OF BASIN: 236.00'
232 MINOR CONTOUR
zao = f x 234.47 SPOT ELEVATION
WITHIN 7 DAYS 6' EMERGENCY SPILLWAY: 239.00'
ti°� �i DRAINAGE - REVISIONS
242 242.33 242.35 �42 24 p EASEMENT _ = SIDE SLOPES OF BASIN ARE TO """"' �" BENCHMARK
242.33 242.35 ^ BE SEEDED WITHIN SEVEN DAYS.
0
IV; SIGN SIGN
Y\ log O ' *PLACE MATTING IN FLOW PATH f, ` r
-- 240 __ = o THRU BASIN
IS AFTER MBASIN m SSTREET OLIGHT
DITCH #34 - 241.70 ti 241.70 � SFLOC S �- ��`
3�0 TO T( SEEDED 1 UTILITY �o LOC �fZUC`� DITCH 32 ' j�� INLET j / /
_ PPS UTILITY POLE
TO BE SEEDED' �� PROTECTION GUY WIRE
WITHIN 7 DAYS 1 0 11�.. (TYP) r f/ / ��
q . I WITHIN 7 DAYS UTj4j. `` l / r /
Y fq . 24723 J INSTALL ENDWALL PER ♦ / / / / 0 TELEPHONE AEDESTAL
NCDOT STANDARD 838.01
VE
FIRE HYDRANT
❑o WATER METER
CO PIPE 2 So, NAG S75 j
r m : I ® INV 234.65 MATTING 15 ASPHALT
47.00 LF @ 0.53% 48" CLASS IV RCP /
rl �S ' RIP RAP DISSIPATER �� /��G�)-4 PIPE 3 ( r i �- WETLANDS
o c 23 L=32' W=12' 36' ' ` G� 48.00 LF @ 0.52% 48" CLASS IV RCP *PLACE MATTING IN FLOW PATH / p h UNSUITABLE SOILS
48 47 n / INV 234.40� �i 1< 2`' ,�h 0
O r M �� D�10" DMA,r15" -233.94 - `�� c O INSTALL ENDWALL PER THRU BASIN AFTER BASIN 7 -loc-LOC-LIMITS OF CONSTRUCTION
< I 22 CLASS 1 22.5" THICK 23' ��° `��,Cp NCDOT STANDARD 838.01 AREA IS RECLAIMED =sF=�_ SILT FEhFOE L'
NE-
D �2' DITCH +11 234.40 T��TG,4,T ��d /TEMPORARY SEDIMENT TRAP 2 / / -aN -aN -JUTE NETTING
BOTTOM
#L=60', W=25', D=3.5' i
CO)I N Ir PTO BE REINFORCED DITCH #30 /� ccF -INV 234.65 SIDE SLOPES= 2:1 -ory-ory-DIVERSION BERM
8- S`S, -�' INLET PROTECTION
\ F J O TOP OF BASIN: 239.00' 14 p
WITH RIP RAP
3� �� \ IV_D50=8" ��F��TJ \1 Z 6' EMERGENCY SPILLWAY* 238,00' 1 254.gg
JBOTTOM OF BASIN:
r 1 I\n i T \ ii. SIDE SLOPES OF BASIN ARE TO ' � 256.24 \\
00.1 �� *RIP RAP TO DITCH 29 �' t*' 2 BE SEEDED WITHIN SEVEN DAYS. I o
BE INSTALLED TO BE REINFORCED INV 23�4.40 ti Ai rQ� s'. 1 s
1 /233.12 IMMIEDIATELY UPON WITH RIP RAP 23 \\ 13 254.04\_ 98
CONSTRUCTION _ -s., . 234.40 __ `..,
�� Dso-8" �' �� DITCH 28 DITCH #23 J 70 �s
a : 232.g3 / L � o # TO BE REINFORCED / �
-� TO BE REINFORCED (_ fn
I DITCH #7 ? I \ BOTTOM 232' DITCH5 WITH NAG S75 MATTING WITH
NA S75 MATTING
DNG �EPS�' N 254.06 EGG -
1 J pG NAG S75 STAPLE PATTERN D (l
TO BE REINFORCED I DITCH #8 ~ , �' MATTING \�A I\ v 2 w PROJECT NAME
WITH NAG S75 MATTING �/ o. o \\` 251.92
\ STAPLE PATTERN D� TO BE REINFORCED \ RIP RAP DISSIPATER �� _?1
n / / STAPLE PATTERN WITH NAG S75 MATTING 233.50 4 L=32' W=12'/36' �� ��o 10'DRAINAGE
GIEY & 251.g2
f \ Ds=10" DMA,r15"
24 f CLASS 1 22.5" THICK ` 2q2 EASEMENT �T' P� 5> 250 ELYSE
V vo ��F / MM�� PGC� S /�- LIMITS OF CONSTRUCTION
242.74 �NSv V(\\\ (24.3 AC)
45 46 t 21 �21242.,4 L Gw P�g�\G MEADOWS
� a� l v SO RI 16
^ - r242.85 " `
SILT
(N 245.04 2c � FENCING SUBDIVISION
�c ,-�Al32 . co ��L (TYP)
INLET �Q1 / / - .1 /. *241.51 1z DITCH 24 v
PROTECTION l ,�(�� \. #
(TYP) / / 233 TO BE REINFORCED _
DITCH #10 3 - �� a 241.51 L WITH NAG S75 MATTING
TO BE SEEDED 0� ° / *PLACE MATTING IN FLOW PATH STAPLE PATTERN D \ 245
WITHIN 7 DA i
_ YS 3 = e
0 2
00_LWO�L 00 MV 228.50 r�� - THRU BASIN AFTER BASIN I b3
25/ O AREA IS RECLAIMED ,- o
/ 39.29 /
231 232 232 DITCH #26 1 . V
PIPE 6 3° `1 TO BE REINFORCED `'a I of
41.50 LF @ 0.60% 18" CLASS IV RCP 228.25 2 ' RIP RAP DISSIPATER / = WITH NAG S75 MATTING I �l 23g.27
INV 228.25 L=9' W=4.5'/10.5' ^ �✓ STAPLE PATTERN D O,N 238.49
232 \ Dw=8" DMAIr12" !' \ ^� ° �L (� 234.75�238.50 /
DITCH #25 -� DETAILED
CLASS B 18" THICK I r ti� � / r `�
-gc �L� � v r,rr��\, �� DITCH #9 Oy �' TO BE REINFORCED
10' UTILITY EASEMENT DITCH #11 TO BE REINFORCED 2' DITCH 38.68 �3a WITH NAG S75 MATTING • ��
TO BE SEEDED \ WITH NAG S75 MATTING BOTTOM ��F\� / STAPLE PATTERN D
�\ STAPLE PATTERN D 24 GRADING AND
WITHIN 7 DAYS U N PF �40�, \-OC \ \
2' DITCH
BOTTOM � \ \o yg j 26 233.12. P�\J�10' UTILITY &
c� \ \ _/ p� G DRAINAGE EROSION
♦ 10� N-O EASEMENT
\\226.31 \�� TEMPORARY SKIMMER BASIN #4 _ No
U \ \ p L 80', W 40'_D 3' `Y _ TEMPORARY SEDIMENT TRAP #3 \ ➢ �' • �' CONTROL PLAN
�y' SIDE SLOPES= 2:1 L=65', W=30', D=4' n \ t`
GA J, .t _ 0 I
w n TOP OF BASIN: 227.00' CA 3 - SIDE SLOPES- 2:1 m
_ �� \ BOTTOM OF BASIN: 224.00' = TOP OF BASIN: 239.00' U) \
8
- 27 �\ u ' EMERGENCY SPILLWAY: 226.00' BOTTOM OF BASIN: 235.50' rn
28 0, INVERT OF SKIMMER: 224.00' = 6' EMERGENCY SPILLWAY: 238.00' \ `1'O * � N CLIENT
w PLACE MATTING IN FLOW PATH r SIDE SLOPES OF BASIN ARE TO SIDE SLOPES OF BASIN ARE TO so
Cn THRU BASIN AFTER BASIN BE SEEDED WITHIN SEVEN DAYS. BE SEEDED WITHIN SEVEN DAYS. z \�E <uT
AREA IS RECLAIMED \ \ **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) -1 5
(Q WITH 0.9" ORIFICE FOR DEWATERING THE CA2 11
U' TRIANGLE LAND
Ld C SEDIMENT BASIN DURING CONSTRUCTION. 20 \ /�
z - RIP RAP DISSIPATER -
�' � � L_3' W=1'/3' 3°' _- 30 PARTNERS LLC
_ Dsa 8" DMA,r12" �� , - /
U, ) x CLASS B 18" THICK 30 / s `1 `Y 1 I ♦ `1 `1 `1' `1
30 - -
i 0
00
-� I ♦ o z PO Box 5548
Cary, North Carolina 27512
+ �ii/ �� ��� / /I� �-" - ti t� _ , a ��s✓ \ ` J\ /� '� \ �I z Phone: (704) 608-3085
PROJECT INFORMATION
Q I I
N
N DESIGNED BY: CALEB
SHEET KEY
' I DRAWN BY: CALEB
c ' C3.1 CHECKED BY: SCOTT
0 I
N PROJECT NUMBER: 2000
m I
C3.4
C3.3 DRAWING SCALE
U
W
I I HORIZONTAL: 1"=60'
U I I DATE RELEASED
GRAPHIC SCALE
60 0 30 60 120 24o APRIL 22 2024
0 I Know what's below.
a
N I Call before you dig.
W ( IN FEET ) SHEET NUMBER
I I 1 inch = 60 ft.
aC -302
I
THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED