Loading...
HomeMy WebLinkAboutSW6240105_Plansheet - Grading/Drainage Plan_20240424 (2) 4Dsite LEGEND: I 11 solutions E P Oo EIP-EXISTING IRON PIPE I I \ / I civil engineering I land surveying EPKO EPK-EXISTING PK NAIL 409 Chicago Drive,Suite 112,Fayetteville,NC 28306 ERGO ERB-EXISTING REBAR I I \ / I office 910-426-6777 fax 1910-426-5777 license number I C-2354 I / wwwADsitesolutions.com a COMPUTED POINT N/F = NOW OR FORMERLY R/W RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE = TIE LINE I \ / — \\\ �\�� J`���-(N C AROC�2'j��i RIGHT-OF-WAY WAY \ 10 � \ _ ,4 w� WATER LINE /' �\ _ OVERHEAD UTILITY U I l SEA CREEK I \ 0274 - - WETLANDS �-L 30' 30' 30' VEGETATED BUFFER = / �- l � _a EXISTING EASEMENT LINE L I 01// '-� X FENCE LINE TREE LINE I I \ 04/--2Z-24/ / 230 MAJOR CONTOUR �, 232 MINOR CONTOUR _z � / REVISIONS x 2s-Qa SPOT ELEVATION I I \ ' / ' ( / - / 5�8 SIGN HMARK � / / J oS _ I m TRANSFORMER / PP N c STREET LIGHT I / / f . UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL C`�\D4 WATER VALVE ��� / � _ T --TEMPORARY �CfFIRE HYDRANT Z \ SR 122 W6 CONSTRUCTION —W6 0 WATER METER > \ ' 6(MCDOUGALL) ROAD C5 ENTRANCE _ / OASPHALT LOC_ � T� \>` \—��PUBLIC R/W ) WETLANDS LOC ( 1 �70Ti�G _'�\ -_� �i _ OOl a91 Ol / 01 INV 246.00 254 UNSUITABLE SOILS I OC � � � � - INV 248.15 —roc—roc— LIMITS OF CONSTRUCTION / _I� LO - I C� RIP RAP DISSIPATER�24g.70 249.77 � N I � —SF —SF — SILT FENCE LINE / LOC L=9' W=4.5/10.5' INLET 50 —.N —iN — JUTE NETTING / / / L C— Dso=8" DrAx--12" I PROTECTION \ 5 1 —olv—orv— DIVERSION BERM 5 / CLASS B 18" THICK-1 I 2TYP) �JC LOC— LOC LOC LOC DITCH #39 2 1 /�ti3 PIPE 4`n : SEEDEDTO BE OINLET PROTECTION 60.00 LF C� e 3.58% � o WITHIN 7 DAYS 18" CLASS V RCP of / 001 001 101 / � \ N I. II DITCH #2 p te�� 00 N / 102 / DITCH #1 TO BE SEEDED O / 10' UTILITY & / TO BE SEEDED I I WITHIN 7 DAYS 4 ♦DRAINAGE � J 1 I / I WITHIN 7 DAYS : j \ EASEMENT ' 1 Op f DITCH 43 I I / n \ TO BE REINFORCED 1 I I o PROJECT NAME 10' UTILIT 00) WITH NAG SC250 / �ry i 23Y EASEMENT�STAPLE PATTERN E �' �•� . . 3'F� / I I I N DITCH 40 '1 � DITCH OUTLET RIP RAP DISSIPATER I N I I LIMITS OF CONSTRUCTION # / TO BE DIRECTED A TO BE REINFORCED 252 �LI ��o _ - _ ` / L-9' W-4.5'/10.5 I I I o DITCH #41 (24.3 ACC J WITH NAG S75 MATTING ��0 2�a / r TOWARD WETLANDS ELYSE _ 219.76 _�Q� / i I , STAPLE PATTERN D .I ro / Ds�8" Or12' I N J TO BE REINFORCED �1 � * \ CASP ��QZ ���CLASS B 18" THICK 248.89 248.89 L-00,WITH NAG S75 MATTING �� / 50' R/w IqN CO i — —�1 z�' '. N u�. STAPLE PATTERN D I 10' UTILITY EASEMENT-00 OOl 00� ���� (PU U — INV 245.20 `INV 245.45 — . . �,,. . — . . — . . — — . . — . . — . . /2Sp i TEMPORARY ` MEADOWS � � — � � — � � 254 CS� � � 231.42 BUC RT � � 25 �� � . � N� � BASIN #13 N � 22g.73 230 & UTILITY / �C N L=80', W=40', D=3' o \ 235� ACCESS) ry�to \ 249.16 250 �S o SIDE SLOPES= 2:1 TEMPORARY SEDIMENT TRAP #9 \ 247.79 � hry/ \ h� CAS PIAN COURT / 0 �C BOTOTOM OF P OF BASIN? 242 00' 247.86 50.005LF C� 0.50% 18" CLASS IV RCP 50' R/W (PUBLIC & UTILITY ACCESS) �F��\ SUBDIVISION L=50', W=25', D=4' — _ 1 1 _ C.��" \ ro 10' EMERGENCY SPILLWAY: 244.00' SIDE SLOPES= 2:1 F 249.16 .. __ � n TOP OF BASIN: 216.00' DITCH 44 � - - i BOTTOM OF BASIN: 212.00' TO BE REINFORCED �� 248.49 I — � SE �g��E [fG� UTIUTY EASEMENT �5 INVERT OF SKIMMER: 2ARE T 25 SIDE SLOPES OF BASIN ARE TO — 248.49 — — — — r LSE BE SEEDED WITHIN SEVEN DAYS. 6' EMERGENCY SPILLWAY: 215.00' WITH NAG S200 CHECK DAM W/ L � .F ' ���E �E CQC� **ATTACH A 1.5" FAIRCLOTH SKIMMER SIDE SLOPES OF BASIN ARE TO �j / STAPLE PATTERN E / I o �C BE SEEDED WITHIN SEVEN DAYS. WEIR IN CENTER I DITCH SEEDED "� � (OR EQUAL) WITH 0.9" ORIFICE FOR (TYP) o I TO BE SEEDED DEWATERING THE SEDIMENT BASIN *PLACE MATTING IN FLOW PATH / / /J i l WITHIN 7 DAYS / DURING CONSTRUCTION. v THRU BASIN AFTER BASIN <I / * f AREA IS RECLAIMED r ' 4 IA' � \ PLACE MATTING IN FLOW PATH � °' DITCH / THRU BASIN AFTER BASIN X DITCH 3 I I m TO BE SEEDED#4 - AREA IS RECLAIMED CA 1 # 0° : 'WITHIN 7 DAYS / I TO BE SEEDED I I / / 57 WITHIN 7 DAYSo� �< 7 , DETAILED r- M� 0o I m l N'/ I -< - DIVERSION BERM TO REDIRECT > o NON SEDIMENT-LADEN RUNOFF :� / N 0 I AWAY FROM ROAD DITCH. J - - / (� GRADING AND SILT A TO BE REINFORCED WITH / / / > I FENCING I o0 NAG C125 MATTING �✓ �. PROJECTED 100-YR N J (TYP) �.t IMMEDIATELY UPON CONSTRUCTION J , WATER ELEVATION EROSION 8 CONTROL PLAN TCHLINE 2- SEE SHEET C_3 iil� �ii� ii� - i�- ii� .3 MATCH LINE — SEE SHEET C-3.2 CLIENT TRIANGLE LAND PARTNERS, LLC PO Box 5548 Cary, North Carolina 27512 Soto Phone: (704) 608-3085 O 2 D` N PROJECT INFORMATION M 0 N N DESIGNED BY: CALEB SHEET KEY 0 N o DRAWN BY: CALEB N N • C3� o CHECKED BY: SCOTT U `/ c� 05 z PROJECT NUMBER: 2000 m o C3.4 W C3.3 C3.2 z DRAWING SCALE W 0 0 HORIZONTAL: 1"=60' 0 DATE RELEASED N GRAPHIC SCALE 60 0 30 60 120 240 APRIL 22, 2024 Know what's below. Call before you dig. W ( IN FEET ) SHEET NUMBER 0 1 inch = 60 ft. —3ol a m THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED